Exam 9: Database Design
Exam 1: Database Systems76 Questions
Exam 2: Data Models75 Questions
Exam 3: The Relational Database Model75 Questions
Exam 4: Entity Relationship Er Modeling75 Questions
Exam 5: Advanced Data Modeling85 Questions
Exam 6: Normalization of Database Tables110 Questions
Exam 7: Introduction to Structured Query Language Sql111 Questions
Exam 8: Advanced Sql109 Questions
Exam 9: Database Design103 Questions
Exam 10: Transaction Management and Concurrency Control85 Questions
Exam 11: Database Performance Tuning and Query Optimization85 Questions
Exam 12: Distributed Database Management Systems83 Questions
Exam 13: Business Intelligence and Data Warehouses75 Questions
Exam 14: Database Connectivity and Web Technologies85 Questions
Exam 15: Database Administration and Security86 Questions
Select questions type
A is an information system component that handles a specific business function, such as inventory, orders, or payroll.
(Short Answer)
4.9/5
(37)
The advent of very sophisticated application generators and has substantially decreased coding and testing time.
(Short Answer)
4.9/5
(30)
The database contents might be loaded interactively or in batch mode using a variety of methods and devices including customized user programs.
(True/False)
4.8/5
(37)
What are the factors affecting the purchasing decision for DBMS software?
(Essay)
4.7/5
(36)
The primary objective in database design is to create complete, normalized, nonredundant, and fully integrated conceptual, logical, and physical database models.
(True/False)
4.8/5
(38)
The testing and evaluation phase of the Database Life Cycle (DBLC) occurs after applications programming.
(True/False)
4.8/5
(31)
The database initial study phase of the Database Life Cycle (DBLC) involves .
(Multiple Choice)
4.8/5
(33)
allows the assignment of access rights to specific authorized users.
(Short Answer)
4.8/5
(39)
Producing the required information flow is part of the phase of the Database Life Cycle (DBLC).
(Multiple Choice)
4.8/5
(34)
is the process that establishes the need for, and the extent of, an information system.
(Short Answer)
4.8/5
(38)
The feasibility study during the planning phase of the Systems Development Life Cycle (SDLC) must address the:
(Multiple Choice)
4.8/5
(34)
The initial assessment and the feasibility study are part of the Systems Development Life Cycle's (SDLC's) ? phase.
(Multiple Choice)
4.9/5
(35)
The maintenance and evolution phase of the Database Life Cycle (DBLC) involves .
(Multiple Choice)
4.8/5
(36)
Decentralized design is typical of relatively simple, small databases and can be successfully done by a single person.
(True/False)
4.7/5
(34)
A system maintenance activity generated in response to changes in the business environment is referred to as corrective maintenance.
(True/False)
4.7/5
(27)
The Systems Development Life Cycle (SDLC) traces the history of an information system.
(True/False)
4.8/5
(39)
Coding, testing, and debugging are part of the phase of the Systems Development Life Cycle (SDLC).
(Multiple Choice)
4.8/5
(39)
allow end users to access the database without being able to download the information from their workstations.
(Short Answer)
4.8/5
(35)
Showing 41 - 60 of 103
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)