Deck 9: Lean Systems

Full screen (f)
exit full mode
Question
In lean, waste reduction should lead to?

A) Cost reduction
B) Value reduction
C) Value enhancement
D) Cost increases
Use Space or
up arrow
down arrow
to flip the card.
Question
Toyota's quality control initiative was referred to initially as?

A) TQC
B) TQM
C) TQD
D) TQP
Question
All of the following are common pseudonyms for lean thinking except?

A) Lean systems
B) Lean manufacturing
C) Lean marketing
D) Lean production
Question
A common approach to waste reduction is?

A) Five-S
B) Five-P
C) Five-T
D) Five-Q
Question
Storage of too much raw material, WIP, and/or finished goods is which of the seven wastes?

A) Waiting
B) Transportation
C) Excess inventory
D) Excess movement
Question
Forming and refining effective work habits would be associated with which of the Five-S's?

A) Sort
B) Sweep
C) Self-discipline
D) Standardize
Question
Which of the following is not typically viewed as one of the Five-S's?

A) Sort
B) Sell
C) Set in order
D) Standardize
Question
All of the following are examples of the seven wastes except?

A) Overproducing
B) Excess quality
C) Waiting
D) Excess inventory
Question
Proper workplace cleaning and maintenance would be associated with which of the Five-S's?

A) Sort
B) Sweep
C) Self-discipline
D) Standardize
Question
Shigeo Shingo developed what concept that refers to error or mistake-proofing?

A) Kaizen
B) Kanban
C) Muda
D) Poka-yoke
Question
Waste refers to all of the following except?

A) Excess wait times
B) Excess revenues
C) Excess inventories
D) Excess material movements
Question
Much of the Toyota Production System was based on observation of which American car manufacturer?

A) General Motors
B) Chrysler
C) Ford
D) Chevrolet
Question
Excess inventories, scrap losses, rejects, and rework are examples of?

A) Waste
B) Buffers
C) Hedges
D) Stocks
Question
Excess idle machine or operator time is which of the seven wastes?

A) Waiting
B) Transportation
C) Excess inventory
D) Excess movement
Question
Toyota's quality control initiative was later renamed?

A) TQC
B) TQM
C) TQD
D) TQP
Question
The elimination of time spent searching for parts and tools would be associated with which of the Five-S's?

A) Sort
B) Sweep
C) Self-discipline
D) Standardize
Question
Reduction of processing variability would be associated with which of the Five-S's?

A) Sort
B) Sweep
C) Self-discipline
D) Standardize
Question
Lean thinking is best described as a(n)?

A) Way of life
B) Operating philosophy
C) Planning strategy
D) Supplier selection approach
Question
The most essential element in the use of lean systems is?

A) Inventory reduction
B) Variance magnification
C) Processing time reduction
D) Waste elimination
Question
In the Toyota Production System a material movement or production signal/card is referred to as a?

A) Poka-yoke
B) Kanban
C) Jidoka
D) Kaizen
Question
SMED was first developed and used at which car manufacturer?

A) Ford
B) Mercedes-Benz
C) Honda
D) Toyota
Question
Lean systems are also known as?

A) Push system
B) Shove system
C) Pull system
D) Yank system
Question
Which of the following is sometimes considered to be a sixth-S?

A) Scrap
B) Satisfaction
C) Self-awareness
D) Safety
Question
What is used to signal a need for items from an upstream manufacturing cell?

A) Jidoka
B) Andon
C) Kanban
D) Kaizen
Question
Consider a work center with a demand rate of 35 parts per hour and using a container that can hold 10 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 20 percent. What is the value of S for this system?

A) 35
B) 10
C) 1
D) 0.2
Question
Lean thinking with a firm's suppliers involves all of the following except?

A) Delivery of smaller quantities
B) More frequent deliveries
C) Earlier deliveries
D) Delivery to point of use
Question
A kanban that is used to authorize processing is referred to as?

A) Withdrawal kanban
B) Production kanban
C) Manufacturing kanban
D) Processing kanban
Question
All of the following are the steps for SMED (not necessarily in order) except?

A) Identify external setup tasks
B) Streamline internal and external elements
C) Convert internal setup activities to external setup activities
D) Eliminate external setup activities
Question
Consider a work center with a demand rate of 35 parts per hour and using a container that can hold 10 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 20 percent. What is the value of D (demand rate) for this system?

A) 35
B) 10
C) 1
D) 0.2
Question
Lean production tends to?

A) Rely on less frequent equipment setups than traditional layouts
B) Rely on more frequent equipment setups than traditional layouts
C) Rely on the same number of equipment setups than traditional layouts
D) Equipment setups are irrelevant in lean production
Question
Setups that are performed before a machine stops for changeover are referred to as?

A) Internal
B) External
C) Exterior
D) Interior
Question
Consider a work center with a demand rate of 35 parts per hour and using a container that can hold 10 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 20 percent. What is the value of C for this system?

A) 35
B) 10
C) 1
D) 0.2
Question
Lean layouts tend to?

A) Locate inventory more closely to the production floor than traditional layouts
B) Locate inventory further from the production floor than traditional layouts
C) Locate inventory in the same manner as a traditional layout
D) Inventory location is irrelevant in lean layouts
Question
Consider a work center with a demand rate of 35 parts per hour and using a container that can hold 10 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 20 percent. What is the value of T (time) for this system?

A) 35
B) 10
C) 1
D) 0.2
Question
The performance of quick equipment setups is often referred to as?

A) STED
B) SNED
C) SMED
D) SPED
Question
Consider a work center with a demand rate of 35 parts per hour and using a container that can hold 10 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 20 percent. What is the value of K for this system?

A) 3
B) 4
C) 5
D) 6
Question
A kanban that is used to authorize movement is referred to as?

A) Withdrawal kanban
B) Production kanban
C) Manufacturing kanban
D) Processing kanban
Question
Lean layouts tend to?

A) Use less visibility than traditional layouts
B) Use more visibility than traditional layouts
C) Use the same amount of visibility as traditional layouts
D) Visibility is irrelevant in lean layouts
Question
Consider a work center with a demand rate of 15 parts per hour and using a container that can hold 15 parts. It is estimated that the container takes 90 minutes to cycle through the work cell. Assume a safety stock level of 20 percent. What is the value of K for this system?

A) 1
B) 2
C) 3
D) 4
Question
Consider a work center with a demand rate of 35 parts per hour and using a container that can hold 10 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 20 percent. What is the maximum inventory level in this system?

A) 30
B) 40
C) 50
D) 60
Question
Consider a work center with a demand rate of 15 parts per hour and using a container that can hold 15 parts. It is estimated that the container takes 90 minutes to cycle through the work cell. Assume a safety stock level of 20 percent. What is the maximum inventory for this system?

A) 10
B) 20
C) 30
D) 40
Question
Keeping employees involved in the process of change is associated with which of the 6-E's of Lean?

A) Enlist
B) Enable
C) Engage
D) Encourage
Question
The following are part of the 6-E's of Lean except?

A) Enlist
B) Earnings
C) Excite
D) Encourage
Question
A significant roadblock to the implementation of lean practices in an organization can be the lack of a?

A) Lean momentum
B) Lean culture
C) Lean profitability
D) Lean cost-cutting
Question
Lean services focus on?

A) Customer needs
B) Shareholder returns
C) Profit
D) Supplier concerns
Question
Making transactions and other elements of processes known to users is referred to as?

A) Process awareness
B) Process control
C) Process visibility
D) Process monitoring
Question
After the 2011 earthquake and tsunami in Japan, Toyota experienced production level decreases of approximately?

A) 5%
B) 10%
C) 30%
D) Toyota did not experience production decreases
Question
Adopting lean practices can?

A) Result in reduced waste
B) Result in increased waste
C) Result in neither reduced nor increased waste
D) Lean practices are unrelated to waste
Question
Teaching employees to take actions to continually improve their processes is associated with which of the 6-E's of Lean?

A) Enlist
B) Enable
C) Engage
D) Encourage
Question
A Japanese term for continuous improvement is?

A) Andon
B) Jidoka
C) Kaizen
D) Blitz
Question
Workforces should be _________ to support lean production initiatives.

A) Forced
B) Coerced
C) Empowered
D) Not allowed
Question
Customer surveys should have all of the following characteristics except?

A) Long
B) Include open-ended questions
C) Designed to obtain truthful responses
D) Results should be shared with employees and customers
Question
A ________ group can be used to assess customer needs.

A) Target
B) Marketing
C) Family
D) Focus
Question
Encouraging employees to stay active in finding and correcting problems is associated with which of the 6-E's of Lean?

A) Empower
B) Excite
C) Engage
D) Encourage
Question
Inspiring employees to tap into their creative and innovative capabilities is associated with which of the 6-E's of Lean?

A) Empower
B) Excite
C) Engage
D) Encourage
Question
A focused (typically one-week) improvement effort is referred to as a kaizen ______.

A) Focus
B) Blitz
C) Crunch
D) Attack
Question
Hospital waste each year in the United States amounts to approximately?

A) 1 million pounds
B) 1.4 billion pounds
C) 2.4 billion pounds
D) 5 billion pounds
Question
To achieve a lean culture and to overcome bad habits, an organization should?

A) Practice
B) Procrastinate
C) Ignore the past
D) Resist change
Question
Seeking assistance and cooperation from all of the staff is associated with which of the 6-E's of Lean?

A) Enlist
B) Enable
C) Engage
D) Encourage
Question
Authorizing employees to make changes happen in the areas they control is associated with which of the 6-E's of Lean?

A) Empower
B) Excite
C) Engage
D) Encourage
Question
Consider a work center with a demand rate of 20 parts per hour and using a container that can hold 5 parts. It is estimated that the container takes 30 minutes to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of D for this system?

A) 5
B) 0.5
C) 0.1
D) 20
Question
Consider a work center with a demand rate of 50 parts per hour and using a container that can hold 12 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of S for this system?

A) 50
B) 12
C) 1
D) 0.1
Question
Technological changes have ________.

A) Made lean systems obsolete
B) Increased firms' movement away from lean
C) Slowed firms' movement away from lean
D) Provided new opportunities for lean systems
Question
If you calculate the number of containers needed in a Kanban system to be 3, how many containers should you use?

A) 3
B) 3.2
C) 4
D) Cannot be determined from the information given
Question
If you calculate the number of containers needed in a Kanban system to be 3.2, how many containers should you use?

A) 3
B) 3.2
C) 4
D) Cannot be determined from the information given
Question
The quality-based ISO certification is?

A) ISO 9000
B) ISO 10000
C) ISO 12000
D) ISO 14000
Question
Adding intelligence to lean is sometimes referred to as?

A) Smart push
B) Smart pull
C) Small push
D) Small pull
Question
Consider a work center with a demand rate of 50 parts per hour and using a container that can hold 12 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 10 percent. What is the maximum inventory level for this system?

A) 20
B) 40
C) 60
D) Cannot be determined from the information given
Question
Consider a work center with a demand rate of 50 parts per hour and using a container that can hold 12 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of K for this system?

A) 2
B) 4
C) 5
D) Cannot be determined from the information given
Question
Consider a work center with a demand rate of 20 parts per hour and using a container that can hold 5 parts. It is estimated that the container takes 30 minutes to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of T for this system?

A) 5
B) 0.5
C) 0.1
D) 20
Question
Consider a work center with a demand rate of 20 parts per hour and using a container that can hold 5 parts. It is estimated that the container takes 30 minutes to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of C for this system?

A) 5
B) 0.5
C) 0.1
D) 20
Question
Consider a work center with a demand rate of 50 parts per hour and using a container that can hold 12 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of D for this system?

A) 50
B) 12
C) 1
D) 0.1
Question
The textbook describes the use of lean systems in the field of?

A) Education
B) Construction engineering
C) Financial management
D) Architecture
Question
Consider a work center with a demand rate of 50 parts per hour and using a container that can hold 12 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of C for this system?

A) 50
B) 12
C) 1
D) 0.1
Question
Consider a work center with a demand rate of 50 parts per hour and using a container that can hold 12 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of T for this system?

A) 50
B) 12
C) 1
D) 0.1
Question
A bank with no physical location is referred to as a(n)?

A) Direct bank
B) Indirect bank
C) Virtual bank
D) Hidden bank
Question
RFID (in a lean systems environment) can be used to?

A) Alert customers to price changes
B) Detect material consumption and remotely trigger replenishments
C) Signal the end of a production run
D) RFID is not typically used in a lean systems environment
Question
The environmental-based ISO certification is?

A) ISO 9000
B) ISO 10000
C) ISO 12000
D) ISO 14000
Question
Consider a work center with a demand rate of 20 parts per hour and using a container that can hold 5 parts. It is estimated that the container takes 30 minutes to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of S for this system?

A) 5
B) 0.5
C) 0.1
D) 20
Question
Offsetting carbon emissions from operations is referred to as being?

A) Carbon-positive
B) Carbon-negative
C) Carbon-constrained
D) Carbon-neutral
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/128
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 9: Lean Systems
1
In lean, waste reduction should lead to?

A) Cost reduction
B) Value reduction
C) Value enhancement
D) Cost increases
C
2
Toyota's quality control initiative was referred to initially as?

A) TQC
B) TQM
C) TQD
D) TQP
A
3
All of the following are common pseudonyms for lean thinking except?

A) Lean systems
B) Lean manufacturing
C) Lean marketing
D) Lean production
C
4
A common approach to waste reduction is?

A) Five-S
B) Five-P
C) Five-T
D) Five-Q
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
5
Storage of too much raw material, WIP, and/or finished goods is which of the seven wastes?

A) Waiting
B) Transportation
C) Excess inventory
D) Excess movement
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
6
Forming and refining effective work habits would be associated with which of the Five-S's?

A) Sort
B) Sweep
C) Self-discipline
D) Standardize
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
7
Which of the following is not typically viewed as one of the Five-S's?

A) Sort
B) Sell
C) Set in order
D) Standardize
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
8
All of the following are examples of the seven wastes except?

A) Overproducing
B) Excess quality
C) Waiting
D) Excess inventory
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
9
Proper workplace cleaning and maintenance would be associated with which of the Five-S's?

A) Sort
B) Sweep
C) Self-discipline
D) Standardize
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
10
Shigeo Shingo developed what concept that refers to error or mistake-proofing?

A) Kaizen
B) Kanban
C) Muda
D) Poka-yoke
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
11
Waste refers to all of the following except?

A) Excess wait times
B) Excess revenues
C) Excess inventories
D) Excess material movements
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
12
Much of the Toyota Production System was based on observation of which American car manufacturer?

A) General Motors
B) Chrysler
C) Ford
D) Chevrolet
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
13
Excess inventories, scrap losses, rejects, and rework are examples of?

A) Waste
B) Buffers
C) Hedges
D) Stocks
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
14
Excess idle machine or operator time is which of the seven wastes?

A) Waiting
B) Transportation
C) Excess inventory
D) Excess movement
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
15
Toyota's quality control initiative was later renamed?

A) TQC
B) TQM
C) TQD
D) TQP
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
16
The elimination of time spent searching for parts and tools would be associated with which of the Five-S's?

A) Sort
B) Sweep
C) Self-discipline
D) Standardize
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
17
Reduction of processing variability would be associated with which of the Five-S's?

A) Sort
B) Sweep
C) Self-discipline
D) Standardize
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
18
Lean thinking is best described as a(n)?

A) Way of life
B) Operating philosophy
C) Planning strategy
D) Supplier selection approach
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
19
The most essential element in the use of lean systems is?

A) Inventory reduction
B) Variance magnification
C) Processing time reduction
D) Waste elimination
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
20
In the Toyota Production System a material movement or production signal/card is referred to as a?

A) Poka-yoke
B) Kanban
C) Jidoka
D) Kaizen
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
21
SMED was first developed and used at which car manufacturer?

A) Ford
B) Mercedes-Benz
C) Honda
D) Toyota
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
22
Lean systems are also known as?

A) Push system
B) Shove system
C) Pull system
D) Yank system
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
23
Which of the following is sometimes considered to be a sixth-S?

A) Scrap
B) Satisfaction
C) Self-awareness
D) Safety
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
24
What is used to signal a need for items from an upstream manufacturing cell?

A) Jidoka
B) Andon
C) Kanban
D) Kaizen
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
25
Consider a work center with a demand rate of 35 parts per hour and using a container that can hold 10 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 20 percent. What is the value of S for this system?

A) 35
B) 10
C) 1
D) 0.2
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
26
Lean thinking with a firm's suppliers involves all of the following except?

A) Delivery of smaller quantities
B) More frequent deliveries
C) Earlier deliveries
D) Delivery to point of use
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
27
A kanban that is used to authorize processing is referred to as?

A) Withdrawal kanban
B) Production kanban
C) Manufacturing kanban
D) Processing kanban
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
28
All of the following are the steps for SMED (not necessarily in order) except?

A) Identify external setup tasks
B) Streamline internal and external elements
C) Convert internal setup activities to external setup activities
D) Eliminate external setup activities
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
29
Consider a work center with a demand rate of 35 parts per hour and using a container that can hold 10 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 20 percent. What is the value of D (demand rate) for this system?

A) 35
B) 10
C) 1
D) 0.2
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
30
Lean production tends to?

A) Rely on less frequent equipment setups than traditional layouts
B) Rely on more frequent equipment setups than traditional layouts
C) Rely on the same number of equipment setups than traditional layouts
D) Equipment setups are irrelevant in lean production
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
31
Setups that are performed before a machine stops for changeover are referred to as?

A) Internal
B) External
C) Exterior
D) Interior
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
32
Consider a work center with a demand rate of 35 parts per hour and using a container that can hold 10 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 20 percent. What is the value of C for this system?

A) 35
B) 10
C) 1
D) 0.2
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
33
Lean layouts tend to?

A) Locate inventory more closely to the production floor than traditional layouts
B) Locate inventory further from the production floor than traditional layouts
C) Locate inventory in the same manner as a traditional layout
D) Inventory location is irrelevant in lean layouts
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
34
Consider a work center with a demand rate of 35 parts per hour and using a container that can hold 10 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 20 percent. What is the value of T (time) for this system?

A) 35
B) 10
C) 1
D) 0.2
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
35
The performance of quick equipment setups is often referred to as?

A) STED
B) SNED
C) SMED
D) SPED
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
36
Consider a work center with a demand rate of 35 parts per hour and using a container that can hold 10 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 20 percent. What is the value of K for this system?

A) 3
B) 4
C) 5
D) 6
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
37
A kanban that is used to authorize movement is referred to as?

A) Withdrawal kanban
B) Production kanban
C) Manufacturing kanban
D) Processing kanban
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
38
Lean layouts tend to?

A) Use less visibility than traditional layouts
B) Use more visibility than traditional layouts
C) Use the same amount of visibility as traditional layouts
D) Visibility is irrelevant in lean layouts
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
39
Consider a work center with a demand rate of 15 parts per hour and using a container that can hold 15 parts. It is estimated that the container takes 90 minutes to cycle through the work cell. Assume a safety stock level of 20 percent. What is the value of K for this system?

A) 1
B) 2
C) 3
D) 4
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
40
Consider a work center with a demand rate of 35 parts per hour and using a container that can hold 10 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 20 percent. What is the maximum inventory level in this system?

A) 30
B) 40
C) 50
D) 60
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
41
Consider a work center with a demand rate of 15 parts per hour and using a container that can hold 15 parts. It is estimated that the container takes 90 minutes to cycle through the work cell. Assume a safety stock level of 20 percent. What is the maximum inventory for this system?

A) 10
B) 20
C) 30
D) 40
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
42
Keeping employees involved in the process of change is associated with which of the 6-E's of Lean?

A) Enlist
B) Enable
C) Engage
D) Encourage
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
43
The following are part of the 6-E's of Lean except?

A) Enlist
B) Earnings
C) Excite
D) Encourage
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
44
A significant roadblock to the implementation of lean practices in an organization can be the lack of a?

A) Lean momentum
B) Lean culture
C) Lean profitability
D) Lean cost-cutting
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
45
Lean services focus on?

A) Customer needs
B) Shareholder returns
C) Profit
D) Supplier concerns
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
46
Making transactions and other elements of processes known to users is referred to as?

A) Process awareness
B) Process control
C) Process visibility
D) Process monitoring
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
47
After the 2011 earthquake and tsunami in Japan, Toyota experienced production level decreases of approximately?

A) 5%
B) 10%
C) 30%
D) Toyota did not experience production decreases
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
48
Adopting lean practices can?

A) Result in reduced waste
B) Result in increased waste
C) Result in neither reduced nor increased waste
D) Lean practices are unrelated to waste
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
49
Teaching employees to take actions to continually improve their processes is associated with which of the 6-E's of Lean?

A) Enlist
B) Enable
C) Engage
D) Encourage
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
50
A Japanese term for continuous improvement is?

A) Andon
B) Jidoka
C) Kaizen
D) Blitz
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
51
Workforces should be _________ to support lean production initiatives.

A) Forced
B) Coerced
C) Empowered
D) Not allowed
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
52
Customer surveys should have all of the following characteristics except?

A) Long
B) Include open-ended questions
C) Designed to obtain truthful responses
D) Results should be shared with employees and customers
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
53
A ________ group can be used to assess customer needs.

A) Target
B) Marketing
C) Family
D) Focus
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
54
Encouraging employees to stay active in finding and correcting problems is associated with which of the 6-E's of Lean?

A) Empower
B) Excite
C) Engage
D) Encourage
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
55
Inspiring employees to tap into their creative and innovative capabilities is associated with which of the 6-E's of Lean?

A) Empower
B) Excite
C) Engage
D) Encourage
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
56
A focused (typically one-week) improvement effort is referred to as a kaizen ______.

A) Focus
B) Blitz
C) Crunch
D) Attack
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
57
Hospital waste each year in the United States amounts to approximately?

A) 1 million pounds
B) 1.4 billion pounds
C) 2.4 billion pounds
D) 5 billion pounds
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
58
To achieve a lean culture and to overcome bad habits, an organization should?

A) Practice
B) Procrastinate
C) Ignore the past
D) Resist change
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
59
Seeking assistance and cooperation from all of the staff is associated with which of the 6-E's of Lean?

A) Enlist
B) Enable
C) Engage
D) Encourage
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
60
Authorizing employees to make changes happen in the areas they control is associated with which of the 6-E's of Lean?

A) Empower
B) Excite
C) Engage
D) Encourage
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
61
Consider a work center with a demand rate of 20 parts per hour and using a container that can hold 5 parts. It is estimated that the container takes 30 minutes to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of D for this system?

A) 5
B) 0.5
C) 0.1
D) 20
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
62
Consider a work center with a demand rate of 50 parts per hour and using a container that can hold 12 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of S for this system?

A) 50
B) 12
C) 1
D) 0.1
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
63
Technological changes have ________.

A) Made lean systems obsolete
B) Increased firms' movement away from lean
C) Slowed firms' movement away from lean
D) Provided new opportunities for lean systems
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
64
If you calculate the number of containers needed in a Kanban system to be 3, how many containers should you use?

A) 3
B) 3.2
C) 4
D) Cannot be determined from the information given
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
65
If you calculate the number of containers needed in a Kanban system to be 3.2, how many containers should you use?

A) 3
B) 3.2
C) 4
D) Cannot be determined from the information given
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
66
The quality-based ISO certification is?

A) ISO 9000
B) ISO 10000
C) ISO 12000
D) ISO 14000
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
67
Adding intelligence to lean is sometimes referred to as?

A) Smart push
B) Smart pull
C) Small push
D) Small pull
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
68
Consider a work center with a demand rate of 50 parts per hour and using a container that can hold 12 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 10 percent. What is the maximum inventory level for this system?

A) 20
B) 40
C) 60
D) Cannot be determined from the information given
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
69
Consider a work center with a demand rate of 50 parts per hour and using a container that can hold 12 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of K for this system?

A) 2
B) 4
C) 5
D) Cannot be determined from the information given
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
70
Consider a work center with a demand rate of 20 parts per hour and using a container that can hold 5 parts. It is estimated that the container takes 30 minutes to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of T for this system?

A) 5
B) 0.5
C) 0.1
D) 20
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
71
Consider a work center with a demand rate of 20 parts per hour and using a container that can hold 5 parts. It is estimated that the container takes 30 minutes to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of C for this system?

A) 5
B) 0.5
C) 0.1
D) 20
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
72
Consider a work center with a demand rate of 50 parts per hour and using a container that can hold 12 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of D for this system?

A) 50
B) 12
C) 1
D) 0.1
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
73
The textbook describes the use of lean systems in the field of?

A) Education
B) Construction engineering
C) Financial management
D) Architecture
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
74
Consider a work center with a demand rate of 50 parts per hour and using a container that can hold 12 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of C for this system?

A) 50
B) 12
C) 1
D) 0.1
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
75
Consider a work center with a demand rate of 50 parts per hour and using a container that can hold 12 parts. It is estimated that the container takes 1 hour to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of T for this system?

A) 50
B) 12
C) 1
D) 0.1
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
76
A bank with no physical location is referred to as a(n)?

A) Direct bank
B) Indirect bank
C) Virtual bank
D) Hidden bank
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
77
RFID (in a lean systems environment) can be used to?

A) Alert customers to price changes
B) Detect material consumption and remotely trigger replenishments
C) Signal the end of a production run
D) RFID is not typically used in a lean systems environment
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
78
The environmental-based ISO certification is?

A) ISO 9000
B) ISO 10000
C) ISO 12000
D) ISO 14000
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
79
Consider a work center with a demand rate of 20 parts per hour and using a container that can hold 5 parts. It is estimated that the container takes 30 minutes to cycle through the work cell. Assume a safety stock level of 10 percent. What is the value of S for this system?

A) 5
B) 0.5
C) 0.1
D) 20
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
80
Offsetting carbon emissions from operations is referred to as being?

A) Carbon-positive
B) Carbon-negative
C) Carbon-constrained
D) Carbon-neutral
Unlock Deck
Unlock for access to all 128 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 128 flashcards in this deck.