Exam 8: Supplement: Job Scheduling and Vehicle Routing

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Describe the challenges faced when scheduling jobs in a product-focused production system.

Free
(Essay)
4.9/5
(41)
Correct Answer:
Verified

A successful answer should indicate the challenges such as keeping goods flowing through the system smoothly and maintaining a high degree of labor utilization.

Scheduling jobs into the future based upon job arrival date refers to?

Free
(Multiple Choice)
4.9/5
(29)
Correct Answer:
Verified

B

If I is the input rate and O is the output rate, what happens when I < O?

Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
Verified

A

Shorter production runs tend to decrease production flexibility.

(True/False)
4.8/5
(37)

The primary scheduling issue in a product-focused facility is?

(Multiple Choice)
4.7/5
(40)

Short production run tend to result in _________ machine setups.

(Short Answer)
4.9/5
(34)

Short production runs have what effect on the amount of average WIP held?

(Multiple Choice)
4.9/5
(25)

Customer orders, in a flow management context, are often referred to as jobs.

(True/False)
4.7/5
(47)

Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. What is the average queue time of these jobs?

(Multiple Choice)
4.8/5
(39)

Having high quality schedules for delivery vehicles can lead to?

(Multiple Choice)
4.9/5
(31)

What type of rules determine which job to process next from a queue of waiting jobs?

(Multiple Choice)
4.9/5
(43)

Input and output control refers to?

(Multiple Choice)
4.7/5
(32)

The average of flow time minus processing time is?

(Multiple Choice)
4.9/5
(36)

Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. What is the average flow time of these jobs?

(Multiple Choice)
4.7/5
(36)

The ability to produce a wide variety of product types is referred to as?

(Multiple Choice)
4.9/5
(39)

Which job shop dispatch rule schedules the job with the shortest process time first?

(Multiple Choice)
4.8/5
(31)

Which job shop dispatch rule tends to work well to minimize average flow time?

(Multiple Choice)
4.7/5
(34)

Two jobs (J1 and J2) are to be scheduled on a single workcenter. J1 has a process time of 5 and J2 has a process time of 3. J1 has a due date of time 6 and J2 has a due date of time 7. If the jobs are scheduled by the EDD rule, in what order will they be processed?

(Multiple Choice)
4.9/5
(39)

The orders of some important customers may be?

(Multiple Choice)
4.8/5
(29)

What type of chart is often used for forward scheduling?

(Multiple Choice)
4.9/5
(36)