Testing, fine-tuning, and evaluating the database and its applications are part of the ____ phase of the DBLC.

Free
(Multiple Choice)
4.8/5
(36)
Correct Answer:
Verified

D

The database administrator must be prepared to perform routine maintenance activities within the database.

Free
(True/False)
5.0/5
(42)
Correct Answer:
Verified

True

A(n) ____________________ is a carefully designed and constructed repository of facts that is a part of a larger whole known as an information system.

Free
(Short Answer)
4.9/5
(34)
Correct Answer:
Verified

database

The process of creating an information system is known as ____ development.

(Multiple Choice)
4.9/5
(33)

The design of the system's processes is completed during the ____ phase of the SDLC.

(Multiple Choice)
4.9/5
(32)

Systems analysis is used to determine the need for an information system and to establish its limits.

(True/False)
4.7/5
(40)

A detailed system specification is part of the ____ phase of the SDLC.

(Multiple Choice)
4.9/5
(34)

From a database point of view, the collection of data becomes meaningful only when the business ____________________ are defined.

(Short Answer)
4.9/5
(32)

Data integrity is enforced by the DBMS through the proper use of primary and foreign key rules.

(True/False)
4.9/5
(34)

The first step in developing the conceptual model using ER diagrams is to ____.

(Multiple Choice)
4.9/5
(36)

The database is loaded during the ____ phase of the SDLC.

(Multiple Choice)
4.8/5
(33)

To analyze the company situation, the database designer must discover what the company's operational components are, how they function, and how they interact.

(True/False)
4.7/5
(33)

In order to develop an accurate data ____________________, the designer must have a thorough understanding of the company's data types, extent, and uses.

(Short Answer)
4.8/5
(35)

In the detailed systems design phase, the designer starts the design of the system's processes.

(True/False)
4.9/5
(40)

____ allow(s) physical access to areas by authorized personnel only.

(Multiple Choice)
5.0/5
(37)

The proposed system is subject to limits known as ____________________, which are external to the system.

(Short Answer)
4.9/5
(41)

The maintenance and evolution phase of the DBLC involves ____.

(Multiple Choice)
4.9/5
(38)

An initial assessment of the information flow-and-extent requirements must be made during the ____________________ portion of the SDLC.

(Short Answer)
4.9/5
(34)

Making sure that the final product meets user and system requirements is the most critical ______________________________ phase.

(Short Answer)
4.8/5
(32)

The existing hardware and software systems are studied during the planning phase.

(True/False)
4.8/5
(37)
Showing 1 - 20 of 100