Deck 8: Supplement: Job Scheduling and Vehicle Routing

Full screen (f)
exit full mode
Question
In a flow management context, customer orders are referred to as?

A) Actions
B) Jobs
C) Tasks
D) Projects
Use Space or
up arrow
down arrow
to flip the card.
Question
Short production runs have what effect on the amount of average WIP held?

A) Increased amount of WIP
B) Decreased amount of WIP
C) No change to amount of WIP
D) It is impossible to determine the effect of short production runs on the amount of WIP
Question
If I is the input rate and O is the output rate, what happens when I < O?

A) WIP decreases
B) WIP increases
C) WIP remains constant
D) I and O are not related to the WIP
Question
If I is the input rate and O is the output rate, what happens when I > O?

A) WIP decreases
B) WIP increases
C) WIP remains constant
D) I and O are not related to the WIP
Question
Having high quality schedules for delivery vehicles can lead to?

A) Lower in-transit inventories
B) More on-time deliveries
C) Both lower in-transit inventories and more on-time deliveries
D) Neither lower in-transit inventories nor more on-time deliveries
Question
The primary scheduling objective(s) in a product-focused system is(are)?

A) Smooth flow of goods
B) High equipment/labor utilization
C) Both smooth flow of goods and high equipment/labor utilization
D) Neither smooth flow of goods nor high equipment/labor utilization
Question
Input and output control refers to?

A) Quality assurance of materials and completed goods
B) Management of input and output production flow rates
C) Proper training of employees for customer service
D) Handling of customer service calls at a call center
Question
If WIP levels are reasonable and product flow is steady, then the input rate for a job shop should be?

A) Equal to the daily output rate
B) Less than the daily output rate
C) More than the daily output rate
D) WIP and input rate are unrelated
Question
The primary scheduling issue in a product-focused facility is?

A) Fixed model sequencing
B) Constant model sequencing
C) Production model sequencing
D) Mixed model sequencing
Question
The orders of some important customers may be?

A) Given processing priority
B) Intentionally delayed
C) Refused
D) Placed at the end of the order queue
Question
The ability to produce a wide variety of product types is referred to as?

A) Production mapping
B) Production prowess
C) Production flexibility
D) Production differentiation
Question
Short production runs have what effect on the number of machine setups?

A) Increased number of setups
B) Decreased number of setups
C) No change to number of setups
D) It is impossible to determine the effect of short production runs on the number of setups
Question
Effectively scheduling jobs can result in all of the following except?

A) Reduced inventory carrying costs
B) Decreased queuing delays
C) Increased employee productivity
D) Decreased customer satisfaction
Question
If a job shop is underutilized, then the input rate for a job shop should be?

A) Equal to the daily output rate
B) Less than the daily output rate
C) More than the daily output rate
D) WIP and input rate are unrelated
Question
Completing more jobs per period can be achieved by?

A) Working on longer jobs first
B) Working on shorter jobs first
C) Working on random jobs first
D) Working on jobs does not influence job completion rate
Question
Short production runs have what effect on flexibility?

A) Decreased flexibility
B) Increased flexibility
C) No change to flexibility
D) It is impossible to determine the effect of short production runs on flexibility
Question
Accepting more work per period than can be completed per day results in all of the following except?

A) Increased WIP inventory
B) Increased shop congestion
C) Increased firm output rate
D) Increased job completion times
Question
All of the following may lead to delays except?

A) Machine breakdowns
B) Poor material quality
C) Processing errors
D) Routine maintenance
Question
Planning production that takes into account the demand for several product models is referred to as?

A) Mixed-component assembly line sequencing
B) Mixed-model assembly line sequencing
C) Mixed-inventory assembly line sequencing
D) Mixed-product assembly line sequencing
Question
If a job shop is heavily congested, then the input rate for a job shop should be?

A) Equal to the daily output rate
B) Less than the daily output rate
C) More than the daily output rate
D) WIP and input rate are unrelated
Question
The average of flow time minus processing time is?

A) Makespan
B) Average flow time
C) Average job tardiness
D) Average queue time
Question
If I is the input rate and O is the output rate, what happens when I = O?

A) WIP decreases
B) WIP increases
C) WIP remains constant
D) I and O are not related to the WIP
Question
Which job shop dispatch rule schedules the job with the earliest due date first?

A) CR
B) SPT
C) EDD
D) FCFS
Question
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the lateness of J2?

A) 0
B) 1
C) 2
D) 4
Question
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. What is the average flow time of these jobs?

A) 0
B) 7
C) 14
D) Cannot be determined from the information given
Question
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the lateness of J1?

A) 0
B) 1
C) 2
D) 4
Question
A simple, one-vehicle routing problem with the vehicle starting and ending its route at the same node is referred to as?

A) Vehicle routing
B) Traveling salesman problem
C) Mixed-mode routing problem
D) Pickup and delivery problem
Question
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. What is the makespan of these jobs?

A) 0
B) 5
C) 9
D) Cannot be determined from the information given
Question
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the tardiness of J2?

A) 0
B) 1
C) 2
D) 4
Question
What type of chart is often used for forward scheduling?

A) Gary
B) Gravity
C) Garage
D) Gantt
Question
Which job shop dispatch rule tends to work well to minimize average flow time?

A) CR
B) SPT
C) EDD
D) FCFS
Question
Two jobs (J1 and J2) are to be scheduled on a single workcenter. J1 has a process time of 5 and J2 has a process time of 3. J1 has a due date of time 6 and J2 has a due date of time 7. If the jobs are scheduled by the EDD rule, in what order will they be processed?

A) J2 then J1
B) J1 then J2
C) Random order
D) The EDD rule is not related to processing order
Question
Scheduling jobs into the future based upon job arrival date refers to?

A) Backward scheduling
B) Forward scheduling
C) Inverse scheduling
D) Advance scheduling
Question
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. What is the average queue time of these jobs?

A) 0
B) 1
C) 2
D) Cannot be determined from the information given
Question
What type of rules determine which job to process next from a queue of waiting jobs?

A) Delivery
B) Distance
C) Dispatch
D) Distribution
Question
Two jobs (J1 and J2) are to be scheduled on a single workcenter. J1 has a process time of 5 and J2 has a process time of 3. J1 has a due date of time 6 and J2 has a due date of time 7. If the jobs are scheduled by the SPT rule, in what order will they be processed?

A) J2 then J1
B) J1 then J2
C) Random order
D) The SPT rule is not related to processing order
Question
Which job shop dispatch rule schedules the job with the shortest process time first?

A) CR
B) SPT
C) EDD
D) FCFS
Question
The average amount of time a job finishes past the due date is?

A) Makespan
B) Average flow time
C) Average job tardiness
D) Average queue time
Question
The total elapsed time to complete a group of jobs is?

A) Makespan
B) Average flow time
C) Average job tardiness
D) Average queue time
Question
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the tardiness of J1?

A) 0
B) 1
C) 2
D) 4
Question
In a job shop, ________ are used to identify incoming materials and purchases that may be behind schedule.
Question
There are rarely scheduling issues in an assembly line.
Question
Describe why a firm utilizing assembly lines may wish to utilize shorter production runs. What disadvantages might such an approach pose?
Question
Vehicle routing problems typically involve only a single objective.
Question
It is often advantageous for a firm to be able to build multiple models on the same assembly line.
Question
Customer orders, in a flow management context, are often referred to as jobs.
Question
Describe the challenges faced when scheduling jobs in a product-focused production system.
Question
The FCFS job shop dispatch rule has been shown to work very well under controlled conditions.
Question
The _________ and _________ Savings Heuristic builds vehicle routes by considering savings achieved by combining two nodes onto a single tour.

A) Hill and Lam
B) Scott and Palmer
C) Dantzig and Deming
D) Clark and Wright
Question
Briefly describe the relative advantages and disadvantages of the various dispatching rules listed in the textbook. Why might a firm wish to choose one rule over another?
Question
Shorter production runs tend to decrease production flexibility.
Question
Short production runs typically result in _______ WIP inventories.
Question
Short production run tend to result in _________ machine setups.
Question
In a vehicle routing problem _________ represent origin/destination points and pickup and/or delivery points.
Question
Heuristic approaches to vehicle routing problems are guaranteed to find the best (optimal) routes.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/55
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 8: Supplement: Job Scheduling and Vehicle Routing
1
In a flow management context, customer orders are referred to as?

A) Actions
B) Jobs
C) Tasks
D) Projects
B
2
Short production runs have what effect on the amount of average WIP held?

A) Increased amount of WIP
B) Decreased amount of WIP
C) No change to amount of WIP
D) It is impossible to determine the effect of short production runs on the amount of WIP
B
3
If I is the input rate and O is the output rate, what happens when I < O?

A) WIP decreases
B) WIP increases
C) WIP remains constant
D) I and O are not related to the WIP
A
4
If I is the input rate and O is the output rate, what happens when I > O?

A) WIP decreases
B) WIP increases
C) WIP remains constant
D) I and O are not related to the WIP
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
5
Having high quality schedules for delivery vehicles can lead to?

A) Lower in-transit inventories
B) More on-time deliveries
C) Both lower in-transit inventories and more on-time deliveries
D) Neither lower in-transit inventories nor more on-time deliveries
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
6
The primary scheduling objective(s) in a product-focused system is(are)?

A) Smooth flow of goods
B) High equipment/labor utilization
C) Both smooth flow of goods and high equipment/labor utilization
D) Neither smooth flow of goods nor high equipment/labor utilization
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
7
Input and output control refers to?

A) Quality assurance of materials and completed goods
B) Management of input and output production flow rates
C) Proper training of employees for customer service
D) Handling of customer service calls at a call center
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
8
If WIP levels are reasonable and product flow is steady, then the input rate for a job shop should be?

A) Equal to the daily output rate
B) Less than the daily output rate
C) More than the daily output rate
D) WIP and input rate are unrelated
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
9
The primary scheduling issue in a product-focused facility is?

A) Fixed model sequencing
B) Constant model sequencing
C) Production model sequencing
D) Mixed model sequencing
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
10
The orders of some important customers may be?

A) Given processing priority
B) Intentionally delayed
C) Refused
D) Placed at the end of the order queue
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
11
The ability to produce a wide variety of product types is referred to as?

A) Production mapping
B) Production prowess
C) Production flexibility
D) Production differentiation
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
12
Short production runs have what effect on the number of machine setups?

A) Increased number of setups
B) Decreased number of setups
C) No change to number of setups
D) It is impossible to determine the effect of short production runs on the number of setups
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
13
Effectively scheduling jobs can result in all of the following except?

A) Reduced inventory carrying costs
B) Decreased queuing delays
C) Increased employee productivity
D) Decreased customer satisfaction
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
14
If a job shop is underutilized, then the input rate for a job shop should be?

A) Equal to the daily output rate
B) Less than the daily output rate
C) More than the daily output rate
D) WIP and input rate are unrelated
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
15
Completing more jobs per period can be achieved by?

A) Working on longer jobs first
B) Working on shorter jobs first
C) Working on random jobs first
D) Working on jobs does not influence job completion rate
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
16
Short production runs have what effect on flexibility?

A) Decreased flexibility
B) Increased flexibility
C) No change to flexibility
D) It is impossible to determine the effect of short production runs on flexibility
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
17
Accepting more work per period than can be completed per day results in all of the following except?

A) Increased WIP inventory
B) Increased shop congestion
C) Increased firm output rate
D) Increased job completion times
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
18
All of the following may lead to delays except?

A) Machine breakdowns
B) Poor material quality
C) Processing errors
D) Routine maintenance
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
19
Planning production that takes into account the demand for several product models is referred to as?

A) Mixed-component assembly line sequencing
B) Mixed-model assembly line sequencing
C) Mixed-inventory assembly line sequencing
D) Mixed-product assembly line sequencing
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
20
If a job shop is heavily congested, then the input rate for a job shop should be?

A) Equal to the daily output rate
B) Less than the daily output rate
C) More than the daily output rate
D) WIP and input rate are unrelated
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
21
The average of flow time minus processing time is?

A) Makespan
B) Average flow time
C) Average job tardiness
D) Average queue time
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
22
If I is the input rate and O is the output rate, what happens when I = O?

A) WIP decreases
B) WIP increases
C) WIP remains constant
D) I and O are not related to the WIP
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
23
Which job shop dispatch rule schedules the job with the earliest due date first?

A) CR
B) SPT
C) EDD
D) FCFS
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
24
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the lateness of J2?

A) 0
B) 1
C) 2
D) 4
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
25
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. What is the average flow time of these jobs?

A) 0
B) 7
C) 14
D) Cannot be determined from the information given
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
26
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the lateness of J1?

A) 0
B) 1
C) 2
D) 4
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
27
A simple, one-vehicle routing problem with the vehicle starting and ending its route at the same node is referred to as?

A) Vehicle routing
B) Traveling salesman problem
C) Mixed-mode routing problem
D) Pickup and delivery problem
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
28
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. What is the makespan of these jobs?

A) 0
B) 5
C) 9
D) Cannot be determined from the information given
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
29
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the tardiness of J2?

A) 0
B) 1
C) 2
D) 4
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
30
What type of chart is often used for forward scheduling?

A) Gary
B) Gravity
C) Garage
D) Gantt
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
31
Which job shop dispatch rule tends to work well to minimize average flow time?

A) CR
B) SPT
C) EDD
D) FCFS
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
32
Two jobs (J1 and J2) are to be scheduled on a single workcenter. J1 has a process time of 5 and J2 has a process time of 3. J1 has a due date of time 6 and J2 has a due date of time 7. If the jobs are scheduled by the EDD rule, in what order will they be processed?

A) J2 then J1
B) J1 then J2
C) Random order
D) The EDD rule is not related to processing order
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
33
Scheduling jobs into the future based upon job arrival date refers to?

A) Backward scheduling
B) Forward scheduling
C) Inverse scheduling
D) Advance scheduling
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
34
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. What is the average queue time of these jobs?

A) 0
B) 1
C) 2
D) Cannot be determined from the information given
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
35
What type of rules determine which job to process next from a queue of waiting jobs?

A) Delivery
B) Distance
C) Dispatch
D) Distribution
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
36
Two jobs (J1 and J2) are to be scheduled on a single workcenter. J1 has a process time of 5 and J2 has a process time of 3. J1 has a due date of time 6 and J2 has a due date of time 7. If the jobs are scheduled by the SPT rule, in what order will they be processed?

A) J2 then J1
B) J1 then J2
C) Random order
D) The SPT rule is not related to processing order
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
37
Which job shop dispatch rule schedules the job with the shortest process time first?

A) CR
B) SPT
C) EDD
D) FCFS
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
38
The average amount of time a job finishes past the due date is?

A) Makespan
B) Average flow time
C) Average job tardiness
D) Average queue time
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
39
The total elapsed time to complete a group of jobs is?

A) Makespan
B) Average flow time
C) Average job tardiness
D) Average queue time
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
40
Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the tardiness of J1?

A) 0
B) 1
C) 2
D) 4
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
41
In a job shop, ________ are used to identify incoming materials and purchases that may be behind schedule.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
42
There are rarely scheduling issues in an assembly line.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
43
Describe why a firm utilizing assembly lines may wish to utilize shorter production runs. What disadvantages might such an approach pose?
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
44
Vehicle routing problems typically involve only a single objective.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
45
It is often advantageous for a firm to be able to build multiple models on the same assembly line.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
46
Customer orders, in a flow management context, are often referred to as jobs.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
47
Describe the challenges faced when scheduling jobs in a product-focused production system.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
48
The FCFS job shop dispatch rule has been shown to work very well under controlled conditions.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
49
The _________ and _________ Savings Heuristic builds vehicle routes by considering savings achieved by combining two nodes onto a single tour.

A) Hill and Lam
B) Scott and Palmer
C) Dantzig and Deming
D) Clark and Wright
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
50
Briefly describe the relative advantages and disadvantages of the various dispatching rules listed in the textbook. Why might a firm wish to choose one rule over another?
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
51
Shorter production runs tend to decrease production flexibility.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
52
Short production runs typically result in _______ WIP inventories.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
53
Short production run tend to result in _________ machine setups.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
54
In a vehicle routing problem _________ represent origin/destination points and pickup and/or delivery points.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
55
Heuristic approaches to vehicle routing problems are guaranteed to find the best (optimal) routes.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 55 flashcards in this deck.