Exam 7: Disaster Recovery: Preparation and Implementation

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

List five contingency strategies that should be considered for LANs.

(Essay)
4.9/5
(35)

List five strategies that should be considered for distributed systems.

(Essay)
4.9/5
(34)

____ are likely in the event of a hacker attack,when the attacker retreats to a chat room and describes in specific detail to his or her associates the method and results of their latest conquest.

(Multiple Choice)
4.8/5
(31)

List five practices for Web site contingency planning.

(Essay)
4.8/5
(33)

When developing the LAN contingency plan,the contingency planning coordinator should identify ____ that affect critical systems or processes outlined in the BIA.

(Multiple Choice)
4.9/5
(31)

The purpose of the disaster recovery program is to provide for the direction and guidance of any and all disaster recovery operations.

(True/False)
4.8/5
(28)

Match each statement with an item below. -This group works with the remainder of the organization to assist in the recovery of nontechnology functions.

(Multiple Choice)
4.8/5
(38)

Match each statement with an item below. -This group may also interface with the data management group to restore data from backups to their storage areas.

(Multiple Choice)
4.9/5
(38)

____ system components are critical to ensure that a failure of a system component,such as a power supply,does not cause a system failure.

(Multiple Choice)
4.8/5
(44)

List five contingency strategies to be considered for Web sites.

(Essay)
4.9/5
(35)
Showing 41 - 50 of 50
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)