Exam 6: Systems Development

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The project plan is a written definition of the project scope and is usually no longer than a paragraph.

(True/False)
4.9/5
(41)

Users should not be involved in the prototyping process.

(True/False)
4.7/5
(34)

Prototyping is an essential part of the RAD methodology.

(True/False)
4.8/5
(37)

_____ testing determines if a system meets the business requirements and enables end users to correctly perform their jobs.

(Short Answer)
4.8/5
(35)

What is a process of building a model that demonstrates the features of a proposed product, service, or system?

(Multiple Choice)
4.9/5
(36)

A(n) _____ defines the work to be done, the time frame, the metrics that will be used to measure the success of the systems development effort, and the costs.

(Short Answer)
4.8/5
(40)

What is the fourth and last step in the prototyping process?

(Multiple Choice)
4.8/5
(44)

The _____ methodology, a form of XP, aims for customer satisfaction through early and continuous delivery of useful software components.

(Short Answer)
4.8/5
(39)

Outsourcing is the delegation of specific work to a third party for a specified length of time, at a specified cost, and at a specified level of service.

(True/False)
4.9/5
(33)

Extreme programming (XP) methodology breaks the project down into many smaller pieces or phases.

(True/False)
4.8/5
(42)

In which SDLC phase do you build the platform for the proposed information system along with the database and the programs?

(Multiple Choice)
4.9/5
(35)

What is a common test that is performed to ensure the quality of the information system you are building?

(Multiple Choice)
4.8/5
(39)

The SDLC contains 7 phases. Which phase monitors and supports the new system to ensure it continues to meet your business goals?

(Multiple Choice)
4.8/5
(31)

During analysis, specific activities occur. Which of the following is not one of these activities?

(Multiple Choice)
4.8/5
(36)

Which of the following is not a main reason behind the rapid growth of the outsourcing industry?

(Multiple Choice)
4.9/5
(37)

The _____ of the SDLC involves determining a solid plan for developing your information system.

(Short Answer)
4.7/5
(32)

Which of the following systems development techniques requires IT specialists that are in-house to develop business applications?

(Multiple Choice)
4.8/5
(40)

Users begin using the new system during the _____ phase of the SDLC.

(Short Answer)
4.9/5
(37)

The implementation phase includes monitoring and supporting the new system to be sure it meets business goals.

(True/False)
4.9/5
(33)

The SDLC contains 7 phases. Which phase builds a technical blueprint of how the proposed system will work?

(Multiple Choice)
4.7/5
(42)
Showing 141 - 160 of 195
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)