Deck 8: Capacity and Facilities Design

Full screen (f)
exit full mode
Question
Fixed-position layouts are used for projects when the product cannot be moved.
Use Space or
up arrow
down arrow
to flip the card.
Question
A process layout arranges activities sequentially.
Question
The basic objective of the facility layout decision is to ensure a smooth flow of inventory through the system.
Question
Product layouts are sometimes referred to as functional layouts.
Question
Product layouts have a higher degree of flexibility than process layouts.
Question
Minimizing material handling cost is an important objective for a process layout.
Question
General as opposed to specific purpose equipment is typically found in a process layout.
Question
The best operating level is the percent of capital cushion that minimizes unit cost.
Question
Increasing capacity utilization beyond the best operating level results in diseconomies of scale.
Question
A process layout groups similar activities together according to the functions they perform.
Question
Equipment utilization is typically very high in processes with a fixed-position layout.
Question
Shipbuilding is an example of production system requiring a process layout.
Question
The capacity cushion for a facility equals one minus utilization.
Question
Capacity can be increased in one large step or incrementally.
Question
Facility layout refers to the arrangement of machines,processes,departments,and other areas within a facility.
Question
For a given facility the best operating level equals the percent of capacity use that minimizes average unit cost.
Question
The major advantage of a process layout over a product layout is efficiency.
Question
The major layout concern for a process layout is where to locate departments or functional areas relative to each other.
Question
Material storage and movement are directly affected by facility layout decisions.
Question
An important advantage of a process layout over a product layout is efficiency.
Question
Precedence requirements reflect physical restrictions on the order in which operations are performed in a product layout.
Question
With a product layout the purpose of line balancing is to equalize the amount of work at each workstation.
Question
The majority of service facilities utilize process layouts.
Question
Cellular layouts reduce transit time and increase set-up.
Question
The efficiency of a flexible manufacturing system (FMS)comes from reductions in setup and waiting times.
Question
Line balancing strives to minimize bottlenecks in a process layout.
Question
The line-balancing procedure uses heuristics to specify which work elements are allocated to each workstation.
Question
Line balancing is a procedure that requires cycle time to be the same as flow time.
Question
A schematic diagram using weighted lines to denote location preference is called a relationship diagram.
Question
Most service facilities utilize fixed-position layouts.
Question
Line balancing is constrained by precedence requirements and cycle time restrictions.
Question
A flexible manufacturing system (FMS)combines flexibility with higher efficiency.
Question
A relationship diagram provides a standard format for displaying manager preferences for department locations.
Question
The balance delay is calculated by subtracting efficiency in percent from one hundred.
Question
The cycle time refers to the maximum amount of time a product is allowed to spend at each workstation.
Question
Block diagramming is a design tool for process layouts that takes into account the number of adjacent and non-adjacent moves.
Question
The maximum amount of time a product spends at any workstation is known as the bottleneck time.
Question
The time to complete a task in a mixed-model assembly line can vary from model to model.
Question
A mixed-model assembly line processes each model in large batch sizes.
Question
Cellular layouts combine the flexibility of process layouts with the efficiency of product layouts.
Question
A type of service layout designed to encourage browsing and increase impulse purchasing is known as a

A)free-flow layout.
B)grid layout.
C)loop layout.
D)spine layout.
Question
A ___ layout encourages customer familiarity,has low costs,and is easy to clean.

A)free-flow layout
B)grid layout
C)spine layout
D)loop layout
Question
Which one of the following is not an example of a basic facility layout?

A)fixed-position
B)mixed-model
C)product
D)process
Question
Two techniques used to design process layouts are

A)block diagramming and assembly line balancing.
B)relationship diagramming and assembling line balancing.
C)relationship diagramming and assembly line balancing.
D)block diagramming and relationship diagramming.
Question
With line balancing,the maximum amount of time the product is allowed to spend at each workstation is known as the

A)cycle time.
B)flow time.
C)efficiency of the line.
D)balance delay.
Question
A schematic diagram that uses weighted lines to denote location preference is known as a

A)block grid.
B)block diagram.
C)relationship grid.
D)relationship diagram.
Question
Which of the following describes a process layout?

A)Equipment is general purpose and the workers are unskilled.
B)Equipment is specialized and the workers are highly skilled.
C)Equipment is general purpose and the workers are highly skilled.
D)Equipment is specialized and the workers are unskilled.
Question
With a ___ layout activities are arranged in a line according to the sequence of operations.

A)product
B)process
C)fixed-position
D)cellular
Question
Most service organizations use

A)product layouts.
B)fixed-position layouts.
C)process layouts.
D)cellular layouts.
Question
Similar activities are grouped together in departments or work centres according to the function with a ___ layout.

A)process
B)fixed-position
C)hybrid
D)none of the above
Question
Which of the following statements is most true?

A)Product layouts are flexible; process layouts are efficient.
B)Product layouts are efficient; process layouts are flexible.
C)Product and process layouts are equally flexible; neither are efficient.
D)Product and process layout are equally efficient; neither are flexible.
Question
One of the best known computerized packages available for designing process layouts is CRAFT.CRAFT stands for

A)computerized relationship activity and flow technique.
B)computerized relative allocation of facilities technique.
C)computerized relative assembly and flow technology.
D)computerized relationship assembly flow time.
Question
A format for displaying manager preferences for departmental locations is known as a

A)relationship diagram.
B)process diagram.
C)block diagram.
D)hybrid diagram.
Question
Material handling equipment that can follow multiple paths,move in any direction,and carry large loads of in-process inventory is most likely to be associated with a ___ layout.

A)process
B)product
C)fixed-position
D)hybrid
Question
The material storage space required for in-process inventory is typically larger in

A)a cellular manufacturing layout.
B)a product layout.
C)a fixed-position layout.
D)a process layout.
Question
Which of the following is not an objective of effective layouts?

A)reduce material handling costs
B)increase the number of bottlenecks
C)eliminate waste and redundant activities
D)improve communication and interaction among workstations
Question
Which of the following is not a capacity expansion strategy?

A)capacity lead strategy
B)capacity lag strategy
C)capacity stability strategy
D)average capacity
Question
A ___ provides historical data on the movement of parts and materials between departments.

A)manufacturing chart
B)block diagram
C)relationship diagram
D)load summary chart
Question
The process of equalizing the amount of work at each workstation in a product layout is known as

A)block diagramming.
B)precedence requirements.
C)line balancing.
D)cycle time analysis.
Question
Single model and mixed model assembly lines are similar in layout and operation.
Question
Which of the following is not an "area" of disadvantage of cellular layouts?

A)cell balance
B)work-in-process inventory
C)capital investment
D)training and scheduling
Question
A company has a target output rate of 40 units every five (5)hours when its line is fully operational.To achieve this target the firm must have a cycle time of

A)more than 12.50 minutes.
B)more than 10.00 minutes.
C)7.5 minutes or less.
D)8 minutes or less.
Question
What type of layout is commonly used in services? What are some of the objectives associated with service layouts?
Question
An assembly line consists of three workstations (WS)with each station's activity time as shown. <strong>An assembly line consists of three workstations (WS)with each station's activity time as shown.   When fully operational this line could assemble ___ completed items every 60 minutes.</strong> A)20 B)15 C)12 D)5 <div style=padding-top: 35px> When fully operational this line could assemble ___ completed items every 60 minutes.

A)20
B)15
C)12
D)5
Question
In a product layout,the process of assigning tasks to work stations is referred to as ___ balancing.

A)station
B)product
C)line
D)work
Question
Which of the following is not an "area" of advantage of cellular layouts?

A)material handling
B)setup time
C)capital investment
D)control
Question
Briefly describe facility layout and the different objectives involved with facility layout decision.
Question
An assembly line consists of three workstations (WS)with each station's activity time as shown. <strong>An assembly line consists of three workstations (WS)with each station's activity time as shown.   The cycle time for this line is</strong> A)5 minutes. B)3 minutes. C)4 minutes. D)12 minutes. <div style=padding-top: 35px> The cycle time for this line is

A)5 minutes.
B)3 minutes.
C)4 minutes.
D)12 minutes.
Question
If the line currently assembles 10 units every hour when fully functional,then the line's balance delay at this rate of output is <strong>If the line currently assembles 10 units every hour when fully functional,then the line's balance delay at this rate of output is  </strong> A)66.67 %. B)33.33%. C)80.00%. D)20.00%. <div style=padding-top: 35px>

A)66.67 %.
B)33.33%.
C)80.00%.
D)20.00%.
Question
A company hopes to achieve a daily output of 200 units during 6 hours of production time.Assuming there is no lost time during the 6 hours of production,the desired cycle time to achieve the targeted level of output is

A)3.0 minutes.
B)1.8 minutes.
C)1.5 minutes.
D)0.03 minutes.
Question
Which one of the following is not an example of a hybrid facility layout?

A)fixed-position
B)mixed-model
C)cellular
D)flexible manufacturing
Question
A company wants to produce 150 units during a 7-hour day.The desired cycle time needed to achieve this level of output is

A)3.5 minutes.
B)3.25 minutes.
C)3.00 minutes.
D)2.8 minutes.
Question
___ is a group technology technique that reorders part routing matrices to identify families of parts with similar processing requirements.

A)Process flow analysis
B)Production flow analysis
C)Cycle analysis
D)Group analysis
Question
Which of the following is not an advantage of cellular layouts?

A)easier to automate
B)easier to control
C)increased work-in-process inventory
D)reduced setup time
Question
Which one of the following factors is not important to the design and operation of a mixed-model assembly line?

A)model sequencing
B)line balancing
C)u-shaped lines
D)all are factors
Question
Cycle time refers to

A)the time required for a product to go through a process layout.
B)the time between finished units coming off an assembly line.
C)the time needed to complete the tasks at a work station.
D)the difference between task time and work station time.
Question
An assembly line consists of three workstations (WS)with each station's activity time as shown. <strong>An assembly line consists of three workstations (WS)with each station's activity time as shown.   When fully operational the maximum output for this line in 8 hours of production time would be</strong> A)40 units. B)96 units. C)120 units. D)160 units. <div style=padding-top: 35px> When fully operational the maximum output for this line in 8 hours of production time would be

A)40 units.
B)96 units.
C)120 units.
D)160 units.
Question
To maximize an assembly line's efficiency,

A)the line's balance delay must be minimized.
B)the line's balance delay must be maximized.
C)the cycle time must be less than the flow time.
D)the flow time must be less than the cycle time.
Question
Briefly compare the storage and movement of material in a process layout and in a product layout.
Question
An assembly line consists of three workstations (WS)with each station's activity time as shown. <strong>An assembly line consists of three workstations (WS)with each station's activity time as shown.   The flow time for items on this line would be</strong> A)5 minutes. B)3 minutes. C)4 minutes. D)12 minutes. <div style=padding-top: 35px> The flow time for items on this line would be

A)5 minutes.
B)3 minutes.
C)4 minutes.
D)12 minutes.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/85
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 8: Capacity and Facilities Design
1
Fixed-position layouts are used for projects when the product cannot be moved.
True
2
A process layout arranges activities sequentially.
False
3
The basic objective of the facility layout decision is to ensure a smooth flow of inventory through the system.
False
4
Product layouts are sometimes referred to as functional layouts.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
5
Product layouts have a higher degree of flexibility than process layouts.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
6
Minimizing material handling cost is an important objective for a process layout.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
7
General as opposed to specific purpose equipment is typically found in a process layout.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
8
The best operating level is the percent of capital cushion that minimizes unit cost.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
9
Increasing capacity utilization beyond the best operating level results in diseconomies of scale.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
10
A process layout groups similar activities together according to the functions they perform.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
11
Equipment utilization is typically very high in processes with a fixed-position layout.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
12
Shipbuilding is an example of production system requiring a process layout.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
13
The capacity cushion for a facility equals one minus utilization.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
14
Capacity can be increased in one large step or incrementally.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
15
Facility layout refers to the arrangement of machines,processes,departments,and other areas within a facility.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
16
For a given facility the best operating level equals the percent of capacity use that minimizes average unit cost.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
17
The major advantage of a process layout over a product layout is efficiency.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
18
The major layout concern for a process layout is where to locate departments or functional areas relative to each other.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
19
Material storage and movement are directly affected by facility layout decisions.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
20
An important advantage of a process layout over a product layout is efficiency.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
21
Precedence requirements reflect physical restrictions on the order in which operations are performed in a product layout.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
22
With a product layout the purpose of line balancing is to equalize the amount of work at each workstation.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
23
The majority of service facilities utilize process layouts.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
24
Cellular layouts reduce transit time and increase set-up.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
25
The efficiency of a flexible manufacturing system (FMS)comes from reductions in setup and waiting times.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
26
Line balancing strives to minimize bottlenecks in a process layout.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
27
The line-balancing procedure uses heuristics to specify which work elements are allocated to each workstation.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
28
Line balancing is a procedure that requires cycle time to be the same as flow time.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
29
A schematic diagram using weighted lines to denote location preference is called a relationship diagram.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
30
Most service facilities utilize fixed-position layouts.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
31
Line balancing is constrained by precedence requirements and cycle time restrictions.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
32
A flexible manufacturing system (FMS)combines flexibility with higher efficiency.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
33
A relationship diagram provides a standard format for displaying manager preferences for department locations.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
34
The balance delay is calculated by subtracting efficiency in percent from one hundred.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
35
The cycle time refers to the maximum amount of time a product is allowed to spend at each workstation.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
36
Block diagramming is a design tool for process layouts that takes into account the number of adjacent and non-adjacent moves.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
37
The maximum amount of time a product spends at any workstation is known as the bottleneck time.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
38
The time to complete a task in a mixed-model assembly line can vary from model to model.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
39
A mixed-model assembly line processes each model in large batch sizes.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
40
Cellular layouts combine the flexibility of process layouts with the efficiency of product layouts.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
41
A type of service layout designed to encourage browsing and increase impulse purchasing is known as a

A)free-flow layout.
B)grid layout.
C)loop layout.
D)spine layout.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
42
A ___ layout encourages customer familiarity,has low costs,and is easy to clean.

A)free-flow layout
B)grid layout
C)spine layout
D)loop layout
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
43
Which one of the following is not an example of a basic facility layout?

A)fixed-position
B)mixed-model
C)product
D)process
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
44
Two techniques used to design process layouts are

A)block diagramming and assembly line balancing.
B)relationship diagramming and assembling line balancing.
C)relationship diagramming and assembly line balancing.
D)block diagramming and relationship diagramming.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
45
With line balancing,the maximum amount of time the product is allowed to spend at each workstation is known as the

A)cycle time.
B)flow time.
C)efficiency of the line.
D)balance delay.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
46
A schematic diagram that uses weighted lines to denote location preference is known as a

A)block grid.
B)block diagram.
C)relationship grid.
D)relationship diagram.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
47
Which of the following describes a process layout?

A)Equipment is general purpose and the workers are unskilled.
B)Equipment is specialized and the workers are highly skilled.
C)Equipment is general purpose and the workers are highly skilled.
D)Equipment is specialized and the workers are unskilled.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
48
With a ___ layout activities are arranged in a line according to the sequence of operations.

A)product
B)process
C)fixed-position
D)cellular
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
49
Most service organizations use

A)product layouts.
B)fixed-position layouts.
C)process layouts.
D)cellular layouts.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
50
Similar activities are grouped together in departments or work centres according to the function with a ___ layout.

A)process
B)fixed-position
C)hybrid
D)none of the above
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
51
Which of the following statements is most true?

A)Product layouts are flexible; process layouts are efficient.
B)Product layouts are efficient; process layouts are flexible.
C)Product and process layouts are equally flexible; neither are efficient.
D)Product and process layout are equally efficient; neither are flexible.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
52
One of the best known computerized packages available for designing process layouts is CRAFT.CRAFT stands for

A)computerized relationship activity and flow technique.
B)computerized relative allocation of facilities technique.
C)computerized relative assembly and flow technology.
D)computerized relationship assembly flow time.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
53
A format for displaying manager preferences for departmental locations is known as a

A)relationship diagram.
B)process diagram.
C)block diagram.
D)hybrid diagram.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
54
Material handling equipment that can follow multiple paths,move in any direction,and carry large loads of in-process inventory is most likely to be associated with a ___ layout.

A)process
B)product
C)fixed-position
D)hybrid
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
55
The material storage space required for in-process inventory is typically larger in

A)a cellular manufacturing layout.
B)a product layout.
C)a fixed-position layout.
D)a process layout.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
56
Which of the following is not an objective of effective layouts?

A)reduce material handling costs
B)increase the number of bottlenecks
C)eliminate waste and redundant activities
D)improve communication and interaction among workstations
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
57
Which of the following is not a capacity expansion strategy?

A)capacity lead strategy
B)capacity lag strategy
C)capacity stability strategy
D)average capacity
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
58
A ___ provides historical data on the movement of parts and materials between departments.

A)manufacturing chart
B)block diagram
C)relationship diagram
D)load summary chart
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
59
The process of equalizing the amount of work at each workstation in a product layout is known as

A)block diagramming.
B)precedence requirements.
C)line balancing.
D)cycle time analysis.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
60
Single model and mixed model assembly lines are similar in layout and operation.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
61
Which of the following is not an "area" of disadvantage of cellular layouts?

A)cell balance
B)work-in-process inventory
C)capital investment
D)training and scheduling
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
62
A company has a target output rate of 40 units every five (5)hours when its line is fully operational.To achieve this target the firm must have a cycle time of

A)more than 12.50 minutes.
B)more than 10.00 minutes.
C)7.5 minutes or less.
D)8 minutes or less.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
63
What type of layout is commonly used in services? What are some of the objectives associated with service layouts?
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
64
An assembly line consists of three workstations (WS)with each station's activity time as shown. <strong>An assembly line consists of three workstations (WS)with each station's activity time as shown.   When fully operational this line could assemble ___ completed items every 60 minutes.</strong> A)20 B)15 C)12 D)5 When fully operational this line could assemble ___ completed items every 60 minutes.

A)20
B)15
C)12
D)5
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
65
In a product layout,the process of assigning tasks to work stations is referred to as ___ balancing.

A)station
B)product
C)line
D)work
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
66
Which of the following is not an "area" of advantage of cellular layouts?

A)material handling
B)setup time
C)capital investment
D)control
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
67
Briefly describe facility layout and the different objectives involved with facility layout decision.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
68
An assembly line consists of three workstations (WS)with each station's activity time as shown. <strong>An assembly line consists of three workstations (WS)with each station's activity time as shown.   The cycle time for this line is</strong> A)5 minutes. B)3 minutes. C)4 minutes. D)12 minutes. The cycle time for this line is

A)5 minutes.
B)3 minutes.
C)4 minutes.
D)12 minutes.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
69
If the line currently assembles 10 units every hour when fully functional,then the line's balance delay at this rate of output is <strong>If the line currently assembles 10 units every hour when fully functional,then the line's balance delay at this rate of output is  </strong> A)66.67 %. B)33.33%. C)80.00%. D)20.00%.

A)66.67 %.
B)33.33%.
C)80.00%.
D)20.00%.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
70
A company hopes to achieve a daily output of 200 units during 6 hours of production time.Assuming there is no lost time during the 6 hours of production,the desired cycle time to achieve the targeted level of output is

A)3.0 minutes.
B)1.8 minutes.
C)1.5 minutes.
D)0.03 minutes.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
71
Which one of the following is not an example of a hybrid facility layout?

A)fixed-position
B)mixed-model
C)cellular
D)flexible manufacturing
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
72
A company wants to produce 150 units during a 7-hour day.The desired cycle time needed to achieve this level of output is

A)3.5 minutes.
B)3.25 minutes.
C)3.00 minutes.
D)2.8 minutes.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
73
___ is a group technology technique that reorders part routing matrices to identify families of parts with similar processing requirements.

A)Process flow analysis
B)Production flow analysis
C)Cycle analysis
D)Group analysis
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
74
Which of the following is not an advantage of cellular layouts?

A)easier to automate
B)easier to control
C)increased work-in-process inventory
D)reduced setup time
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
75
Which one of the following factors is not important to the design and operation of a mixed-model assembly line?

A)model sequencing
B)line balancing
C)u-shaped lines
D)all are factors
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
76
Cycle time refers to

A)the time required for a product to go through a process layout.
B)the time between finished units coming off an assembly line.
C)the time needed to complete the tasks at a work station.
D)the difference between task time and work station time.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
77
An assembly line consists of three workstations (WS)with each station's activity time as shown. <strong>An assembly line consists of three workstations (WS)with each station's activity time as shown.   When fully operational the maximum output for this line in 8 hours of production time would be</strong> A)40 units. B)96 units. C)120 units. D)160 units. When fully operational the maximum output for this line in 8 hours of production time would be

A)40 units.
B)96 units.
C)120 units.
D)160 units.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
78
To maximize an assembly line's efficiency,

A)the line's balance delay must be minimized.
B)the line's balance delay must be maximized.
C)the cycle time must be less than the flow time.
D)the flow time must be less than the cycle time.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
79
Briefly compare the storage and movement of material in a process layout and in a product layout.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
80
An assembly line consists of three workstations (WS)with each station's activity time as shown. <strong>An assembly line consists of three workstations (WS)with each station's activity time as shown.   The flow time for items on this line would be</strong> A)5 minutes. B)3 minutes. C)4 minutes. D)12 minutes. The flow time for items on this line would be

A)5 minutes.
B)3 minutes.
C)4 minutes.
D)12 minutes.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 85 flashcards in this deck.