Exam 9: Controlling Information Systems: Business Process and Application Controls

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The following is a list of 10 control plans. The following is a list of 10 control plans.   Required: Listed below are ten system failures that have control implications.On the blank line to the left of each number, insert the capital letter from the list above of the best control plan to prevent the system failure from occurring.If you can't find a control that will prevent the failure, choose a detective or corrective control plan.A letter should be used only once.  Required: Listed below are ten system failures that have control implications.On the blank line to the left of each number, insert the capital letter from the list above of the best control plan to prevent the system failure from occurring.If you can't find a control that will prevent the failure, choose a detective or corrective control plan.A letter should be used only once. The following is a list of 10 control plans.   Required: Listed below are ten system failures that have control implications.On the blank line to the left of each number, insert the capital letter from the list above of the best control plan to prevent the system failure from occurring.If you can't find a control that will prevent the failure, choose a detective or corrective control plan.A letter should be used only once.

(Essay)
4.7/5
(37)

A ___________________________________ is a tool that assists in evaluating the potential effectiveness of controls in a particular business process by matching control goals with relevant control plans.

(Short Answer)
4.9/5
(35)

Which of the following is a control plan that controls the entry of data by defining the acceptable format of each data field?

(Multiple Choice)
4.7/5
(36)

The control ________________________________________ informs the user that the input has been accepted for processing.

(Short Answer)
4.7/5
(26)

Which of the following control plans is designed both to authenticate a system user's identity and to verify the integrity of a message transmitted by that user?

(Multiple Choice)
5.0/5
(30)

Which of the following is a control plan that requests user input or asks questions that the user must answer?

(Multiple Choice)
4.8/5
(34)

The _____________________________________________ provides input control in those situations in which the serial numbers are assigned within the organization but later are not entered in perfect serial number sequence.

(Short Answer)
4.9/5
(33)

Input control goals include those for ensuring input validity, input ____________________, and input ____________________.

(Short Answer)
5.0/5
(39)

The purpose of security controls is to ensure that entity resources are protected from loss, destruction, disclosure, copying, sale, or other misuse.

(True/False)
4.7/5
(32)

The most error-prone and inefficient steps in an operations or information process is master file updates.

(True/False)
5.0/5
(36)

Which of the following is a control plan in which the source document is designed to make it easier to input data from the document?

(Multiple Choice)
4.8/5
(35)

Online prompting is aimed primarily at ensuring which of the following information systems control goals?

(Multiple Choice)
4.8/5
(44)

Input control goals include those to ensure input validity, input completeness and input accuracy.

(True/False)
4.9/5
(36)

A control that is primarily directed at ensuring input validity is:

(Multiple Choice)
4.8/5
(37)

A control plan in which a source document is designed to make it easier to prepare the document initially and later to input data from the document is called document design.

(True/False)
4.9/5
(39)

A check digit is an extra digit that is added to an identification number to help control the accuracy with which the number is entered into a computer system.

(True/False)
4.7/5
(44)

Preformatted screens describes a computer system's asking the user for input or asking questions that the user must answer.

(True/False)
4.8/5
(44)

A turnaround document is a document that is printed as an output of multiple computer processes and is used to capture and input a previous transaction.

(True/False)
4.8/5
(36)

Specifying control goals is the first step in building a control matrix.

(True/False)
4.7/5
(35)

A(n) ____________________ and ____________________ report is a computer-generated report that reflects the events--either in detail, summary total, or both--that were accepted by the system and rejected by the system.

(Short Answer)
4.8/5
(37)
Showing 81 - 100 of 126
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)