"Analysis paralysis" means "analyzing a system to death" at the expense of reaching a conclusion.

(True/False)
4.8/5
(39)

In conducting a feasibility study,operational feasibility refers to whether:

(Multiple Choice)
4.9/5
(33)

An important deliverable from the analysis portion of a systems study is the final systems analysis report,which should be sent to the company's steering committee.

(True/False)
4.9/5
(31)

The information in PERT charts are commonly summarized in a second,bar chart called a:

(Multiple Choice)
4.7/5
(30)

In this chart,the circles represent:

(Multiple Choice)
4.8/5
(38)

Which of these is true when designing control procedures for a computer system?

(Multiple Choice)
4.9/5
(37)

In this chart,note that two arrows point to circle 5.This means that:

(Multiple Choice)
4.8/5
(45)

Most systems development life cycles consist of mutually exclusive activities,with little overlap between the stages.

(True/False)
4.7/5
(36)

An intensive investigation of a company's present information system in order to discover systems weaknesses is termed a:

(Multiple Choice)
4.9/5
(46)

Which of these should come first when performing a systems study?

(Multiple Choice)
4.9/5
(39)

Systems design usually comes after:

(Multiple Choice)
4.8/5
(31)

Which of these is most likely to be the first task in a systems study?

(Multiple Choice)
4.8/5
(40)

Once all facts and data have been collected in the systems survey,which of the following activities can begin?

(Multiple Choice)
4.9/5
(40)

When designing a computer?based information system,the initial step in the systems design process is to determine:

(Multiple Choice)
4.7/5
(45)

Which of these is not a logical procedure that is followed in the systems analysis phase of a systems study?

(Multiple Choice)
4.9/5
(45)

The information needs of operating managers are normally easier to determine than those of top managers because their decision making tends to be better defined and narrower in scope.

(True/False)
4.7/5
(37)

The "slack time" for a PERT activity represents the amount of time the activity can be delayed without delaying the entire project.

(True/False)
4.9/5
(35)

The members of a systems study team should be from the same discipline or area so that they can work together well.

(True/False)
4.9/5
(41)

When using a point-scoring system,the winner is usually the choice with:

(Multiple Choice)
4.8/5
(47)

Compared to top management's system information goals,obtaining the information needs of operating management is normally:

(Multiple Choice)
4.9/5
(41)