Exam 6: Systems Development Project Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

What is a business requirement?

(Multiple Choice)
4.8/5
(40)

Which of the following is not one of the four gates in the RUP methodology?

(Multiple Choice)
4.8/5
(32)

What is a simple bar chart that depicts project tasks against a calendar?

(Multiple Choice)
4.9/5
(32)

What are project assumptions?

(Multiple Choice)
4.8/5
(39)

The implementation phase involves taking all of the detailed design documents from the design phase and transforming them into the actual system.

(True/False)
4.9/5
(36)

Which software development methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirements?

(Multiple Choice)
4.8/5
(28)

What is the logical relationship that exists between the project tasks,or between a project task and a milestone?

(Multiple Choice)
4.8/5
(32)

What type of chart typically displays the critical path?

(Multiple Choice)
4.8/5
(39)

Which phase of the SDLC gathers business requirements?

(Multiple Choice)
4.8/5
(35)

What is it called when a company uses organisations from developing countries to write code and develop systems?

(Multiple Choice)
4.9/5
(37)

Who are individuals and organisations actively involved in the project or whose interests might be affected as a result of project execution or project completion?

(Multiple Choice)
4.9/5
(40)

The R in the SMART criteria for successful objective creation stands for _________.

(Short Answer)
4.9/5
(42)

Describe the two primary diagrams most frequently used in project planning.

(Not Answered)
This question doesn't have any answer yet
Ask our community

Which of the following is an outsourcing challenge caused by contract length?

(Multiple Choice)
4.7/5
(37)

What are the three primary variables (or triple constraints)in any project?

(Multiple Choice)
4.8/5
(34)

Describe the seven phases of the systems development life cycle.

(Not Answered)
This question doesn't have any answer yet
Ask our community

Explain project management and the role the triple constraints play when managing a project.

(Not Answered)
This question doesn't have any answer yet
Ask our community
Showing 61 - 77 of 77