Deck 3: Managing Processes and Capacity
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/29
Play
Full screen (f)
Deck 3: Managing Processes and Capacity
1
Most processes involve two basic types of flows:
A)Information flows and material flows.
B)Product flows and decision flows.
C)Information flows and operator flows.
D)Physical flows and security flows.
A)Information flows and material flows.
B)Product flows and decision flows.
C)Information flows and operator flows.
D)Physical flows and security flows.
Information flows and material flows.
2
One implication of increased utilization in a process is that:
A)Process cost typically will go up.
B)Waiting time typically will go up.
C)Variance typically will be reduced.
D)All of these.
A)Process cost typically will go up.
B)Waiting time typically will go up.
C)Variance typically will be reduced.
D)All of these.
Waiting time typically will go up.
3
Subcontracting is typically considered at what time horizon when doing capacity planning?
A)Short-term
B)Medium-term
C)Long-term
D)It is not part of the capacity planning process.
A)Short-term
B)Medium-term
C)Long-term
D)It is not part of the capacity planning process.
Medium-term
4
Process thinking causes managers to address critical process elements,including:
A)If you don't like the outcome,focus on the people.
B)Processes are guidelines to thinking about to best staff activities.
C)Processes drive measurement.
D)If you don't like the outcome,change the process.
A)If you don't like the outcome,focus on the people.
B)Processes are guidelines to thinking about to best staff activities.
C)Processes drive measurement.
D)If you don't like the outcome,change the process.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
5
An example of a short-term capacity increase decision is:
A)Adding specialized labor.
B)Installing new equipment.
C)Adding new facilities.
D)Adding low-skilled labor.
A)Adding specialized labor.
B)Installing new equipment.
C)Adding new facilities.
D)Adding low-skilled labor.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
6
Floor space used to store items to be inspected belongs to which of the following elements of a process?
A)Activities
B)Inputs/outputs/flows
C)Process structure
D)Management policies
A)Activities
B)Inputs/outputs/flows
C)Process structure
D)Management policies
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
7
Which of the following actions will NOT increase output?
A)Increasing capacity through physical additions.
B)Outsourcing.
C)Managing the flow of work into the system.
D)Changing the processes to eliminate unnecessary steps.
A)Increasing capacity through physical additions.
B)Outsourcing.
C)Managing the flow of work into the system.
D)Changing the processes to eliminate unnecessary steps.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
8
The following sequence shows four operations for a computer chip assembly process and the effective capacity of each. Step 1: 500 chips/hour
Step 2: 250 chips/hour
Step 3: 200 chips/hour
Step 4: 550 chips/hour
Suppose the utilization is 70 percent of effective capacity.What is the actual output of the process?
A)140 chips/hour
B)350 chips/hour
C)175 chips/hour
D)200 chips/hour
Step 2: 250 chips/hour
Step 3: 200 chips/hour
Step 4: 550 chips/hour
Suppose the utilization is 70 percent of effective capacity.What is the actual output of the process?
A)140 chips/hour
B)350 chips/hour
C)175 chips/hour
D)200 chips/hour
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
9
A bottleneck activity in a process is generally the activity with:
A)The smallest number of resources devoted to it.
B)The least capacity.
C)No delays in front of it.
D)The highest cost.
A)The smallest number of resources devoted to it.
B)The least capacity.
C)No delays in front of it.
D)The highest cost.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
10
Little's Law suggests that the key to increased throughput is:
A)Shorter flow times.
B)Fewer defects.
C)Eliminating waste.
D)Increased inspection.
A)Shorter flow times.
B)Fewer defects.
C)Eliminating waste.
D)Increased inspection.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
11
Under Juran's Law,whenever a problem occurs,what percentage of the time is the problem the result of a system/process error?
A)15 percent
B)50 percent
C)85 percent
D)100 percent
A)15 percent
B)50 percent
C)85 percent
D)100 percent
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
12
The following sequence shows four operations for a computer chip assembly process and the effective capacity of each.Which step is the bottleneck? Step 1: 500 chips/hour
Step 2: 250 chips/hour
Step 3: 200 chips/hour
Step 4: 550 chips/hour
A)Step 1
B)Step 2
C)Step 3
D)Step 4
Step 2: 250 chips/hour
Step 3: 200 chips/hour
Step 4: 550 chips/hour
A)Step 1
B)Step 2
C)Step 3
D)Step 4
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
13
You walk into a hair stylist shop.All stylists are busy and you sit in the waiting area.You are in which of the following basic activity types in a process?
A)Operation
B)Delay
C)Storage
D)You are not in a process activity.
A)Operation
B)Delay
C)Storage
D)You are not in a process activity.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
14
Which of the following is NOT a basic activity type in processes?
A)Delay
B)Operation
C)Reporting
D)Storage
A)Delay
B)Operation
C)Reporting
D)Storage
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
15
Joe Jones,plant manager at Waco Industries,told a friend that if it was necessary,his plant could produce 1,000 items a day if all conditions were just right.Joe is describing his plant's:
A)Effective capacity.
B)Yield rate.
C)Utilization.
D)Maximum capacity.
A)Effective capacity.
B)Yield rate.
C)Utilization.
D)Maximum capacity.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
16
Suppose you learn that a process has a very long waiting time.Which of the following would decrease the waiting time?
A)Decrease utilization.
B)Increase the coefficient of variation of job arrival times.
C)Increase the coefficient of variation of job processing times.
D)None of these would decrease waiting time.
A)Decrease utilization.
B)Increase the coefficient of variation of job arrival times.
C)Increase the coefficient of variation of job processing times.
D)None of these would decrease waiting time.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
17
Adam Smith described his company's process as follows: "Under ideal conditions we can produce 10,000 units a day.However,our normal production is 6,000 units a day.Today,we actually produced 8,000 units." Which of the following is true?
A)Utilization is 60 percent of maximum capacity.
B)Yield is 133 percent of effective capacity.
C)Utilization was 133 percent of effective capacity.
D)All of these are true.
A)Utilization is 60 percent of maximum capacity.
B)Yield is 133 percent of effective capacity.
C)Utilization was 133 percent of effective capacity.
D)All of these are true.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
18
Which of the following statements about economies of scale is NOT true?
A)One reason economies of scale occur is because fixed costs can be spread over more units of production as output increases.
B)One reason economies of scale occur is because employees become more efficient as volume increases.
C)Economies of scale refers to the fact that as volume increases,total cost of production decreases.
D)Economies of scale may not exist at all levels of production.
A)One reason economies of scale occur is because fixed costs can be spread over more units of production as output increases.
B)One reason economies of scale occur is because employees become more efficient as volume increases.
C)Economies of scale refers to the fact that as volume increases,total cost of production decreases.
D)Economies of scale may not exist at all levels of production.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
19
If a company can eliminate all sources of variance in a process:
A)It will be able to operate at maximum capacity at all times.
B)There will be no constraints in the process.
C)Continuous improvement will not be necessary.
D)None of these are true.
A)It will be able to operate at maximum capacity at all times.
B)There will be no constraints in the process.
C)Continuous improvement will not be necessary.
D)None of these are true.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
20
A manager is currently unhappy with the capabilities of a particular process and wants to improve its capabilities.To accomplish this,the manager needs to focus on the process:
A)Inputs,outputs,and flows.
B)Activities.
C)Management metrics.
D)Structure.
A)Inputs,outputs,and flows.
B)Activities.
C)Management metrics.
D)Structure.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
21
Which of the following statements best differentiates a delay from storage?
A)There is no difference - they both refer to the same concept.
B)Delays are planned activities; storages are not.
C)Delays are uncontrolled; storage is a planned part of a process.
D)Delays require control; storages does not.
A)There is no difference - they both refer to the same concept.
B)Delays are planned activities; storages are not.
C)Delays are uncontrolled; storage is a planned part of a process.
D)Delays require control; storages does not.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
22
Continual improvement of processes is important because:
A)Competitors are improving their processes.
B)Customer preferences change over time.
C)Technology is constantly changing.
D)All of these.
A)Competitors are improving their processes.
B)Customer preferences change over time.
C)Technology is constantly changing.
D)All of these.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
23
Inventory held due to bottlenecks in a process causes:
A)Increased storage requirements
B)Quality issues
C)Increased labor costs
D)All of these
A)Increased storage requirements
B)Quality issues
C)Increased labor costs
D)All of these
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
24
In process improvement projects,why should we focus our efforts on those processes that consume the most resources (e.g.,labor,space,capital,etc.)?
A)Because those are the processes most visible to the customer
B)Because those are the processes that use our firm's core capabilities
C)Because that is where we get "the most bang for our buck."
D)All of these
A)Because those are the processes most visible to the customer
B)Because those are the processes that use our firm's core capabilities
C)Because that is where we get "the most bang for our buck."
D)All of these
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following elements of a process most directly impacts or affects process capabilities?
A)Activities
B)Inputs/Outputs/Flows
C)Process Structure
D)Management Policies.
A)Activities
B)Inputs/Outputs/Flows
C)Process Structure
D)Management Policies.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
26
The total time that it takes to get one unit through a process is called:
A)Flow time
B)Cycle time
C)Throughput time
D)Wait time
A)Flow time
B)Cycle time
C)Throughput time
D)Wait time
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
27
Which two of the following effects directly result from bottlenecks?
A)Increase in costs and increase in defects.
B)Increase in output and increase in lead-times.
C)Decrease in inspections and increase in costs.
D)Decrease in output and increase in lead-times.
A)Increase in costs and increase in defects.
B)Increase in output and increase in lead-times.
C)Decrease in inspections and increase in costs.
D)Decrease in output and increase in lead-times.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
28
Space on the shop floor,bins,carts,or racks are capacity-limiting resources most frequently associated with which of the following process activities?
A)Delays
B)Transportation
C)Inspections
D)Operations.
A)Delays
B)Transportation
C)Inspections
D)Operations.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
29
A process having the same activity being performed by two or more resources simultaneously is said to have what kind of structure?
A)Serial
B)Parallel
C)Helping
D)Flexible
A)Serial
B)Parallel
C)Helping
D)Flexible
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck