Deck 3: Project Management

Full screen (f)
exit full mode
Question
Which of the following projects was NOT completed by Bechtel?

A) Hoover Dam
B) Boston Central Artery/Tunnel
C) Trans-Arabian Pipeline
D) Channel Tunnel
E) Getty Center
Use Space or
up arrow
down arrow
to flip the card.
Question
A project organization:

A) is effective for companies with multiple large projects.
B) is appropriate only in construction firms.
C) often fails when the project cuts across organizational lines.
D) is most helpful for ongoing projects with no termination date.
E) is most helpful when the work contains simple and unrelated tasks.
Question
Project managers have their own code of ethics, established by the Project Management Institute.
Question
One responsibility of a project manager is to make sure that the project meets its quality goals.
Question
One phase of a large project is scheduling.
Question
Ethical issues that can arise in projects include gifts from contractors, pressure to mask delays with false status reports, false reports for charges of time and expenses, and pressure to compromise project quality to meet bonuses or avoid penalties related to schedules.
Question
A project organization that becomes permanent is often referred to as a:

A) fixed project organization.
B) matrix organization.
C) normal organization.
D) standard organization.
E) permanent project organization.
Question
The project organization works best when which of the following conditions are satisfied? I. Work tasks can be defined with a specific goal and deadline.
II) The job is typical and familiar to the existing organization.
III) The work contains interrelated tasks requiring specialized skills.
IV) The project is temporary but unimportant to long-term organizational success.
V) The project cuts across organizational lines.

A) I, II, III, IV, V
B) None of these conditions need to be satisfied.
C) I, III, V
D) I, II, III, V
E) I, III, IV, V
Question
What are the three phases of a project? Describe each in a sentence or two.
Question
Match the following steps in Microsoft's development of Windows 10 to their respective WBS level. Step Level
Develop Windows 10 Operating System ?
System Testing ?
Compatible with Windows 8 ?
Develop GUI's ?
Module Testing ?

A) Level 1, Level 2, Level 4, Level 3, Level 3
B) Level 1, Level 2, Level 3, Level 4, Level 5
C) Level 0, Level 1, Level 2, Level 3, Level 4
D) Level 0, Level 2, Level 2, Level 3, Level 3
E) Level 5, Level 3, Level 4, Level 1, Level 2
Question
A code of ethics especially for project managers:

A) has been established by the Project Management Institute.
B) has been formulated by the Federal government.
C) has been formulated by the World Trade Organization.
D) is inappropriate, since everyone should use the same guidance on ethical issues.
E) does not exist at this time.
Question
WBS stands for which of the following project management tools?

A) work break schedule
B) work breakdown status
C) work breakdown schedule
D) work breakdown structure
E) work break status
Question
Which of the following is NOT one of the phases of project management?

A) planning
B) scheduling
C) controlling
D) budgeting
E) All of these are project management phases.
Question
Which of the following statements about Bechtel is TRUE?

A) Even though Bechtel is over 100 years old, the Kuwaiti oil fields was its first "project."
B) Bechtel is the world's premier manager of massive construction and engineering projects.
C) Bechtel's competitive advantage is supply chain management.
D) While its projects are worldwide, its network of suppliers is largely in the United States
E) All of these are true.
Question
A project organization works best for an organization when the project resides in only one of its functional areas.
Question
Work breakdown structure is a useful tool in project management because it addresses the timing of individual work elements.
Question
A(n) ________ is an organization formed to ensure that programs (projects) receive the proper management and attention.
Question
The phases of project management are:

A) planning, scheduling, and controlling.
B) planning, programming, and budgeting.
C) planning, organizing, staffing, leading, and controlling.
D) different for manufacturing projects than for service projects.
E) GANTT, CPM, and PERT.
Question
Which of the following statements regarding Bechtel is NOT true?

A) Its competitive advantage is project management.
B) Bechtel was the construction contractor for the Hoover Dam.
C) By the end of 1970s, Bechtel had moved from nuclear power construction to nuclear cleanup projects.
D) Bechtel handled the project management of the 1984 Los Angeles Summer Olympics.
E) Even though Bechtel is over 100 years old, the Kuwaiti oil fields was its first "project."
Question
Ethical issues that may arise in projects large and small include:

A) gifts from contractors.
B) exaggerated expense reports.
C) compromised quality standards to meet bonuses or avoid penalties related to schedules.
D) pressure to mask delays with false status reports.
E) all of the these.
Question
Agile project management is a type of work breakdown structure (WBS).
Question
Describe agile projects.
Question
What are some of the ethical issues faced by project managers?
Question
Identify each of the purposes of project scheduling.
Question
The ________ has established a code of ethics especially for project managers.
Question
The waterfall approach is used most often for:

A) well-defined projects.
B) projects whose changes tend to be minor.
C) projects with step-by-step progress.
D) engineered products with well-defined specifications and drawings.
E) all of the these.
Question
Describe some of the challenges faced in the construction of the new 11-story building at Arnold Palmer Hospital in Orlando, Florida.
Question
The shortest of all paths through the network is the critical path.
Question
Project managers often use the waterfall approach when managing agile projects.
Question
PERT, but not CPM, has the ability to consider the precedence relationships in a project.
Question
A(n) ________ divides a project into more and more detailed components.
Question
Ill-defined projects are typified by software development and new technology.
Question
A combination of effective Gantt chart use and other tactics allowed Delta to cut the average time for a plane layover by what % of the original 60-minute duration?

A) 33%, to 40 minutes
B) 50%, to 30 minutes
C) 20%, to 48 minutes
D) 25%, to 45 minutes
E) 40%, to 36 minutes
Question
Which of the following statements regarding Gantt charts is TRUE?

A) Gantt charts give a timeline and precedence relationships for each activity of a project.
B) Gantt charts use the four standard spines of Methods, Materials, Manpower, and Machinery.
C) Gantt charts are visual devices that show the duration of activities in a project.
D) Gantt charts are expensive.
E) All of these are true.
Question
What is a project organization?
Question
Identify the responsibilities of project managers.
Question
Projects such as road building and plane building are:

A) ill-defined.
B) well-defined.
C) agile.
D) not defined.
E) none of these.
Question
Gantt charts give a timeline for each of a project's activities, but they do not adequately illustrate the interrelationships between the activities and the resources.
Question
The control of projects involves close monitoring of which of the following?

A) resources
B) costs
C) quality
D) budgets
E) all of the these
Question
Describe the differences between a Gantt chart and a PERT/CPM network.
Question
Which of the following statements regarding CPM networks is TRUE?

A) There can be multiple critical paths on the same project, all with different durations.
B) The early finish of an activity is the latest early start of all preceding activities.
C) The late start of an activity is its late finish plus its duration.
D) If a specific project has multiple critical paths, all of them will have the same duration.
E) None of these are true.
Question
Activity D on a CPM network has predecessors B and C, and has successor F. D has duration 6. B's earliest finish is 18, while C's is 20. F's late start is 26. Which of the following is definitely TRUE?

A) B is a critical activity.
B) C is completed before B.
C) D has no slack but is not critical.
D) D is critical, and has a slack of two days.
E) F is critical, and has zero slack.
Question
Which of the following statements regarding critical paths is TRUE?

A) The shortest of all paths through the network is the critical path.
B) Some activities on the critical path may have slack.
C) Every network has only one critical path.
D) On a specific project, there can be multiple critical paths, all with exactly the same duration.
E) The duration of the critical path is the average duration of all paths in the project network.
Question
The fundamental difference between PERT and CPM is that PERT uses the beta distribution for crashing projects while CPM uses cost estimates.
Question
Slack is the amount of time an activity can be delayed without delaying the entire project.
Question
The network analysis method that allows activity times to vary is ________.
Question
A simple CPM network has five activities, A, B, C, D, and E. A is an immediate predecessor of B and of C. B is an immediate predecessor of D and of E. C is an immediate predecessor of E. Which of the following statements is TRUE?

A) There are two paths in this network.
B) There are four paths in this network.
C) There are five paths in this network.
D) There are three paths in this network.
E) There are six paths in this network.
Question
Identify, in order, the six steps basic to both PERT and CPM.
Question
The difference between AON and AOA networks is that:

A) AOA networks sometimes require dummy activities.
B) nodes consume no resources or time in AOA networks.
C) both are acceptable in practice; however, Microsoft Project uses AON.
D) nodes designate activities in AON, while arrows designate activities in AOA.
E) All of the these are true.
Question
The ________ is the computed longest time path(s) through a network.
Question
Which of the following statements regarding CPM is TRUE?

A) The critical path is the shortest of all paths through the network.
B) The critical path is that set of activities that has positive slack.
C) Some networks have no critical path.
D) All activities on the critical path have their LS equal to the maximum EF of all immediate predecessors.
E) All activities on the critical path have their ES equal to their LF.
Question
Activity R on a CPM network has predecessors M and N, and has successor S. R has duration 5. N's late finish is 18, while M's is 20. S's late start is 22. Which of the following is definitely TRUE?

A) R is critical and has zero slack.
B) R has no slack but is not critical.
C) The set of times cannot all be possible.
D) N is a critical activity.
E) S is a critical activity.
Question
A simple CPM network has three activities, D, E, and F. D is an immediate predecessor of E and of F. E is an immediate predecessor of F. The activity durations are D=4, E=3, F=6.

A) The critical path is D-E-F, duration 12.
B) The critical path is D-F, duration 10.
C) Slack at D is 0 periods.
D) Slack at E is 3 periods.
E) Both A and C are true.
Question
The critical path can be determined by use of either the "forward pass" or the "backward pass."
Question
The ________ is a project management technique using only one time factor per activity that enables managers to schedule, monitor, and control large and complex projects.
Question
The main difference between PERT and CPM is that:

A) PERT is more accurate than CPM.
B) PERT assumes that activity durations are known.
C) PERT ignores activity costs.
D) CPM assumes activity durations can vary.
E) PERT employs three time estimates for each activity.
Question
Every network has at most one critical path.
Question
What is the basic difference between PERT and CPM?
Question
The ES of an activity that has only one predecessor is simply the EF of that predecessor.
Question
A simple CPM network has three activities, A, B, and C. A is an immediate predecessor of B and of C. B is an immediate predecessor of C. The activity durations are A=4, B=3, C=5.

A) The critical path is A-B-C, duration 9.
B) The critical path is A-B-C, duration 12.
C) The critical path is A-C, duration 10.5.
D) The critical path cannot be determined without knowing PERT expected activity times.
E) The network has no critical path.
Question
Explain why the critical path is the longest, not the shortest, path through a network.
Question
The critical path for the network activities shown below is ________ with duration ________. <strong>The critical path for the network activities shown below is ________ with duration ________.  </strong> A) A-B-D; 10 B) A-B-E; 11 C) C-E; 14 D) A-D-E; 13 E) A-B-C-D-E; 22 <div style=padding-top: 35px>

A) A-B-D; 10
B) A-B-E; 11
C) C-E; 14
D) A-D-E; 13
E) A-B-C-D-E; 22
Question
The network below represents a project being analyzed by the critical path method. Activity durations are indicated on the network.
The network below represents a project being analyzed by the critical path method. Activity durations are indicated on the network.   (a) Identify the activities on the critical path. (b) What is the duration of the critical path? (c) Calculate the amount of slack time at activity H. (d) If activity I were delayed by ten time units, what would be the impact on the project duration?<div style=padding-top: 35px> (a) Identify the activities on the critical path.
(b) What is the duration of the critical path?
(c) Calculate the amount of slack time at activity H.
(d) If activity I were delayed by ten time units, what would be the impact on the project duration?
Question
The network below represents a project being analyzed by the critical path method. Activity durations are A = 5, B = 2, C = 12, D = 3, E = 5, F = 1, G = 7, H = 2, I = 10, and J = 6.
The network below represents a project being analyzed by the critical path method. Activity durations are A = 5, B = 2, C = 12, D = 3, E = 5, F = 1, G = 7, H = 2, I = 10, and J = 6.   (a) What task must be on the critical path, regardless of activity durations? (b) What is the duration of path A-B-E-H-J? (c) What is the critical path of this network? (d) What is the length of the critical path? (e) What is slack time at activity H? (f) What is the Late Finish of activity H? (g) If activity C was delayed by six time units, what would happen to the project duration?<div style=padding-top: 35px> (a) What task must be on the critical path, regardless of activity durations?
(b) What is the duration of path A-B-E-H-J?
(c) What is the critical path of this network?
(d) What is the length of the critical path?
(e) What is slack time at activity H?
(f) What is the Late Finish of activity H?
(g) If activity C was delayed by six time units, what would happen to the project duration?
Question
Given the project within the table below, calculate the following:
(a) The critical path
(b) The minimum project duration
(c) The amount of slack for each activity
Given the project within the table below, calculate the following: (a) The critical path (b) The minimum project duration (c) The amount of slack for each activity  <div style=padding-top: 35px>
Question
What are the earliest activity start time and latest activity start time, and how are they computed?
Question
The following activities are part of a project to be scheduled using the critical path method.
The following activities are part of a project to be scheduled using the critical path method.   Calculate (a) The critical path. (b) The slack available at any non-critical points. (c) The minimum project duration.<div style=padding-top: 35px> Calculate
(a) The critical path.
(b) The slack available at any non-critical points.
(c) The minimum project duration.
Question
The critical path for the network activities shown below is ________ with duration ________. <strong>The critical path for the network activities shown below is ________ with duration ________.  </strong> A) A-C-E; 20 B) A-D-E; 18 C) B-E; 14 D) A-B-D-E; 26 E) none of the above <div style=padding-top: 35px>

A) A-C-E; 20
B) A-D-E; 18
C) B-E; 14
D) A-B-D-E; 26
E) none of the above
Question
The standard deviation of project duration is the average of the standard deviation of all activities on the critical path.
Question
Consider the network presented in the following table. Calculate
(a) All possible paths
(b) The critical path
(c) The slack available at any non-critical points
(d) The minimum project duration
Consider the network presented in the following table. Calculate (a) All possible paths (b) The critical path (c) The slack available at any non-critical points (d) The minimum project duration  <div style=padding-top: 35px>
Question
________ is the amount of time an individual activity in a network can be delayed without delaying the entire project.
Question
The critical path for the network activities shown below is ________ with duration ________. <strong>The critical path for the network activities shown below is ________ with duration ________.  </strong> A) A-D-E; 11 B) B-E; 7 C) B-D-E; 13 D) A-C-E; 6 E) B-C-E; 8 <div style=padding-top: 35px>

A) A-D-E; 11
B) B-E; 7
C) B-D-E; 13
D) A-C-E; 6
E) B-C-E; 8
Question
Define slack time.
Question
What is the objective of critical path analysis?
Question
Draw the AOA and AON networks for the following project and calculate the minimum project duration.
Draw the AOA and AON networks for the following project and calculate the minimum project duration.  <div style=padding-top: 35px>
Question
In PERT analysis, the identification of the critical path can be incorrect if a noncritical activity takes substantially more than its expected time.
Question
A network consists of the following list. Times are given in weeks.
A network consists of the following list. Times are given in weeks.   (a) Draw the network diagram. (b) Which activities form the critical path? (c) How much slack exists at activities A and F? (d) What is the duration of the critical path?<div style=padding-top: 35px> (a) Draw the network diagram.
(b) Which activities form the critical path?
(c) How much slack exists at activities A and F?
(d) What is the duration of the critical path?
Question
A network consists of the activities in the following list. Times are given in weeks.
A network consists of the activities in the following list. Times are given in weeks.   (a) Draw the network diagram. (b) Calculate the ES, EF, LS, LF, and Slack for each activity. (c) What is project completion time?<div style=padding-top: 35px> (a) Draw the network diagram.
(b) Calculate the ES, EF, LS, LF, and Slack for each activity.
(c) What is project completion time?
Question
Which of the following statements concerning CPM activities is false?

A) The early finish of an activity is the early start of that activity plus its duration.
B) The late finish is the earliest of the late start times of all successor activities.
C) The late start of an activity is its late finish less its duration.
D) The late finish of an activity is the earliest late start of all preceding activities.
E) The early start of an activity is the latest early finish of all preceding activities.
Question
The PERT pessimistic time estimate is an estimate of the minimum time an activity will require.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/131
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 3: Project Management
1
Which of the following projects was NOT completed by Bechtel?

A) Hoover Dam
B) Boston Central Artery/Tunnel
C) Trans-Arabian Pipeline
D) Channel Tunnel
E) Getty Center
E
2
A project organization:

A) is effective for companies with multiple large projects.
B) is appropriate only in construction firms.
C) often fails when the project cuts across organizational lines.
D) is most helpful for ongoing projects with no termination date.
E) is most helpful when the work contains simple and unrelated tasks.
A
3
Project managers have their own code of ethics, established by the Project Management Institute.
True
4
One responsibility of a project manager is to make sure that the project meets its quality goals.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
5
One phase of a large project is scheduling.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
6
Ethical issues that can arise in projects include gifts from contractors, pressure to mask delays with false status reports, false reports for charges of time and expenses, and pressure to compromise project quality to meet bonuses or avoid penalties related to schedules.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
7
A project organization that becomes permanent is often referred to as a:

A) fixed project organization.
B) matrix organization.
C) normal organization.
D) standard organization.
E) permanent project organization.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
8
The project organization works best when which of the following conditions are satisfied? I. Work tasks can be defined with a specific goal and deadline.
II) The job is typical and familiar to the existing organization.
III) The work contains interrelated tasks requiring specialized skills.
IV) The project is temporary but unimportant to long-term organizational success.
V) The project cuts across organizational lines.

A) I, II, III, IV, V
B) None of these conditions need to be satisfied.
C) I, III, V
D) I, II, III, V
E) I, III, IV, V
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
9
What are the three phases of a project? Describe each in a sentence or two.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
10
Match the following steps in Microsoft's development of Windows 10 to their respective WBS level. Step Level
Develop Windows 10 Operating System ?
System Testing ?
Compatible with Windows 8 ?
Develop GUI's ?
Module Testing ?

A) Level 1, Level 2, Level 4, Level 3, Level 3
B) Level 1, Level 2, Level 3, Level 4, Level 5
C) Level 0, Level 1, Level 2, Level 3, Level 4
D) Level 0, Level 2, Level 2, Level 3, Level 3
E) Level 5, Level 3, Level 4, Level 1, Level 2
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
11
A code of ethics especially for project managers:

A) has been established by the Project Management Institute.
B) has been formulated by the Federal government.
C) has been formulated by the World Trade Organization.
D) is inappropriate, since everyone should use the same guidance on ethical issues.
E) does not exist at this time.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
12
WBS stands for which of the following project management tools?

A) work break schedule
B) work breakdown status
C) work breakdown schedule
D) work breakdown structure
E) work break status
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
13
Which of the following is NOT one of the phases of project management?

A) planning
B) scheduling
C) controlling
D) budgeting
E) All of these are project management phases.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
14
Which of the following statements about Bechtel is TRUE?

A) Even though Bechtel is over 100 years old, the Kuwaiti oil fields was its first "project."
B) Bechtel is the world's premier manager of massive construction and engineering projects.
C) Bechtel's competitive advantage is supply chain management.
D) While its projects are worldwide, its network of suppliers is largely in the United States
E) All of these are true.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
15
A project organization works best for an organization when the project resides in only one of its functional areas.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
16
Work breakdown structure is a useful tool in project management because it addresses the timing of individual work elements.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
17
A(n) ________ is an organization formed to ensure that programs (projects) receive the proper management and attention.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
18
The phases of project management are:

A) planning, scheduling, and controlling.
B) planning, programming, and budgeting.
C) planning, organizing, staffing, leading, and controlling.
D) different for manufacturing projects than for service projects.
E) GANTT, CPM, and PERT.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
19
Which of the following statements regarding Bechtel is NOT true?

A) Its competitive advantage is project management.
B) Bechtel was the construction contractor for the Hoover Dam.
C) By the end of 1970s, Bechtel had moved from nuclear power construction to nuclear cleanup projects.
D) Bechtel handled the project management of the 1984 Los Angeles Summer Olympics.
E) Even though Bechtel is over 100 years old, the Kuwaiti oil fields was its first "project."
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
20
Ethical issues that may arise in projects large and small include:

A) gifts from contractors.
B) exaggerated expense reports.
C) compromised quality standards to meet bonuses or avoid penalties related to schedules.
D) pressure to mask delays with false status reports.
E) all of the these.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
21
Agile project management is a type of work breakdown structure (WBS).
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
22
Describe agile projects.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
23
What are some of the ethical issues faced by project managers?
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
24
Identify each of the purposes of project scheduling.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
25
The ________ has established a code of ethics especially for project managers.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
26
The waterfall approach is used most often for:

A) well-defined projects.
B) projects whose changes tend to be minor.
C) projects with step-by-step progress.
D) engineered products with well-defined specifications and drawings.
E) all of the these.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
27
Describe some of the challenges faced in the construction of the new 11-story building at Arnold Palmer Hospital in Orlando, Florida.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
28
The shortest of all paths through the network is the critical path.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
29
Project managers often use the waterfall approach when managing agile projects.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
30
PERT, but not CPM, has the ability to consider the precedence relationships in a project.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
31
A(n) ________ divides a project into more and more detailed components.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
32
Ill-defined projects are typified by software development and new technology.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
33
A combination of effective Gantt chart use and other tactics allowed Delta to cut the average time for a plane layover by what % of the original 60-minute duration?

A) 33%, to 40 minutes
B) 50%, to 30 minutes
C) 20%, to 48 minutes
D) 25%, to 45 minutes
E) 40%, to 36 minutes
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
34
Which of the following statements regarding Gantt charts is TRUE?

A) Gantt charts give a timeline and precedence relationships for each activity of a project.
B) Gantt charts use the four standard spines of Methods, Materials, Manpower, and Machinery.
C) Gantt charts are visual devices that show the duration of activities in a project.
D) Gantt charts are expensive.
E) All of these are true.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
35
What is a project organization?
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
36
Identify the responsibilities of project managers.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
37
Projects such as road building and plane building are:

A) ill-defined.
B) well-defined.
C) agile.
D) not defined.
E) none of these.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
38
Gantt charts give a timeline for each of a project's activities, but they do not adequately illustrate the interrelationships between the activities and the resources.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
39
The control of projects involves close monitoring of which of the following?

A) resources
B) costs
C) quality
D) budgets
E) all of the these
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
40
Describe the differences between a Gantt chart and a PERT/CPM network.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
41
Which of the following statements regarding CPM networks is TRUE?

A) There can be multiple critical paths on the same project, all with different durations.
B) The early finish of an activity is the latest early start of all preceding activities.
C) The late start of an activity is its late finish plus its duration.
D) If a specific project has multiple critical paths, all of them will have the same duration.
E) None of these are true.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
42
Activity D on a CPM network has predecessors B and C, and has successor F. D has duration 6. B's earliest finish is 18, while C's is 20. F's late start is 26. Which of the following is definitely TRUE?

A) B is a critical activity.
B) C is completed before B.
C) D has no slack but is not critical.
D) D is critical, and has a slack of two days.
E) F is critical, and has zero slack.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
43
Which of the following statements regarding critical paths is TRUE?

A) The shortest of all paths through the network is the critical path.
B) Some activities on the critical path may have slack.
C) Every network has only one critical path.
D) On a specific project, there can be multiple critical paths, all with exactly the same duration.
E) The duration of the critical path is the average duration of all paths in the project network.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
44
The fundamental difference between PERT and CPM is that PERT uses the beta distribution for crashing projects while CPM uses cost estimates.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
45
Slack is the amount of time an activity can be delayed without delaying the entire project.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
46
The network analysis method that allows activity times to vary is ________.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
47
A simple CPM network has five activities, A, B, C, D, and E. A is an immediate predecessor of B and of C. B is an immediate predecessor of D and of E. C is an immediate predecessor of E. Which of the following statements is TRUE?

A) There are two paths in this network.
B) There are four paths in this network.
C) There are five paths in this network.
D) There are three paths in this network.
E) There are six paths in this network.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
48
Identify, in order, the six steps basic to both PERT and CPM.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
49
The difference between AON and AOA networks is that:

A) AOA networks sometimes require dummy activities.
B) nodes consume no resources or time in AOA networks.
C) both are acceptable in practice; however, Microsoft Project uses AON.
D) nodes designate activities in AON, while arrows designate activities in AOA.
E) All of the these are true.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
50
The ________ is the computed longest time path(s) through a network.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
51
Which of the following statements regarding CPM is TRUE?

A) The critical path is the shortest of all paths through the network.
B) The critical path is that set of activities that has positive slack.
C) Some networks have no critical path.
D) All activities on the critical path have their LS equal to the maximum EF of all immediate predecessors.
E) All activities on the critical path have their ES equal to their LF.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
52
Activity R on a CPM network has predecessors M and N, and has successor S. R has duration 5. N's late finish is 18, while M's is 20. S's late start is 22. Which of the following is definitely TRUE?

A) R is critical and has zero slack.
B) R has no slack but is not critical.
C) The set of times cannot all be possible.
D) N is a critical activity.
E) S is a critical activity.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
53
A simple CPM network has three activities, D, E, and F. D is an immediate predecessor of E and of F. E is an immediate predecessor of F. The activity durations are D=4, E=3, F=6.

A) The critical path is D-E-F, duration 12.
B) The critical path is D-F, duration 10.
C) Slack at D is 0 periods.
D) Slack at E is 3 periods.
E) Both A and C are true.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
54
The critical path can be determined by use of either the "forward pass" or the "backward pass."
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
55
The ________ is a project management technique using only one time factor per activity that enables managers to schedule, monitor, and control large and complex projects.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
56
The main difference between PERT and CPM is that:

A) PERT is more accurate than CPM.
B) PERT assumes that activity durations are known.
C) PERT ignores activity costs.
D) CPM assumes activity durations can vary.
E) PERT employs three time estimates for each activity.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
57
Every network has at most one critical path.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
58
What is the basic difference between PERT and CPM?
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
59
The ES of an activity that has only one predecessor is simply the EF of that predecessor.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
60
A simple CPM network has three activities, A, B, and C. A is an immediate predecessor of B and of C. B is an immediate predecessor of C. The activity durations are A=4, B=3, C=5.

A) The critical path is A-B-C, duration 9.
B) The critical path is A-B-C, duration 12.
C) The critical path is A-C, duration 10.5.
D) The critical path cannot be determined without knowing PERT expected activity times.
E) The network has no critical path.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
61
Explain why the critical path is the longest, not the shortest, path through a network.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
62
The critical path for the network activities shown below is ________ with duration ________. <strong>The critical path for the network activities shown below is ________ with duration ________.  </strong> A) A-B-D; 10 B) A-B-E; 11 C) C-E; 14 D) A-D-E; 13 E) A-B-C-D-E; 22

A) A-B-D; 10
B) A-B-E; 11
C) C-E; 14
D) A-D-E; 13
E) A-B-C-D-E; 22
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
63
The network below represents a project being analyzed by the critical path method. Activity durations are indicated on the network.
The network below represents a project being analyzed by the critical path method. Activity durations are indicated on the network.   (a) Identify the activities on the critical path. (b) What is the duration of the critical path? (c) Calculate the amount of slack time at activity H. (d) If activity I were delayed by ten time units, what would be the impact on the project duration? (a) Identify the activities on the critical path.
(b) What is the duration of the critical path?
(c) Calculate the amount of slack time at activity H.
(d) If activity I were delayed by ten time units, what would be the impact on the project duration?
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
64
The network below represents a project being analyzed by the critical path method. Activity durations are A = 5, B = 2, C = 12, D = 3, E = 5, F = 1, G = 7, H = 2, I = 10, and J = 6.
The network below represents a project being analyzed by the critical path method. Activity durations are A = 5, B = 2, C = 12, D = 3, E = 5, F = 1, G = 7, H = 2, I = 10, and J = 6.   (a) What task must be on the critical path, regardless of activity durations? (b) What is the duration of path A-B-E-H-J? (c) What is the critical path of this network? (d) What is the length of the critical path? (e) What is slack time at activity H? (f) What is the Late Finish of activity H? (g) If activity C was delayed by six time units, what would happen to the project duration? (a) What task must be on the critical path, regardless of activity durations?
(b) What is the duration of path A-B-E-H-J?
(c) What is the critical path of this network?
(d) What is the length of the critical path?
(e) What is slack time at activity H?
(f) What is the Late Finish of activity H?
(g) If activity C was delayed by six time units, what would happen to the project duration?
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
65
Given the project within the table below, calculate the following:
(a) The critical path
(b) The minimum project duration
(c) The amount of slack for each activity
Given the project within the table below, calculate the following: (a) The critical path (b) The minimum project duration (c) The amount of slack for each activity
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
66
What are the earliest activity start time and latest activity start time, and how are they computed?
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
67
The following activities are part of a project to be scheduled using the critical path method.
The following activities are part of a project to be scheduled using the critical path method.   Calculate (a) The critical path. (b) The slack available at any non-critical points. (c) The minimum project duration. Calculate
(a) The critical path.
(b) The slack available at any non-critical points.
(c) The minimum project duration.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
68
The critical path for the network activities shown below is ________ with duration ________. <strong>The critical path for the network activities shown below is ________ with duration ________.  </strong> A) A-C-E; 20 B) A-D-E; 18 C) B-E; 14 D) A-B-D-E; 26 E) none of the above

A) A-C-E; 20
B) A-D-E; 18
C) B-E; 14
D) A-B-D-E; 26
E) none of the above
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
69
The standard deviation of project duration is the average of the standard deviation of all activities on the critical path.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
70
Consider the network presented in the following table. Calculate
(a) All possible paths
(b) The critical path
(c) The slack available at any non-critical points
(d) The minimum project duration
Consider the network presented in the following table. Calculate (a) All possible paths (b) The critical path (c) The slack available at any non-critical points (d) The minimum project duration
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
71
________ is the amount of time an individual activity in a network can be delayed without delaying the entire project.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
72
The critical path for the network activities shown below is ________ with duration ________. <strong>The critical path for the network activities shown below is ________ with duration ________.  </strong> A) A-D-E; 11 B) B-E; 7 C) B-D-E; 13 D) A-C-E; 6 E) B-C-E; 8

A) A-D-E; 11
B) B-E; 7
C) B-D-E; 13
D) A-C-E; 6
E) B-C-E; 8
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
73
Define slack time.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
74
What is the objective of critical path analysis?
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
75
Draw the AOA and AON networks for the following project and calculate the minimum project duration.
Draw the AOA and AON networks for the following project and calculate the minimum project duration.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
76
In PERT analysis, the identification of the critical path can be incorrect if a noncritical activity takes substantially more than its expected time.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
77
A network consists of the following list. Times are given in weeks.
A network consists of the following list. Times are given in weeks.   (a) Draw the network diagram. (b) Which activities form the critical path? (c) How much slack exists at activities A and F? (d) What is the duration of the critical path? (a) Draw the network diagram.
(b) Which activities form the critical path?
(c) How much slack exists at activities A and F?
(d) What is the duration of the critical path?
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
78
A network consists of the activities in the following list. Times are given in weeks.
A network consists of the activities in the following list. Times are given in weeks.   (a) Draw the network diagram. (b) Calculate the ES, EF, LS, LF, and Slack for each activity. (c) What is project completion time? (a) Draw the network diagram.
(b) Calculate the ES, EF, LS, LF, and Slack for each activity.
(c) What is project completion time?
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
79
Which of the following statements concerning CPM activities is false?

A) The early finish of an activity is the early start of that activity plus its duration.
B) The late finish is the earliest of the late start times of all successor activities.
C) The late start of an activity is its late finish less its duration.
D) The late finish of an activity is the earliest late start of all preceding activities.
E) The early start of an activity is the latest early finish of all preceding activities.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
80
The PERT pessimistic time estimate is an estimate of the minimum time an activity will require.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck