Exam 5: Surveying and Mapping Techniques: Part A
Exam 1: Surveying and Compass25 Questions
Exam 2: Surveying and Levelling: Part A25 Questions
Exam 3: Surveying and Levelling: Part B25 Questions
Exam 4: Surveying and Levelling: Part C21 Questions
Exam 5: Surveying and Mapping Techniques: Part A25 Questions
Exam 6: Surveying and Mapping Techniques: Part B25 Questions
Exam 7: Surveying and Contouring Techniques24 Questions
Exam 8: Surveying and Linear Measurements19 Questions
Exam 9: Surveying Instruments and Methods23 Questions
Exam 10: Surveying and Gps Terminology and Techniques21 Questions
Exam 11: Surveying and Measurement Techniques: Part A24 Questions
Exam 12: Surveying and Measurement Techniques: Part B23 Questions
Exam 13: Surveying Terminology and Techniques: Part A24 Questions
Exam 14: Surveying Terminology and Techniques: Part B24 Questions
Exam 15: Surveying Terminology and Techniques: Part C24 Questions
Exam 16: Surveying Terminology: Contour Intervals, Tacheometry, Magnetic Variation25 Questions
Exam 17: Surveying Terminology: Bearings, Levelling, and Measurements25 Questions
Exam 18: Surveying Terminology and Methods25 Questions
Exam 19: Surveying Concepts and Techniques25 Questions
Exam 20: Surveying Techniques and Instruments21 Questions
Select questions type
After fixing the plane table to the tripod, the main operations which are needed at each plane table station are
i. levelling
ii. orientation
iii. centering
The correct sequence of these operations is
(Multiple Choice)
4.9/5
(37)
Intersection method of detailed plotting is most suitable for
(Multiple Choice)
4.7/5
(31)
The methods used for locating the plane table stations are
i. radiation
ii. traversing
iii. intersection
iv. resection
The correct answer is
(Multiple Choice)
4.7/5
(31)
Showing 21 - 25 of 25
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)