Exam 22: Systems Design, implementation, and Operation

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

________ is a process used to uncover and eliminate program errors.

(Multiple Choice)
4.9/5
(37)

The project committee for ALDI corporation is attempting to evaluate design alternatives proposed for a new,organization-wide accounting information system.However,there is a great deal of debate regarding whether source documents,turnaround documents,or source data automation should be utilized in the new system.Which design consideration is most appropriately associated with these alternatives?

(Multiple Choice)
4.8/5
(35)

In which phase of the SDLC does developing a general framework for implementing user requirements occur?

(Multiple Choice)
4.8/5
(42)

A(n)________ system test uses copies of real transaction and file records.

(Multiple Choice)
4.8/5
(38)

Which of the following control considerations will help ensure that the system is protected against (a)unauthorized physical and logical access to prevent the improper use,alteration,destruction,or disclosure of information and software?

(Multiple Choice)
4.7/5
(42)

Which of the following statements is true?

(Multiple Choice)
4.8/5
(31)

What type of conversion terminates the old system as soon as the new system is ready?

(Multiple Choice)
4.9/5
(31)

Which consideration below is not considered important to output design?

(Multiple Choice)
4.9/5
(35)

At what point in the systems development life cycle does the company determine how the conceptual AIS design is to be implemented?

(Multiple Choice)
5.0/5
(37)

________ is the process of installing hardware and software and getting the AIS up and running.

(Multiple Choice)
4.9/5
(42)

The project development committee for Photomat Incorporated is discussing output design alternatives for a new,organization-wide accounting information system.There is a heated debate among the team regarding whether the quarterly sales report be printed on paper,be viewable only on-screen,or be distributed as an e-mail.Mark prefers the report be printed on paper,while Jan prefers the report be distributed via e-mail to save trees.What output design consideration is the team debating?

(Multiple Choice)
4.8/5
(37)

It is not as efficient to enter data on paper,then enter the data into the system compared to requiring users to enter data directly into the system without using a paper source document.

(True/False)
4.8/5
(37)

Identify the report below that does not have a pre-specified content and format design.

(Multiple Choice)
4.9/5
(33)

________ is a system test that determines whether a program is operating as designed.

(Multiple Choice)
4.8/5
(36)

Which of the following lists represent the sequence of elements in developing the conceptual design specifications?

(Multiple Choice)
4.7/5
(31)

The hidden cost of inadequate training is that users turn for help to coworkers who have mastered the system,decreasing the productivity of coworkers and increasing company costs.

(True/False)
4.8/5
(30)

Program design

(Multiple Choice)
4.8/5
(33)

Step-by-step reviews of procedures or program logic early in the system design that focus on inputs,files,outputs,and data flows are called

(Multiple Choice)
4.8/5
(37)

Yasin,a professional in information technology services,received an e-mail from Sabri in the Sales department.The e-mail read: "Yasin,I need you to do something for me.Query sales data for the second quarter and pull out all of the invoices that include iPhones selling with a discount.I need a count and the total amount of the discount.Thanks,Sabri." What type of report is Sabri asking Yasin to prepare?

(Multiple Choice)
4.8/5
(29)

Which of the following is not one of the types of documentation that should be prepared for a new system?

(Multiple Choice)
4.8/5
(31)
Showing 41 - 60 of 105
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)