Accurate changes reflecting changes in __________ or changes in assets and processes need to be made to the disaster recovery plan.

(Multiple Choice)
4.9/5
(35)

Whether the recovery in question is a recovery test or a declared disaster,it is critical that _________ be involved at every step.

(Multiple Choice)
4.8/5
(42)

The disaster recovery test needs to have a set of __________so everyone knows whether the plan and the team have passed.

(Short Answer)
4.8/5
(41)

Realistic __________ should be assigned to each step of the plan.

(Multiple Choice)
4.9/5
(38)

Typically,there are times when pieces of the recovery plan are __________ from the change control process.