Deck 13: Six Sigma Quality Management
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/134
Play
Full screen (f)
Deck 13: Six Sigma Quality Management
1
Lean systems eliminate waste but can result in all of the following except?
A) Bottlenecked processes
B) Increased inventory levels
C) Poor quality
D) Delivery timing issues
A) Bottlenecked processes
B) Increased inventory levels
C) Poor quality
D) Delivery timing issues
B
2
In Six Sigma, the goal of quality perfection is represented by having a process sample average that falls below a control limit that is placed how far above the true process mean?
A) Three standard deviations
B) One standard deviation
C) Six standard deviations
D) Four standard deviations
A) Three standard deviations
B) One standard deviation
C) Six standard deviations
D) Four standard deviations
C
3
For lean practices to be successful, all of the following must meet or exceed quality requirements except?
A) Parts/assemblies
B) MRO inventory
C) Work-in-process
D) Finished goods
A) Parts/assemblies
B) MRO inventory
C) Work-in-process
D) Finished goods
B
4
Approximately what percentage of Fortune 500 firms currently use Six Sigma?
A) 10
B) 20
C) 25
D) 50
A) 10
B) 20
C) 25
D) 50
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
5
A typical automobile may have approximately how many OFD?
A) 1,000
B) 2,000
C) 10,000
D) 20,000
A) 1,000
B) 2,000
C) 10,000
D) 20,000
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
6
Which U.S. automaker was the first to adopt Six Sigma?
A) GM
B) Ford
C) Chevrolet
D) Tesla
A) GM
B) Ford
C) Chevrolet
D) Tesla
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
7
In Six Sigma, OFD refers to?
A) Opportunities for a dissatisfied customer to occur
B) Opportunities for a dismissal to occur
C) Opportunities for a defect to occur
D) Opportunities for a divergence to occur
A) Opportunities for a dissatisfied customer to occur
B) Opportunities for a dismissal to occur
C) Opportunities for a defect to occur
D) Opportunities for a divergence to occur
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
8
Which of the following is an example of a lean production initiative?
A) Rearranging factory floor layouts
B) Using statistical quality control charts
C) Developing long-term relationships with excellent suppliers
D) Reducing delivery problems
A) Rearranging factory floor layouts
B) Using statistical quality control charts
C) Developing long-term relationships with excellent suppliers
D) Reducing delivery problems
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
9
In Six Sigma, DPMO refers to?
A) Detections per millions opportunities
B) Detections per manufacturing output
C) Defects per million opportunities
D) Defects per manufacturing output
A) Detections per millions opportunities
B) Detections per manufacturing output
C) Defects per million opportunities
D) Defects per manufacturing output
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
10
The target maximum defect rate of a Six Sigma process is how many parts per million?
A) 1.0
B) 2.5
C) 3.4
D) 4.4
A) 1.0
B) 2.5
C) 3.4
D) 4.4
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
11
A kayak manufacturer produces a product for which there are 35 possible defect opportunities. If in the course of a week the company makes 243 units and discovers 72 total defects, which value below most closely corresponds to the manufacturer's sigma level?
A) 2
B) 3
C) 4
D) 5
A) 2
B) 3
C) 4
D) 5
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
12
A toy manufacturer produces a product for which there are 10 possible defect opportunities. If in the course of a week the company makes 1,000 units and discovers 17 total defects, what is the manufacturer's DPMO?
A) 17
B) 1000
C) 1700
D) 17000
A) 17
B) 1000
C) 1700
D) 17000
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
13
Successful Six Sigma projects are likely to accomplish all of the following except?
A) Meet strategic business objectives
B) Reduce product/service variation
C) Increase inventory levels
D) Produce a product/service that satisfies the customer
A) Meet strategic business objectives
B) Reduce product/service variation
C) Increase inventory levels
D) Produce a product/service that satisfies the customer
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
14
A toy manufacturer produces a product for which there are 10 possible defect opportunities. If in the course of a week the company makes 1,000 units and discovers 17 total defects, which value below most closely corresponds to the manufacturer's sigma level?
A) 3.0
B) 4.0
C) 4.5
D) 6.0
A) 3.0
B) 4.0
C) 4.5
D) 6.0
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
15
Which company was the first large-scale adopter of Six Sigma?
A) GE
B) Motorola
C) IBM
D) GM
A) GE
B) Motorola
C) IBM
D) GM
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
16
A five sigma level would have an expected DPMO of?
A) 3.4
B) 233
C) 2330
D) 3440
A) 3.4
B) 233
C) 2330
D) 3440
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
17
DPMO is calculated as?
A) DPMO = OFD per unit / (number of defects)(number of units)
B) DPMO = number of units / (OFD per unit)(number of defects)
C) DPMO = number of defects / (OFD per unit)(number of units)
D) DPMO = number of units)(OFD per unit)(number of defects
A) DPMO = OFD per unit / (number of defects)(number of units)
B) DPMO = number of units / (OFD per unit)(number of defects)
C) DPMO = number of defects / (OFD per unit)(number of units)
D) DPMO = number of units)(OFD per unit)(number of defects
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
18
A quality philosophy that drives a firm to lower prices, higher quality, and fast response is referred to as?
A) Lean manufacturing
B) Critical path method
C) Process capability
D) Six Sigma
A) Lean manufacturing
B) Critical path method
C) Process capability
D) Six Sigma
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
19
Which company pioneered Six Sigma?
A) GE
B) Motorola
C) IBM
D) GM
A) GE
B) Motorola
C) IBM
D) GM
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
20
A kayak manufacturer produces a product for which there are 35 possible defect opportunities. If in the course of a week the company makes 243 units and discovers 72 total defects, what is the manufacturer's DPMO?
A) 243
B) 8466
C) 21323
D) 24658
A) 243
B) 8466
C) 21323
D) 24658
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
21
Ending a reliance on numerical goals would be associated with which of Deming's 14 Points for Management?
A) Drive out fear
B) Eliminate quotas for workers and managers
C) Break down barriers between departments
D) Take action to accomplish the transformation
A) Drive out fear
B) Eliminate quotas for workers and managers
C) Break down barriers between departments
D) Take action to accomplish the transformation
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
22
The use of cross-functional teams would be associated with which of Deming's 14 Points for Management?
A) Drive out fear
B) Eliminate numerical quotas for workers and managers
C) Break down barriers between departments
D) Take action to accomplish the transformation
A) Drive out fear
B) Eliminate numerical quotas for workers and managers
C) Break down barriers between departments
D) Take action to accomplish the transformation
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
23
Deming described his Theory of Management in which book?
A) Out of Denial
B) Out of Crisis
C) Out of Complications
D) Out of Africa
A) Out of Denial
B) Out of Crisis
C) Out of Complications
D) Out of Africa
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
24
The combination of lean and Six Sigma is referred to as?
A) Sigma Six Lean
B) Lean Sigma Six
C) Lean Six Sigma
D) Six Sigma Lean
A) Sigma Six Lean
B) Lean Sigma Six
C) Lean Six Sigma
D) Six Sigma Lean
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
25
All of the following individuals are commonly associated with Six Sigma philosophy and tools except?
A) Deming
B) Crosby
C) Juran
D) Hill
A) Deming
B) Crosby
C) Juran
D) Hill
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
26
Deming developed how many Points for Management?
A) 6
B) 10
C) 12
D) 14
A) 6
B) 10
C) 12
D) 14
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
27
The ISO standard associated with quality management is?
A) ISO 9000
B) ISO 10000
C) ISO 12000
D) ISO 14000
A) ISO 9000
B) ISO 10000
C) ISO 12000
D) ISO 14000
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
28
The original developer of statistical process control chart techniques was?
A) Lee
B) Deming
C) Shewhart
D) Packard
A) Lee
B) Deming
C) Shewhart
D) Packard
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
29
All of the following are among Deming's 14 Points for Management except?
A) Increase dependence on mass inspection
B) Adopt and institute leadership
C) Eliminate numerical quotas for workers and managers
D) End the practice of awarding business on the basis of price tag alone
A) Increase dependence on mass inspection
B) Adopt and institute leadership
C) Eliminate numerical quotas for workers and managers
D) End the practice of awarding business on the basis of price tag alone
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
30
All of the following are among Deming's 14 Points for Management except?
A) Adopt the new philosophy
B) Institute training
C) Use fear when appropriate
D) Take action to accomplish the transformation
A) Adopt the new philosophy
B) Institute training
C) Use fear when appropriate
D) Take action to accomplish the transformation
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
31
Management having the courage to break with tradition is associated with which of Deming's 14 Points for Management?
A) Drive out fear
B) Eliminate quotas for workers and managers
C) Break down barriers between departments
D) Take action to accomplish the transformation
A) Drive out fear
B) Eliminate quotas for workers and managers
C) Break down barriers between departments
D) Take action to accomplish the transformation
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
32
Approximately what percentage of U.S. hospitals use Lean Six Sigma approaches?
A) 5
B) 10
C) 15
D) 20
A) 5
B) 10
C) 15
D) 20
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
33
Which of Crosby's Absolutes of Quality refers to the idea of adopting a do-it-right attitude the first time?
A) The definition of quality is conformance to requirements
B) The performance standard is zero defects
C) The system of quality is prevention
D) The measure of quality is the price of nonconformance
A) The definition of quality is conformance to requirements
B) The performance standard is zero defects
C) The system of quality is prevention
D) The measure of quality is the price of nonconformance
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
34
The book Quality Is Free was authored by which quality expert?
A) Deming
B) Crosby
C) Juran
D) Ishikawa
A) Deming
B) Crosby
C) Juran
D) Ishikawa
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
35
Crosby's Absolutes of Quality include all of the following except?
A) The definition of quality is conformance to requirements
B) The idea of quality is waste reduction
C) The system of quality is prevention
D) The measure of quality is the price of nonconformance
A) The definition of quality is conformance to requirements
B) The idea of quality is waste reduction
C) The system of quality is prevention
D) The measure of quality is the price of nonconformance
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
36
Which of Crosby's Absolutes of Quality refers to the idea of using SPC techniques to prevent quality problems?
A) The definition of quality is conformance to requirements
B) The performance standard is zero defects
C) The system of quality is prevention
D) The measure of quality is the price of nonconformance
A) The definition of quality is conformance to requirements
B) The performance standard is zero defects
C) The system of quality is prevention
D) The measure of quality is the price of nonconformance
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
37
Deming developed which of the following?
A) Theory of Management
B) Theory of Production
C) Theory of Constraints
D) Theory of Manufacturing
A) Theory of Management
B) Theory of Production
C) Theory of Constraints
D) Theory of Manufacturing
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
38
Which of Crosby's Absolutes of Quality refers to the idea of defect elimination?
A) The definition of quality is conformance to requirements
B) The performance standard is zero defects
C) The system of quality is prevention
D) The measure of quality is the price of nonconformance
A) The definition of quality is conformance to requirements
B) The performance standard is zero defects
C) The system of quality is prevention
D) The measure of quality is the price of nonconformance
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
39
Crosby developed how many Absolutes of Quality?
A) 1
B) 2
C) 3
D) 4
A) 1
B) 2
C) 3
D) 4
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
40
Six Sigma is focused on?
A) Increasing waste
B) Reducing quality
C) Improving quality
D) Reducing waste
A) Increasing waste
B) Reducing quality
C) Improving quality
D) Reducing waste
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
41
The process of meeting quality goals during operations refers to which of Juran's Quality Trilogy?
A) Quality planning
B) Quality control
C) Quality improvement
D) This does not relate to any of Juran's Quality Trilogy
A) Quality planning
B) Quality control
C) Quality improvement
D) This does not relate to any of Juran's Quality Trilogy
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
42
Which ISO standard applies to environmental management?
A) 8000
B) 9000
C) 14000
D) 16000
A) 8000
B) 9000
C) 14000
D) 16000
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
43
A prestigious award for quality management in the United States is the?
A) Baldrige Quality Award
B) Lam Quality Award
C) Palmer Quality Award
D) Deming Quality Award
A) Baldrige Quality Award
B) Lam Quality Award
C) Palmer Quality Award
D) Deming Quality Award
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
44
Juran focused on which element of poor quality with workers?
A) Statistical quality control
B) Cost
C) Training
D) Inspection
A) Statistical quality control
B) Cost
C) Training
D) Inspection
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
45
Which ISO standard applies to quality management?
A) 8000
B) 9000
C) 14000
D) 16000
A) 8000
B) 9000
C) 14000
D) 16000
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
46
Which of the following is not an area in which applicants for the Baldrige Award are predominantly evaluated?
A) Leadership
B) Customer focus
C) Innovation
D) Analysis
A) Leadership
B) Customer focus
C) Innovation
D) Analysis
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
47
Juran summarized his quality recommendations in how many main points?
A) 1
B) 2
C) 3
D) 4
A) 1
B) 2
C) 3
D) 4
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
48
Juran focused on which element of poor quality with managers?
A) Statistical quality control
B) Cost
C) Training
D) Inspection
A) Statistical quality control
B) Cost
C) Training
D) Inspection
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
49
How many Baldrige Award categories are there?
A) 1
B) 2
C) 3
D) 6
A) 1
B) 2
C) 3
D) 6
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
50
Which of the following organizations has won the Baldrige Award twice?
A) IBM
B) Motorola
C) Dell
D) Ritz-Carlton
A) IBM
B) Motorola
C) Dell
D) Ritz-Carlton
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
51
Juran was notable (in comparison to Crosby and Deming) for which of the following?
A) Considering the human element
B) Considering the cost of quality
C) Considering the importance of inspection
D) Considering the need to reduce inventory levels
A) Considering the human element
B) Considering the cost of quality
C) Considering the importance of inspection
D) Considering the need to reduce inventory levels
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
52
The Baldrige Award is managed by which organization?
A) ISO
B) ASQ
C) NIST
D) AACSB
A) ISO
B) ASQ
C) NIST
D) AACSB
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
53
Joseph Juran authored which of the following books?
A) Quality Control Handbook
B) Quality Is Free
C) The Goal
D) Crush
A) Quality Control Handbook
B) Quality Is Free
C) The Goal
D) Crush
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
54
The process of achieving greater levels of quality performance refers to which of Juran's Quality Trilogy?
A) Quality planning
B) Quality control
C) Quality improvement
D) This does not relate to any of Juran's Quality Trilogy
A) Quality planning
B) Quality control
C) Quality improvement
D) This does not relate to any of Juran's Quality Trilogy
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
55
How many Baldrige Awards can be given annually in each of the award categories?
A) 1
B) 2
C) 3
D) 6
A) 1
B) 2
C) 3
D) 6
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
56
Which quality management expert was responsible for authoring the Quality Control Handbook?
A) Shewhart
B) Crosby
C) Deming
D) Juran
A) Shewhart
B) Crosby
C) Deming
D) Juran
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
57
Which of the following is not one of Juran's Quality Trilogy?
A) Quality planning
B) Quality control
C) Quality improvement
D) Quality monitoring
A) Quality planning
B) Quality control
C) Quality improvement
D) Quality monitoring
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
58
The organization that was created to facilitate the international coordination and unification of industrial standards is?
A) NIST
B) ISO
C) ISM
D) MSF
A) NIST
B) ISO
C) ISM
D) MSF
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
59
The process of preparing to meet quality goals refers to which of Juran's Quality Trilogy?
A) Quality planning
B) Quality control
C) Quality improvement
D) This does not relate to any of Juran's Quality Trilogy
A) Quality planning
B) Quality control
C) Quality improvement
D) This does not relate to any of Juran's Quality Trilogy
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
60
Which of Crosby's Absolutes of Quality refers to the cost of poor quality?
A) The definition of quality is conformance to requirements
B) The performance standard is zero defects
C) The system of quality is prevention
D) The measure of quality is the price of nonconformance
A) The definition of quality is conformance to requirements
B) The performance standard is zero defects
C) The system of quality is prevention
D) The measure of quality is the price of nonconformance
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
61
Designing and implementing a plan to remove the causes of poor performance is most closely associated with which element of the DMAIC improvement cycle?
A) Define
B) Control
C) Analyze
D) Improve
A) Define
B) Control
C) Analyze
D) Improve
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
62
A tool used to determine the frequencies of specific problems is referred to as a?
A) Flow chart
B) Histogram
C) Check sheet
D) Gantt chart
A) Flow chart
B) Histogram
C) Check sheet
D) Gantt chart
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
63
Cause-and-effect diagrams are alternatively referred to as?
A) Crosby diagrams
B) Deming diagrams
C) Ishikawa diagrams
D) Juran diagrams
A) Crosby diagrams
B) Deming diagrams
C) Ishikawa diagrams
D) Juran diagrams
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
64
A fishbone diagram is another name for a?
A) Cause-and-effect diagram
B) Boxplot diagram
C) Check sheet diagram
D) Roundtable diagram
A) Cause-and-effect diagram
B) Boxplot diagram
C) Check sheet diagram
D) Roundtable diagram
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
65
Which tool is used to show the magnitude of problems?
A) Flow chart
B) Pareto chart
C) Gantt chart
D) Check sheet
A) Flow chart
B) Pareto chart
C) Gantt chart
D) Check sheet
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
66
Using tools such as Pareto charts and fishbone diagrams is most closely associated with which element of the DMAIC improvement cycle?
A) Define
B) Measure
C) Analyze
D) Improve
A) Define
B) Measure
C) Analyze
D) Improve
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
67
In a process map, which of the following is true?
A) Rectangles represent process actions
B) Ovals represent wait periods
C) Rectangles represent process actions and ovals represent wait periods
D) Neither rectangles represent process actions nor ovals represent wait periods
A) Rectangles represent process actions
B) Ovals represent wait periods
C) Rectangles represent process actions and ovals represent wait periods
D) Neither rectangles represent process actions nor ovals represent wait periods
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
68
Which of the following is not a typical Six Sigma training level?
A) Master Black Belt
B) Yellow Belt
C) Black Belt
D) Orange Belt
A) Master Black Belt
B) Yellow Belt
C) Black Belt
D) Orange Belt
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
69
The Six Sigma training level in which a practitioner has a thorough knowledge of Six Sigma philosophies and principles is?
A) Master Black Belt
B) Yellow Belt
C) Black Belt
D) Green Belt
A) Master Black Belt
B) Yellow Belt
C) Black Belt
D) Green Belt
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
70
Identifying customers and their requirements is most closely associated with which element of the DMAIC improvement cycle?
A) Define
B) Measure
C) Analyze
D) Improve
A) Define
B) Measure
C) Analyze
D) Improve
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
71
The textbook refers to how many Six Sigma training levels?
A) 1
B) 2
C) 4
D) 6
A) 1
B) 2
C) 4
D) 6
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
72
The key improvement cycle associated with Six Sigma is?
A) DMAIC
B) ANSI
C) PDAC
D) SLL
A) DMAIC
B) ANSI
C) PDAC
D) SLL
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
73
The Six Sigma training level associated with a basic understanding of Six Sigma methodology is?
A) Master Black Belt
B) Yellow Belt
C) Black Belt
D) Green Belt
A) Master Black Belt
B) Yellow Belt
C) Black Belt
D) Green Belt
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
74
Determining how performance will be gauged for a process is most closely associated with which element of the DMAIC improvement cycle?
A) Define
B) Measure
C) Analyze
D) Improve
A) Define
B) Measure
C) Analyze
D) Improve
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
75
Process maps are sometimes alternatively referred to as?
A) Link charts
B) Process diagrams
C) Pareto charts
D) Histograms
A) Link charts
B) Process diagrams
C) Pareto charts
D) Histograms
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
76
The Six Sigma training level in which a practitioner has proven mastery is?
A) Master Black Belt
B) Yellow Belt
C) Black Belt
D) Green Belt
A) Master Black Belt
B) Yellow Belt
C) Black Belt
D) Green Belt
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
77
Continuing to monitor a process to ensure that performance levels are maintained is most closely associated with which element of the DMAIC improvement cycle?
A) Define
B) Control
C) Analyze
D) Improve
A) Define
B) Control
C) Analyze
D) Improve
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
78
The Six Sigma training level via which a trained team member can work on small, carefully defined projects is?
A) Master Black Belt
B) Yellow Belt
C) Black Belt
D) Green Belt
A) Master Black Belt
B) Yellow Belt
C) Black Belt
D) Green Belt
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
79
The Pareto Principle is often alternatively referred to as the?
A) 50/50 Rule
B) 60/40 Rule
C) 70/30 Rule
D) 80/20 Rule
A) 50/50 Rule
B) 60/40 Rule
C) 70/30 Rule
D) 80/20 Rule
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
80
Which of the following is not an element of DMAIC?
A) Define
B) Measure
C) Invest
D) Analyze
A) Define
B) Measure
C) Invest
D) Analyze
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck