The item of the brick structure measured in sq.m, is

Free
(Multiple Choice)
4.9/5
(41)
Correct Answer:
Verified

B

The 'centre line method' is specially adopted for estimating

Free
(Multiple Choice)
4.8/5
(44)
Correct Answer:
Verified

B

Pick up the incorrect statement from the following:

Free
(Multiple Choice)
4.9/5
(39)
Correct Answer:
Verified

C

The measurement is not made in square meters in case of

(Multiple Choice)
4.7/5
(27)

In the mid-section formula

(Multiple Choice)
4.8/5
(31)

Pick up the item of work not included in the plinth area estimate

(Multiple Choice)
4.8/5
(37)

The following item of earth work is not measured separately.

(Multiple Choice)
4.9/5
(32)

If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by

(Multiple Choice)
4.9/5
(41)

The brick work is not measured in cu m in case of

(Multiple Choice)
4.8/5
(36)

The item of steel work which is measured in sq.m, is

(Multiple Choice)
4.8/5
(29)

For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is

(Multiple Choice)
4.9/5
(38)

The order of Taking dimensions is

(Multiple Choice)
4.9/5
(35)

According to ISI method of measurement, the order of the sequence is

(Multiple Choice)
4.9/5
(36)

Carpet area does not include the area of

(Multiple Choice)
4.9/5
(35)

The correct Prismoidal formula for volume is

(Multiple Choice)
4.9/5
(31)

Brick walls are measured in sq. m if the thickness of the wall is

(Multiple Choice)
4.8/5
(37)

The damp proof course (D.P.C.) is measured in

(Multiple Choice)
4.7/5
(40)