The item of the brick structure measured in sq.m, is
Free
(Multiple Choice)
4.9/5
(41)
Correct Answer:
B
The 'centre line method' is specially adopted for estimating
Free
(Multiple Choice)
4.8/5
(44)
Correct Answer:
B
Pick up the incorrect statement from the following:
Free
(Multiple Choice)
4.9/5
(39)
Correct Answer:
C
Pick up the item of work not included in the plinth area estimate
(Multiple Choice)
4.8/5
(37)
The following item of earth work is not measured separately.
(Multiple Choice)
4.9/5
(32)
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
(Multiple Choice)
4.9/5
(41)
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
(Multiple Choice)
4.9/5
(38)
According to ISI method of measurement, the order of the sequence is
(Multiple Choice)
4.9/5
(36)
Brick walls are measured in sq. m if the thickness of the wall is
(Multiple Choice)