Question
The shows the total standard time required to produce one end product in each work center required for its manufacture:

A) work center master
B) routing
C) bill of material
D) item master
Use Space or
up arrow
down arrow
to flip the card.
Question
Which of the following statements is best?

A) a bottleneck (capacity constraint resource) will control the throughput of all products processed by it
B) a time buffer should be established before a bottleneck
C) work centers feeding a bottleneck should work at full capacity
D) a and b are true
E) b and c are true
Question
Planning the flow of work requires production activity control to: I. Be sure the material needed is available.
II) Be sure the tooling needed is available.
III) Schedule the start and stop dates at each work center.
IV) Advise the plant supervisor of future orders.

A) all of the above
B) I, II and III
C) I, II and IV
D) II, III and IV
E) I, III and IV
Question
Operation overlapping means:

A) the same job running on two machines at the same time
B) using alternate routings
C) moving work to the next operation as a group of pieces is completed
D) running two or more jobs at the same time
E) locating work centers close together to reduce materials handling
Question
A production environment in which each unit or a small group of units is managed by a process created especially for that purpose is called

A) Intermittent
B) Job shop
C) Project
D) Flow
Question
A scheduling system in which the last operation on a routing is scheduled first and for completion on the due date is called:

A) forward scheduling
B) backward scheduling
C) infinite scheduling
D) finite scheduling
Question
Which file contains information on the efficiency and utilization of a work center?

A) item master
B) bill of material
C) routing
D) work center master
Question
All of the following are elements of manufacturing lead time EXCEPT:

A) design time
B) setup time
C) run time
D) wait time
E) move time
Question
Which of the following statements is best?

A) using a non-bottleneck 100% of the time produces 100% utilization
B) time saved at a non-bottleneck saves nothing
C) the capacity of a system depends on the capacity of the bottleneck
D) a and b only are true
E) b and c only are true
Question
A scheduling system that assumes the required capacity will always be available is called:

A) forward scheduling
B) backward scheduling
C) infinite scheduling
D) finite scheduling
Question
Which of the following statements is best?

A) implementation is achieved by issuing a shop order to manufacturing
B) engineering drawings, bills of material and routings may be included in a shop packet
C) the dispatch list is the instrument of priority control
D) all of the above are true
Question
Which of the following statements is true?
I) Throughput is the total volume of production passing through a facility.
II) Throughput is controlled by the total capacity of a system.
III) Work centers feeding bottlenecks should be 100% utilized.

A) I only is true
B) I and II only are true
C) II and III only are true
D) II only is true
E) III only is true
Question
Which of the following statements is best?

A) the largest element of manufacturing lead time is queue
B) the larger the load, the longer the queue
C) if queue is reduced, the lead time and work in process will be reduced
D) all of the above are true
Question
The activities of production activity control can be classified as: I. Planning.
II) Implementation.
III) Control.
IV) Process control.

A) I, II and III
B) I, II and IV
C) II, III and IV
D) I, III and IV
E) all of the above
Question
Which of the following are methods of reducing manufacturing lead time?
I) Subcontracting
II) Forward scheduling
III) Operation overlapping
IV) Operation splitting

A) all of the above
B) I and II
C) II and III
D) II and III
E) III and IV
Question
Which of the following files is used by PAC for planning?
I) Shop order master
II) Work center master
III) Item master
IV) Routing

A) I and II only
B) I and III only
C) II and III only
D) II, III and IV
Question
Work authorization can be classified under the function of:

A) planning
B) scheduling
C) implementation
D) load leveling
E) control
Question
Which of the following files will contain information on manufacturing lead time and lot size?

A) item master
B) bill of material
C) work center master
D) shop order master
Question
Which of the following are characteristics of intermittent manufacturing?
I) Work centers are arranged according to the routing.
II) Work centers are dedicated to producing a limited range of similar products.
III) Work flow through the shop is not constant.
IV) Throughput times are generally high.

A) I and II
B) I and III
C) I and IV
D) II and III
E) III and IV
Question
A shop order for 1000 pieces is to be processed on work station 123. The setup time is 4 hours and the run time per piece is .08 hours. What is the required capacity on this work center in standard hours?

A) 4.08
B) 0.08
C) 80
D) 84
E) 4000
Question
An order for 100 of a product is processed on work center 123. The setup time is 60 minutes and the run time is 5 minutes per piece. If the order is run on two machines in the work center, and the setups are made simultaneously, the elapsed time will be:

A) 560 minutes
B) 500 minutes
C) 250 minutes
D) 310 minutes
Question
If the previous backlog was 20 units, the planned input was 25 units and the planned output was 30 units the planned backlog would be:

A) 5 units
B) 10 units
C) 15 units
D) 20 units
E) 25 units
Question
Given the following data, which job(s) will be late if the shortest process time sequencing rule is used?
Today is day 100.
 Job  Process  Time  Due  Date  A 4104 B 1106 C 5109\begin{array} { l l l } \text { Job } & \begin{array} { l } \text { Process } \\\text { Time }\end{array} & \begin{array} { l } \text { Due } \\\text { Date }\end{array} \\\text { A } & 4 & 104 \\\text { B } & 1 & 106 \\\text { C } & 5 & 109\end{array}

A) all jobs will be on time
B) A and B will be late
C) A and C will be late
D) B and C will be late
Question
Which of the following dispatching rules ignore due dates?

A) first come, first served
B) earliest operation due date
C) shortest processing time
D) a and b above both ignore due dates
E) a and c above both ignore due dates
Question
Given the following information, which sequence will the orders be run in?
 ORDER  CRITICAL RATIO  A 1.5 B 1.0 C 0.7\begin{array} { c c } \text { ORDER } & \text { CRITICAL RATIO } \\\text { A } & 1.5 \\\text { B } & 1.0 \\\text { C } & 0.7\end{array}

A) ABC
B) BCA
C) ACB
D) CBA
E) BAC
Question
The planned backlog was:

A) 30
B) 36
C) 40
D) 42
E) 66
Question
The selection and sequencing of available jobs to be run at individual work stations and the assignment of these jobs to workers is called:

A) dispatching
B) scheduling
C) priority management
D) production control
Question
In a drum-buffer-rope scheduling system, the "drum" represents which of the following?

A) a drum of jobs to be selected
B) the master schedule for the operation
C) a safety stock of material
D) the constraint against too much being loaded into the master schedule
Question
If today is manufacturing day 100 and an order has a due date of 120 and a lead time remaining of 25 days, the critical ratio would be:

A) 0.8
B) 1.2
C) 1.25
D) 0.25
E) 0.2
Question
Which of the following is concerned with very short-term detailed planning of the flow of orders through manufacturing?

A) sales and operations planning
B) master production scheduling
C) MRP
D) production activity control
Question
Operation splitting means:

A) the same job running on two jobs at the same time
B) moving work to the next operation as a batch is completed
C) running two or more jobs at the same time on the same machine
D) locating work centers close together to reduce materials handling
Question
The following information is to be used in this and the next question. For the last week a work center had a planned input of 40 standard hours and an actual input of 36 standard hours. The planned output was 40, the actual output 42 standard hours and the beginning backlog was 30 hours. The cumulative input variance was:

A) 0
B) -2
C) +2
D) -4
E) +4
Question
A scheduling system that assumes the required capacity will NOT always be available is called:

A) forward scheduling
B) backward scheduling
C) infinite scheduling
D) finite scheduling
Question
Which of the following is NOT a principle of managing bottlenecks?

A) a time buffer should be established after each bottleneck
B) the rate of material fed to a bottleneck should be controlled
C) do anything to increase the capacity of a bottleneck
D) use alternate routings
E) change the schedule
Question
Operation overlapping means:

A) using alternate routings
B) moving work to the next operation as a batch is completed
C) running two or more jobs at the same time on the same machine
D) locating work centers close together to reduce materials handling
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/35
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 6: Production Activity Control
1
The shows the total standard time required to produce one end product in each work center required for its manufacture:

A) work center master
B) routing
C) bill of material
D) item master
B
2
Which of the following statements is best?

A) a bottleneck (capacity constraint resource) will control the throughput of all products processed by it
B) a time buffer should be established before a bottleneck
C) work centers feeding a bottleneck should work at full capacity
D) a and b are true
E) b and c are true
D
3
Planning the flow of work requires production activity control to: I. Be sure the material needed is available.
II) Be sure the tooling needed is available.
III) Schedule the start and stop dates at each work center.
IV) Advise the plant supervisor of future orders.

A) all of the above
B) I, II and III
C) I, II and IV
D) II, III and IV
E) I, III and IV
B
4
Operation overlapping means:

A) the same job running on two machines at the same time
B) using alternate routings
C) moving work to the next operation as a group of pieces is completed
D) running two or more jobs at the same time
E) locating work centers close together to reduce materials handling
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
5
A production environment in which each unit or a small group of units is managed by a process created especially for that purpose is called

A) Intermittent
B) Job shop
C) Project
D) Flow
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
6
A scheduling system in which the last operation on a routing is scheduled first and for completion on the due date is called:

A) forward scheduling
B) backward scheduling
C) infinite scheduling
D) finite scheduling
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
7
Which file contains information on the efficiency and utilization of a work center?

A) item master
B) bill of material
C) routing
D) work center master
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
8
All of the following are elements of manufacturing lead time EXCEPT:

A) design time
B) setup time
C) run time
D) wait time
E) move time
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
9
Which of the following statements is best?

A) using a non-bottleneck 100% of the time produces 100% utilization
B) time saved at a non-bottleneck saves nothing
C) the capacity of a system depends on the capacity of the bottleneck
D) a and b only are true
E) b and c only are true
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
10
A scheduling system that assumes the required capacity will always be available is called:

A) forward scheduling
B) backward scheduling
C) infinite scheduling
D) finite scheduling
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
11
Which of the following statements is best?

A) implementation is achieved by issuing a shop order to manufacturing
B) engineering drawings, bills of material and routings may be included in a shop packet
C) the dispatch list is the instrument of priority control
D) all of the above are true
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following statements is true?
I) Throughput is the total volume of production passing through a facility.
II) Throughput is controlled by the total capacity of a system.
III) Work centers feeding bottlenecks should be 100% utilized.

A) I only is true
B) I and II only are true
C) II and III only are true
D) II only is true
E) III only is true
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
13
Which of the following statements is best?

A) the largest element of manufacturing lead time is queue
B) the larger the load, the longer the queue
C) if queue is reduced, the lead time and work in process will be reduced
D) all of the above are true
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
14
The activities of production activity control can be classified as: I. Planning.
II) Implementation.
III) Control.
IV) Process control.

A) I, II and III
B) I, II and IV
C) II, III and IV
D) I, III and IV
E) all of the above
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
15
Which of the following are methods of reducing manufacturing lead time?
I) Subcontracting
II) Forward scheduling
III) Operation overlapping
IV) Operation splitting

A) all of the above
B) I and II
C) II and III
D) II and III
E) III and IV
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
16
Which of the following files is used by PAC for planning?
I) Shop order master
II) Work center master
III) Item master
IV) Routing

A) I and II only
B) I and III only
C) II and III only
D) II, III and IV
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
17
Work authorization can be classified under the function of:

A) planning
B) scheduling
C) implementation
D) load leveling
E) control
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
18
Which of the following files will contain information on manufacturing lead time and lot size?

A) item master
B) bill of material
C) work center master
D) shop order master
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
19
Which of the following are characteristics of intermittent manufacturing?
I) Work centers are arranged according to the routing.
II) Work centers are dedicated to producing a limited range of similar products.
III) Work flow through the shop is not constant.
IV) Throughput times are generally high.

A) I and II
B) I and III
C) I and IV
D) II and III
E) III and IV
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
20
A shop order for 1000 pieces is to be processed on work station 123. The setup time is 4 hours and the run time per piece is .08 hours. What is the required capacity on this work center in standard hours?

A) 4.08
B) 0.08
C) 80
D) 84
E) 4000
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
21
An order for 100 of a product is processed on work center 123. The setup time is 60 minutes and the run time is 5 minutes per piece. If the order is run on two machines in the work center, and the setups are made simultaneously, the elapsed time will be:

A) 560 minutes
B) 500 minutes
C) 250 minutes
D) 310 minutes
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
22
If the previous backlog was 20 units, the planned input was 25 units and the planned output was 30 units the planned backlog would be:

A) 5 units
B) 10 units
C) 15 units
D) 20 units
E) 25 units
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
23
Given the following data, which job(s) will be late if the shortest process time sequencing rule is used?
Today is day 100.
 Job  Process  Time  Due  Date  A 4104 B 1106 C 5109\begin{array} { l l l } \text { Job } & \begin{array} { l } \text { Process } \\\text { Time }\end{array} & \begin{array} { l } \text { Due } \\\text { Date }\end{array} \\\text { A } & 4 & 104 \\\text { B } & 1 & 106 \\\text { C } & 5 & 109\end{array}

A) all jobs will be on time
B) A and B will be late
C) A and C will be late
D) B and C will be late
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
24
Which of the following dispatching rules ignore due dates?

A) first come, first served
B) earliest operation due date
C) shortest processing time
D) a and b above both ignore due dates
E) a and c above both ignore due dates
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
25
Given the following information, which sequence will the orders be run in?
 ORDER  CRITICAL RATIO  A 1.5 B 1.0 C 0.7\begin{array} { c c } \text { ORDER } & \text { CRITICAL RATIO } \\\text { A } & 1.5 \\\text { B } & 1.0 \\\text { C } & 0.7\end{array}

A) ABC
B) BCA
C) ACB
D) CBA
E) BAC
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
26
The planned backlog was:

A) 30
B) 36
C) 40
D) 42
E) 66
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
27
The selection and sequencing of available jobs to be run at individual work stations and the assignment of these jobs to workers is called:

A) dispatching
B) scheduling
C) priority management
D) production control
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
28
In a drum-buffer-rope scheduling system, the "drum" represents which of the following?

A) a drum of jobs to be selected
B) the master schedule for the operation
C) a safety stock of material
D) the constraint against too much being loaded into the master schedule
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
29
If today is manufacturing day 100 and an order has a due date of 120 and a lead time remaining of 25 days, the critical ratio would be:

A) 0.8
B) 1.2
C) 1.25
D) 0.25
E) 0.2
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
30
Which of the following is concerned with very short-term detailed planning of the flow of orders through manufacturing?

A) sales and operations planning
B) master production scheduling
C) MRP
D) production activity control
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
31
Operation splitting means:

A) the same job running on two jobs at the same time
B) moving work to the next operation as a batch is completed
C) running two or more jobs at the same time on the same machine
D) locating work centers close together to reduce materials handling
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
32
The following information is to be used in this and the next question. For the last week a work center had a planned input of 40 standard hours and an actual input of 36 standard hours. The planned output was 40, the actual output 42 standard hours and the beginning backlog was 30 hours. The cumulative input variance was:

A) 0
B) -2
C) +2
D) -4
E) +4
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
33
A scheduling system that assumes the required capacity will NOT always be available is called:

A) forward scheduling
B) backward scheduling
C) infinite scheduling
D) finite scheduling
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
34
Which of the following is NOT a principle of managing bottlenecks?

A) a time buffer should be established after each bottleneck
B) the rate of material fed to a bottleneck should be controlled
C) do anything to increase the capacity of a bottleneck
D) use alternate routings
E) change the schedule
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
35
Operation overlapping means:

A) using alternate routings
B) moving work to the next operation as a batch is completed
C) running two or more jobs at the same time on the same machine
D) locating work centers close together to reduce materials handling
Unlock Deck
Unlock for access to all 35 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 35 flashcards in this deck.