Exam 10: Determining How Costs Behave
Exam 1: The Manager and Management Accounting195 Questions
Exam 2: An Introduction to Cost Terms and Purposes224 Questions
Exam 3: Cost-Volume-Profit Analysis208 Questions
Exam 4: Job Costing199 Questions
Exam 5: Activity-Based Costing and Activity-Based Management176 Questions
Exam 6: Master Budget and Responsibility Accounting226 Questions
Exam 7: Flexible Budgets, direct-Cost Variances, and Management Control180 Questions
Exam 8: Flexible Budgets, overhead Cost Variances, and Management Control176 Questions
Exam 9: Inventory Costing and Capacity Analysis211 Questions
Exam 10: Determining How Costs Behave190 Questions
Exam 11: Decision Making and Relevant Information218 Questions
Exam 12: Strategy, balanced Scorecard, and Strategic Profitability Analysis172 Questions
Exam 13: Pricing Decisions and Cost Management210 Questions
Exam 14: Cost Allocation, customer-Profitability Analysis, and Sales-Variance Analysis167 Questions
Exam 15: Allocation of Support-Department Costs, common Costs, and Revenues150 Questions
Exam 16: Cost Allocation: Joint Products and Byproducts151 Questions
Exam 17: Process Costing149 Questions
Exam 18: Spoilage, rework, and Scrap153 Questions
Exam 19: Balanced Scorecard: Quality and Time151 Questions
Exam 20: Inventory Management, just-In-Time, and Simplified Costing Methods151 Questions
Exam 21: Capital Budgeting and Cost Analysis151 Questions
Exam 22: Management Control Systems, transfer Pricing, and Multinational Considerations153 Questions
Exam 23: Performance Measurement, compensation, and Multinational Considerations151 Questions
Select questions type
Which of the following statements is true of activity-based costing?
Free
(Multiple Choice)
4.8/5
(42)
Correct Answer:
A
Simple regression analysis estimates the relationship between the dependent variable and one independent variable.
Free
(True/False)
4.9/5
(32)
Correct Answer:
True
Simple regression analysis estimates the relationship between the dependent variable and one independent variable.
Free
(True/False)
4.9/5
(38)
Correct Answer:
True
A cost function is a mathematical description of how a cost changes with changes in the level of an activity relating to that cost.
(True/False)
4.9/5
(36)
Answer the following questions using the information below:
Uninder Company uses the high-low method to estimate the cost function. The information for 2015 is provided below:
Machine-hours Labor Costs Highest observation of cost driver 550 \ 22,000 Lowest observation of cost driver 250 \ 13,000
-What is the estimated total cost when 400 machine-hours are used?
(Multiple Choice)
4.8/5
(33)
Harold's Picture manufactures various picture frames.Each new employee takes 6 hours to make the first picture frame and 4.8 hours to make the second.The manufacturing overhead charge per hour is $25.
Required:
a.What is the learning-curve percentage,assuming the cumulative average method?
b.What is the time needed to build 8 picture frames by a new employee using the cumulative average-time method? You may use an index of ?0.1520.
c.What is the time needed to produce the 16th frame by a new employee using the incremental unit-time method? You may use an index of ?0.3219.
d.How much manufacturing overhead would be charged to the 16 picture frames using the average-time approach?
(Essay)
4.8/5
(30)
In using high-low method,the slope coefficient is calculated by dividing the difference between highest and lowest observations of the cost driver by the difference between costs associated with highest and lowest observations of the cost driver.
(True/False)
4.7/5
(25)
An "economy of scale" function is an example of a linear cost function.
(True/False)
4.8/5
(33)
Which of the following is an example of nonlinear cost function?
(Multiple Choice)
4.9/5
(39)
At the Auric Company, the cost of the personnel department has always been charged to production departments based upon number of employees. Recently, opinions gathered from the department managers indicate that the number of new hires might be a better predictor of personnel costs.
Total personnel department costs are \ 287,500 . Department Number of employees 70 280 225 Number of new hires 25 13 12
-If the number of new hires is considered the cost driver,what amount of personnel costs will be allocated to Department A?
(Multiple Choice)
4.7/5
(39)
Answer the following questions using the information below:
The Frontive Company has assembled the following data pertaining to certain costs that cannot be easily identified as either fixed or variable. Frontive Company has heard about a method of measuring cost functions called the high-low method and has decided to use it in this situation.
Cost Hours \ 24,700 5,000 26,000 5,500 34,000 7,500 45,370 10,300 38,000 9,500
-What is the estimated total cost at an operating level of 9,000 hours?
(Multiple Choice)
4.8/5
(37)
The account analysis method estimates cost functions ________.
(Multiple Choice)
4.9/5
(33)
Corise's Cola was to manufacture 500 cases of cola next week.The accountant provided the following analysis of total manufacturing costs. Variable Coefficient Standard Error t-Value Constant 115 82.73 1.39 Independent variable 230 105.50 2.18 =0.82 What is the estimated cost of producing the 500 cases of cola?
(Multiple Choice)
4.8/5
(34)
Answer the following questions using the information below:
Syosis Company uses the high-low method to estimate its cost function. The information for 2015 is provided below:
Machine-hours Costs Highest observation of cost driver 2,500 \ 300,000 Lowest observation of cost driver 1,500 \ 220,000
-What is the estimated total cost when 1,300 machine-hours are used?
(Multiple Choice)
4.8/5
(34)
As part of his job as cost analyst,Max Thompson collected the following information concerning the operations of the Machining Department:
Observation Machine-hours Total Operating Costs January 4,700 \ 43,000 February 5,060 45,395 March 4,180 42,535 April 4,500 43,600 May 4,250 42,890 Required:
a.Use the high-low method to determine the estimating cost function with machine-hours as the cost driver.
b.If June's estimated machine-hours are 4,300,calculate the total estimated costs of the Machining Department?
(Essay)
4.8/5
(35)
All other things being equal,the longer the time horizon the more likely a cost will be fixed.
(True/False)
4.8/5
(29)
In the estimation of a cost function using quantitative analysis,the independent variable ________.
(Multiple Choice)
4.8/5
(36)
Answer the following questions using the information below:
Syosis Company uses the high-low method to estimate its cost function. The information for 2015 is provided below:
Machine-hours Costs Highest observation of cost driver 2,500 \ 300,000 Lowest observation of cost driver 1,500 \ 220,000
-What is the slope coefficient?
(Multiple Choice)
4.8/5
(33)
Showing 1 - 20 of 190
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)