Exam 11: Flexible Budgets and Overhead Analysis

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Match the following terms with the items below: -Variable overhead spending variance

(Multiple Choice)
4.9/5
(38)

Fixed costs per month \ 240,000 Variable cost per setup \ 5,400 -Refer to the Figure.Suppose the company expects 25 setups in June.What would be the total budgeted costs of the setup activity?

(Multiple Choice)
4.9/5
(34)

Showcase Inc's standard variable overhead rate is $7 per direct labour hour,and each unit requires three standard direct labour hours.During April,Showcase recorded 7,000 actual direct labour hours,$65,000 actual variable overhead costs,and 2,950 units of product manufactured. What is Showcase's total variable overhead variance for April?

(Multiple Choice)
4.8/5
(32)

During the year,Plasticine produced 10,000 units,used 21,000 direct labour hours,and incurred variable overhead of $100,000.Budgeted variable overhead for the year was $88,000.The hours allowed per unit are 2.1.The standard variable overhead rate is $4.10 per direct labour hour.What was the variable overhead spending variance?

(Multiple Choice)
4.8/5
(28)

Why does activity flexible budgeting provide a more accurate prediction of costs than a traditional flexible budgeting approach?

(Multiple Choice)
4.9/5
(39)

Which of the following is the total fixed overhead variance?

(Multiple Choice)
4.9/5
(42)

For a static activity budget in a company already using an ABC or ABM system,the activities within the organization must be identified.

(True/False)
4.8/5
(35)

A before-the-fact flexible budget is used to compute what cost should have been for the actual level of activity.

(True/False)
4.7/5
(42)

A performance report compares actual costs with external benchmarks.

(True/False)
4.8/5
(39)

Fixed costs per month \ 240,000 Variable cost per setup \ 5,400 -Refer to the Figure.Which of the following is a flexible budget formula for the moving materials activity?

(Multiple Choice)
4.9/5
(39)

items: Overhead item Fixed cost Variable rate per direct labour hour Maintenance \ 8,000 \ 2.00 Power \ 2,000 \ 0.40 Direct labour \ 10.00 Equipment lease \ 5,000 Bridgestone normally produces 10,000 units (each unit requires 0.10 direct labour hours); however,this year 15,000 units were produced with the following actual costs: Overhead item Actual costs Maintenance \ 14,000 Power \ 3,600 Direct labour \ 16,000 Equipment lease \ 5,000 -Refer to the Figure.What is the fixed overhead volume variance?

(Multiple Choice)
4.9/5
(34)

Static budget Actual costs (20,000 hours ) (22,000 hours ) Direct materials \ 80,000 \ 87,000 Direct labour 160,000 174,000 Rent 48,000 50,000 Total \ 288,000 \ 311000 -Refer to the Figure.What is the flexible budget amount for the first quarter?

(Multiple Choice)
4.9/5
(30)

Which budget allows the determination of expected costs for various levels of activity?

(Multiple Choice)
4.8/5
(44)

Which of the following tasks is NOT required when building an activity-based budget?

(Multiple Choice)
4.9/5
(34)

When overhead is applied on the basis of direct labour hours,the variable overhead efficiency variance always has the same sign as the labour efficiency variance.

(True/False)
4.8/5
(37)

The difference between which two amounts is measured by the variable overhead spending variance?

(Multiple Choice)
4.8/5
(31)

Universal Forklifts,Inc.produces a specialized machine part used in forklifts.For last year's operations,the following data were gathered: Units produced: 60,000 Direct labour: 30,000 hours @\ 9.00 per hour Actual variable overhead: \ 150,000 Universal Forklifts employs a standard costing system.During the year,a variable overhead rate of $4.50 per hour was used.The labour standard requires a half hour per unit produced.What are the variable overhead spending and efficiency variances,respectively?

(Multiple Choice)
4.9/5
(26)

What does a performance report for variable overhead reveal?

(Multiple Choice)
4.9/5
(39)

Fixed overhead costs are resources acquired as used and needed.

(True/False)
4.8/5
(45)

Which of the following is characteristic of an after-the-fact flexible budget?

(Multiple Choice)
4.8/5
(35)
Showing 41 - 60 of 149
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)