Deck 8: Measuring and Controlling Quality

Full screen (f)
exit full mode
Question
A nonconforming unit of work is one that has no defects or errors.
Use Space or
up arrow
down arrow
to flip the card.
Question
Common and special causes of variation must be eliminated before process capability can be determined.
Question
A better alternative to the A better alternative to the   -chart to monitor variation is to compute and plot the standard deviation s of each sample.<div style=padding-top: 35px> -chart to monitor variation is to compute and plot the standard deviation s of each sample.
Question
The total observed variation in production output is the sum of the true process variation plus variation due to measurement.
Question
If most of the points on a control chart fluctuate randomly between the control limits with no recognizable pattern,then the process is in statistical control.
Question
A p-chart is used with the attribute data.
Question
The frequency of sampling in pre-control is often determined by dividing the time period between two successive out-of-control signals by six.
Question
A "hugging the center line" pattern in a control chart can be the result of taking each sample from a different process but not mixed together.
Question
Rolled throughput yield is the proportion of conforming units that results from a series of process steps.
Question
Process capability indices can be computed from data in an Process capability indices can be computed from data in an   -chart.<div style=padding-top: 35px> -chart.
Question
Attribute measurement requires a much larger sample size than variable measurement to obtain the same amount of statistical information.
Question
If all sample averages on an If all sample averages on an   -chart fall within the control limits,all output will be conforming.<div style=padding-top: 35px> -chart fall within the control limits,all output will be conforming.
Question
A histogram of data that resembles the normal distribution indicates that the process is in control.
Question
If points on a control chart are determined to be the result of special causes,the points should be eliminated and new control limits should be computed.
Question
For variable data,the two important quality measures are the proportion nonconforming and nonconformances per unit.
Question
Histograms allow you to distinguish between common and special causes of variation.
Question
A measurement system may be precise but not necessarily accurate at the same time.
Question
Pre-control should only be used when process capability is no greater than 88 percent of the tolerance.
Question
The larger the sample size,the narrower the control limits.
Question
The center line for the np-chart is the average number of nonconforming items per sample.
Question
When constructing a u-chart,the standard deviation of each sample varies because the size of the sampling unit varies.
Question
If a process is neither capable nor in control,the appropriate first step is to:

A)remove common causes of variation.
B)redesign the equipment.
C)remove special causes of variation.
D)determine the process capability index.
Question
Control limits for variables and attributes data utilize different mathematical formulas.
Question
The output of a process is stable and normally distributed.If the process mean equals 23.5,the percentage of output expected to be less than or equal to the mean:

A)is less than 25%.
B)is 50%.
C)is greater than 75%.
D)cannot be determined without knowing the standard deviation value.
Question
_____ is measured as the amount of error in a measurement in proportion to the total size of the measurement.

A)Precision
B)Accuracy
C)Systematic bias
D)Capability
Question
Compared to variable measurement,attributes measurement requires _____ to obtain the same amount of statistical information about the quality of the product.

A)a more distributed population
B)more nonconformances
C)a larger sample
D)a smaller sample
Question
In pre-control,which zone covers the nominal specification of a process?

A)Gray zone
B)Green zone
C)Red zone
D)Yellow zone
Question
In service applications,the term _____ is generally used to describe a nonconformance.

A)cycle
B)unit
C)error
D)trend
Question
If the cost of investigating an operation to identify the cause of an apparent out-of-control condition is low,narrower control limits should be selected.
Question
In determining the method of sampling,samples should be chosen to be as heterogeneous as possible so that each sample reflects the system of common causes or assignable causes that may be present at that point in time.
Question
Control limits for the s-chart are given by: LCLs = B3s and UCLs = B4s,where B3 and B4 are constants.
Question
If the variation in the process is due to common causes alone,the process is said to be:

A)out of control.
B)in pre-control.
C)in statistical control.
D)out of capability.
Question
Defects per million opportunities (dpmo)= _____.

A)(Number of defects discovered / Opportunities for error) x 100,000
B)(Number of defects discovered / Opportunities for error) x1,000,000
C)Opportunities for error x Number of defects discovered / 1,000,000
D)Opportunities for error / (Number of defects discovered x 10,000,000)
Question
Process capability calculations make little sense if the process:

A)data were taken over a period of time.
B)is not in statistical control.
C)variations are due to common causes.
D)is not initiated.
Question
Collecting _____ data is usually easier than collecting _____ data because the assessment can usually be done more quickly by a simple inspection or count.

A)variable; attribute
B)conformances; nonconformances
C)attribute; variable
D)simple; complex
Question
A(n)_____ characterizes the presence or absence of nonconformances in a unit of work.

A)variable
B)indicator
C)attribute
D)error
Question
Variable data are _____.

A)discrete
B)not measurable
C)continuous
D)nonrandom
Question
A c-chart is based on the binomial distribution.
Question
A process is said to be out of control when:

A)common causes are present.
B)special causes are present.
C)the process is not capable of meeting specifications.
D)the upper and lower control limits cannot be computed.
Question
_____ is a study of variation in a measurement system using statistical analysis.

A)Metrology study
B)SPC study
C)A repeatability and reproducibility (R&R) study
D)Calibration study
Question
A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50 ± 0.25 cm.The company has established an <strong>A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50 ± 0.25 cm.The company has established an   -chart and an R-chart using samples of size five.The center lines for the   -chart and R-chart are set at 35.25 cm and 1.08 cm,respectively.What is the value of Cp for this process?</strong> A)1.333 B)0.179 C)0.301 D)0.166 <div style=padding-top: 35px> -chart and an R-chart using samples of size five.The center lines for the <strong>A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50 ± 0.25 cm.The company has established an   -chart and an R-chart using samples of size five.The center lines for the   -chart and R-chart are set at 35.25 cm and 1.08 cm,respectively.What is the value of Cp for this process?</strong> A)1.333 B)0.179 C)0.301 D)0.166 <div style=padding-top: 35px> -chart and R-chart are set at 35.25 cm and 1.08 cm,respectively.What is the value of Cp for this process?

A)1.333
B)0.179
C)0.301
D)0.166
Question
An alternative to using the R-chart is the:

A)np-chart.
B)s-chart.
C)c-chart.
D)p-chart.
Question
Which of the following is a likely cause of the control chart pattern known as a "trend"?

A)Aging equipment
B)Maintenance schedules
C)New process operator
D)Sudden power surge
Question
For variables data,the sample means are assumed to be:

A)exponentially distributed.
B)normally distributed.
C)Poisson distributed.
D)binomially distributed.
Question
In determining whether a process is in statistical control,the _____ is/are generally analyzed first.

A)R-chart
B)upper and lower control limits
C)-chart
D)center line <strong>In determining whether a process is in statistical control,the _____ is/are generally analyzed first.</strong> A)R-chart B)upper and lower control limits C)-chart D)center line   <div style=padding-top: 35px>
Question
A machined part has a lower specification limit of 3.5 inches and an upper specification limit of 3.9 inches.The range for the pre-control green zone is:

A)3.6 inches to 3.8 inches.
B)3.8 inches to 3.9 inches.
C)less than 3.5 inches.
D)3.5 inches to 3.9 inches.
Question
If the process mean and variance do not change over time,the process is considered to be:

A)in statistical control.
B)normally distributed.
C)stable.
D)capable.
Question
Short repeated patterns in a control chart,with alternating high peaks and low valleys,are known as:

A)trends.
B)cycles.
C)shifts.
D)runs.
Question
Which of the following pairs of charts are used together?

A) <strong>Which of the following pairs of charts are used together?</strong> A)   -chart and p-chart B)R-chart and p-chart C)R-chart and s-chart D)   -chart and R-chart <div style=padding-top: 35px> -chart and p-chart
B)R-chart and p-chart
C)R-chart and s-chart
D) <strong>Which of the following pairs of charts are used together?</strong> A)   -chart and p-chart B)R-chart and p-chart C)R-chart and s-chart D)   -chart and R-chart <div style=padding-top: 35px> -chart and R-chart
Question
Twenty samples of size 6 were collected for a variable measurement.Determine the upper control limit (UCL)and lower control limit (LCL)for an R-chart if the sum of the sample ranges equals 88.0.

A)UCL = 8.8176, LCL = 0.0000
B)UCL = 9.3016, LCL = 0.3344
C)UCL = 13.2000, LCL = 0.0000
D)UCL = 29.3921, LCL = 0.0000
Question
A _____ is the result of some cause that gradually affects the quality characteristics of the product and causes the points on a control chart to gradually move up or down from the center line.

A)defect
B)process shift
C)cycle
D)trend
Question
Which of the following is NOT an indication of an out-of-control process?

A)Five consecutive points fall on one side of the center line.
B)Four of five consecutive points fall within the outer two-thirds region between the center line and one of the control limits.
C)Two of three consecutive points fall in the outer one-third region between the center line and one of the control limits.
D)A single point falls above the upper control limit.
Question
The _____ is used to monitor the centering of the process.

A) <strong>The _____ is used to monitor the centering of the process.</strong> A)   -chart B)R-chart C)p-chart D)np-chart <div style=padding-top: 35px> -chart
B)R-chart
C)p-chart
D)np-chart
Question
The s-chart is recommended when:

A)the control chart calculations needs to be performed by hand.
B)tight control of variability in the process is required.
C)the <strong>The s-chart is recommended when:</strong> A)the control chart calculations needs to be performed by hand. B)tight control of variability in the process is required. C)the   -chart is not associated with an R-chart. D)the sample size for each sample needs to be reduced. <div style=padding-top: 35px>
-chart is not associated with an R-chart.
D)the sample size for each sample needs to be reduced.
Question
A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50 ± 0.25 cm.The company has established an <strong>A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50 ± 0.25 cm.The company has established an   -chart and an R-chart using samples of size five.The center lines for the   -chart and R-chart are set at 37.35 cm and 1.05 cm,respectively.What is the value of Cpk for this process?</strong> A)0.07 B)0.28 C)0.75 D)0.03 <div style=padding-top: 35px> -chart and an R-chart using samples of size five.The center lines for the <strong>A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50 ± 0.25 cm.The company has established an   -chart and an R-chart using samples of size five.The center lines for the   -chart and R-chart are set at 37.35 cm and 1.05 cm,respectively.What is the value of Cpk for this process?</strong> A)0.07 B)0.28 C)0.75 D)0.03 <div style=padding-top: 35px> -chart and R-chart are set at 37.35 cm and 1.05 cm,respectively.What is the value of Cpk for this process?

A)0.07
B)0.28
C)0.75
D)0.03
Question
Six samples of size 10 were collected.The data are provided in the following table: The upper control limit (UCL)and lower control limit (LCL)for an s-chart are:
<strong>Six samples of size 10 were collected.The data are provided in the following table: The upper control limit (UCL)and lower control limit (LCL)for an s-chart are:  </strong> A)LCL = 0.2840, UCL = 1.7160. B)LCL = 0.0994, UCL = 0.6006. C)LCL = 4.6256, UCL = 5.3256. D)LCL = 3.6750, UCL = 5.7750. <div style=padding-top: 35px>

A)LCL = 0.2840, UCL = 1.7160.
B)LCL = 0.0994, UCL = 0.6006.
C)LCL = 4.6256, UCL = 5.3256.
D)LCL = 3.6750, UCL = 5.7750.
Question
Statistical process control relies on _____.

A)process capability studies
B)dashboards
C)control charts
D)metrology
Question
Control limits are often confused with _____.

A)pre-control lines
B)center lines
C)specification limits
D)three sigma limits
Question
A company wishes to monitor the variation in the length of time it takes to process and send a bill to a customer.Seven bills will be randomly selected each day for a 60-day period and the length of time it takes to process and send the bill to a customer will be recorded for each bill.The appropriate control chart is a(n):

A) <strong>A company wishes to monitor the variation in the length of time it takes to process and send a bill to a customer.Seven bills will be randomly selected each day for a 60-day period and the length of time it takes to process and send the bill to a customer will be recorded for each bill.The appropriate control chart is a(n):</strong> A)   -chart. B)R-chart. C)p-chart. D)u-chart. <div style=padding-top: 35px> -chart.
B)R-chart.
C)p-chart.
D)u-chart.
Question
Which of the following is NOT one of the basic applications of a control chart?

A)To establish a state of statistical control.
B)To calculate the average-range.
C)To monitor a process to identify special causes of variation.
D)To determine process capability.
Question
If the lower limit for a p-chart computes to a number less than zero,this indicates:

A)that the lower limit should be set at zero.
B)that the process is out of control.
C)that an attribute measure is incorrectly used.
D)that a calculation error has been made.
Question
Discuss the differences between attributes and variables data.
Question
A specification is 50.0 cm ± 10.0 cm.Sketch and label the pre-control zones for this specification.Include the following values on your sketch: nominal,upper and lower specification limits,and end points of the green zone.
Question
A canning company defines a "nonconformance" as an orange juice can whose diameter is beyond the upper specification limit.A manager at the canning company wants to monitor the number of such orange juice cans produced per day.Each day,an employee will randomly select 120 cans over a period of four weeks.The employee then determines and plots the number of nonconformance cans in each sample.The appropriate control chart is a(n):

A)u-chart.
B)R-chart.
C)p-chart.
D)np-chart.
Question
A _____ monitors the fraction of nonconforming units.

A)c-chart
B)u-chart
C)np-chart
D)p-chart
Question
x-charts are used for:

A)averages of variables data.
B)individual attributes data.
C)individual variables data.
D)averages of attributes data.
Question
25 samples of size 100 were collected and a total of 96 nonconforming items were found.The upper control limit for a p-chart would be:

A)0.083.
B)0.096.
C)0.137.
D)0.254.
Question
The sample size for an x-chart:

A)should be between 25 and 30.
B)is larger than that for an <strong>The sample size for an x-chart:</strong> A)should be between 25 and 30. B)is larger than that for an   -chart. C)is equal to one. D)should be greater than one. <div style=padding-top: 35px> -chart.
C)is equal to one.
D)should be greater than one.
Question
Each day,a manufacturing company producing circuit boards will randomly sample 60 circuit boards for a period of 25 days and then determine and plot the number of defects contained in each of these boards.The appropriate control chart is a(n):

A)u-chart.
B)p-chart.
C)np-chart.
D)c-chart.
Question
All else being constant,if the sample size in a p-chart increases from 100 to 120,the upper and lower control limits will:

A)move farther apart.
B)move closer together.
C)not be affected.
D)both shift upward.
Question
A delivery company defines a "defect" as a package delivered later than the promised delivery time.Management wants to monitor the proportion of such defect packages per week and plans to sample 120 packages every week.The appropriate control chart is a(n):

A) <strong>A delivery company defines a defect as a package delivered later than the promised delivery time.Management wants to monitor the proportion of such defect packages per week and plans to sample 120 packages every week.The appropriate control chart is a(n):</strong> A)   -chart. B)R-chart. C)p-chart. D)np-chart. <div style=padding-top: 35px> -chart.
B)R-chart.
C)p-chart.
D)np-chart.
Question
Which of the following charts is used to monitor the average number of nonconformances per unit when sample sizes vary?

A) <strong>Which of the following charts is used to monitor the average number of nonconformances per unit when sample sizes vary?</strong> A)   -chart B)u-chart C)p-chart D)c-chart <div style=padding-top: 35px> -chart
B)u-chart
C)p-chart
D)c-chart
Question
Which of the following is a major advantage of np-charts?

A)They can be used for variable sample sizes.
B)They are more accurate than p-charts.
C)They are easier to understand for production personnel.
D)The control limits are based on binomial distribution.
Question
Which of the following is CORRECT regarding an x-chart?

A)Individual data require averaging before being plotted on it.
B)It is less sensitive to many conditions that can be detected by <strong>Which of the following is CORRECT regarding an x-chart?</strong> A)Individual data require averaging before being plotted on it. B)It is less sensitive to many conditions that can be detected by   -chart and R-chart. C)Specification limits cannot be drawn on the chart for direct comparison with the control limits. D)The assumption of normality of observations is less critical than for   -chart and R-charts. <div style=padding-top: 35px> -chart and R-chart.
C)Specification limits cannot be drawn on the chart for direct comparison with the control limits.
D)The assumption of normality of observations is less critical than for <strong>Which of the following is CORRECT regarding an x-chart?</strong> A)Individual data require averaging before being plotted on it. B)It is less sensitive to many conditions that can be detected by   -chart and R-chart. C)Specification limits cannot be drawn on the chart for direct comparison with the control limits. D)The assumption of normality of observations is less critical than for   -chart and R-charts. <div style=padding-top: 35px> -chart and R-charts.
Question
To form rational subgroups for an <strong>To form rational subgroups for an   -chart,the goal is to choose the samples as _____ as possible.</strong> A)heterogeneous B)homogeneous C)large D)systematic <div style=padding-top: 35px> -chart,the goal is to choose the samples as _____ as possible.

A)heterogeneous
B)homogeneous
C)large
D)systematic
Question
Define pre-control and explain under what conditions pre-control can be used.
Question
Because of high test costs,a sample of single wastewater sludge is tested daily for dissolved oxygen content.The appropriate control chart is:

A) <strong>Because of high test costs,a sample of single wastewater sludge is tested daily for dissolved oxygen content.The appropriate control chart is:</strong> A)   -chart and R-chart. B)u-chart. C)x-chart and moving range chart. D)x-chart and R-chart. <div style=padding-top: 35px> -chart and R-chart.
B)u-chart.
C)x-chart and moving range chart.
D)x-chart and R-chart.
Question
c-charts are based on the _____ probability distribution.

A)normal
B)binomial
C)Poisson
D)exponential
Question
The control chart most appropriate for plotting the daily percentage of students that wait longer than 5 minutes in line at the undergraduate admissions office is a(n):

A)p-chart.
B)np-chart.
C)x-chart.
Question
For statistical process control,a good sampling method should always:

A)use samples of random measurements over a long period of time.
B)minimize sampling cost.
C)maximize sample size.
D)use rational subgroups.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/105
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 8: Measuring and Controlling Quality
1
A nonconforming unit of work is one that has no defects or errors.
False
2
Common and special causes of variation must be eliminated before process capability can be determined.
False
3
A better alternative to the A better alternative to the   -chart to monitor variation is to compute and plot the standard deviation s of each sample. -chart to monitor variation is to compute and plot the standard deviation s of each sample.
False
4
The total observed variation in production output is the sum of the true process variation plus variation due to measurement.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
5
If most of the points on a control chart fluctuate randomly between the control limits with no recognizable pattern,then the process is in statistical control.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
6
A p-chart is used with the attribute data.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
7
The frequency of sampling in pre-control is often determined by dividing the time period between two successive out-of-control signals by six.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
8
A "hugging the center line" pattern in a control chart can be the result of taking each sample from a different process but not mixed together.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
9
Rolled throughput yield is the proportion of conforming units that results from a series of process steps.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
10
Process capability indices can be computed from data in an Process capability indices can be computed from data in an   -chart. -chart.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
11
Attribute measurement requires a much larger sample size than variable measurement to obtain the same amount of statistical information.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
12
If all sample averages on an If all sample averages on an   -chart fall within the control limits,all output will be conforming. -chart fall within the control limits,all output will be conforming.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
13
A histogram of data that resembles the normal distribution indicates that the process is in control.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
14
If points on a control chart are determined to be the result of special causes,the points should be eliminated and new control limits should be computed.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
15
For variable data,the two important quality measures are the proportion nonconforming and nonconformances per unit.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
16
Histograms allow you to distinguish between common and special causes of variation.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
17
A measurement system may be precise but not necessarily accurate at the same time.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
18
Pre-control should only be used when process capability is no greater than 88 percent of the tolerance.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
19
The larger the sample size,the narrower the control limits.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
20
The center line for the np-chart is the average number of nonconforming items per sample.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
21
When constructing a u-chart,the standard deviation of each sample varies because the size of the sampling unit varies.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
22
If a process is neither capable nor in control,the appropriate first step is to:

A)remove common causes of variation.
B)redesign the equipment.
C)remove special causes of variation.
D)determine the process capability index.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
23
Control limits for variables and attributes data utilize different mathematical formulas.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
24
The output of a process is stable and normally distributed.If the process mean equals 23.5,the percentage of output expected to be less than or equal to the mean:

A)is less than 25%.
B)is 50%.
C)is greater than 75%.
D)cannot be determined without knowing the standard deviation value.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
25
_____ is measured as the amount of error in a measurement in proportion to the total size of the measurement.

A)Precision
B)Accuracy
C)Systematic bias
D)Capability
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
26
Compared to variable measurement,attributes measurement requires _____ to obtain the same amount of statistical information about the quality of the product.

A)a more distributed population
B)more nonconformances
C)a larger sample
D)a smaller sample
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
27
In pre-control,which zone covers the nominal specification of a process?

A)Gray zone
B)Green zone
C)Red zone
D)Yellow zone
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
28
In service applications,the term _____ is generally used to describe a nonconformance.

A)cycle
B)unit
C)error
D)trend
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
29
If the cost of investigating an operation to identify the cause of an apparent out-of-control condition is low,narrower control limits should be selected.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
30
In determining the method of sampling,samples should be chosen to be as heterogeneous as possible so that each sample reflects the system of common causes or assignable causes that may be present at that point in time.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
31
Control limits for the s-chart are given by: LCLs = B3s and UCLs = B4s,where B3 and B4 are constants.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
32
If the variation in the process is due to common causes alone,the process is said to be:

A)out of control.
B)in pre-control.
C)in statistical control.
D)out of capability.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
33
Defects per million opportunities (dpmo)= _____.

A)(Number of defects discovered / Opportunities for error) x 100,000
B)(Number of defects discovered / Opportunities for error) x1,000,000
C)Opportunities for error x Number of defects discovered / 1,000,000
D)Opportunities for error / (Number of defects discovered x 10,000,000)
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
34
Process capability calculations make little sense if the process:

A)data were taken over a period of time.
B)is not in statistical control.
C)variations are due to common causes.
D)is not initiated.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
35
Collecting _____ data is usually easier than collecting _____ data because the assessment can usually be done more quickly by a simple inspection or count.

A)variable; attribute
B)conformances; nonconformances
C)attribute; variable
D)simple; complex
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
36
A(n)_____ characterizes the presence or absence of nonconformances in a unit of work.

A)variable
B)indicator
C)attribute
D)error
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
37
Variable data are _____.

A)discrete
B)not measurable
C)continuous
D)nonrandom
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
38
A c-chart is based on the binomial distribution.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
39
A process is said to be out of control when:

A)common causes are present.
B)special causes are present.
C)the process is not capable of meeting specifications.
D)the upper and lower control limits cannot be computed.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
40
_____ is a study of variation in a measurement system using statistical analysis.

A)Metrology study
B)SPC study
C)A repeatability and reproducibility (R&R) study
D)Calibration study
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
41
A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50 ± 0.25 cm.The company has established an <strong>A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50 ± 0.25 cm.The company has established an   -chart and an R-chart using samples of size five.The center lines for the   -chart and R-chart are set at 35.25 cm and 1.08 cm,respectively.What is the value of Cp for this process?</strong> A)1.333 B)0.179 C)0.301 D)0.166 -chart and an R-chart using samples of size five.The center lines for the <strong>A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50 ± 0.25 cm.The company has established an   -chart and an R-chart using samples of size five.The center lines for the   -chart and R-chart are set at 35.25 cm and 1.08 cm,respectively.What is the value of Cp for this process?</strong> A)1.333 B)0.179 C)0.301 D)0.166 -chart and R-chart are set at 35.25 cm and 1.08 cm,respectively.What is the value of Cp for this process?

A)1.333
B)0.179
C)0.301
D)0.166
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
42
An alternative to using the R-chart is the:

A)np-chart.
B)s-chart.
C)c-chart.
D)p-chart.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
43
Which of the following is a likely cause of the control chart pattern known as a "trend"?

A)Aging equipment
B)Maintenance schedules
C)New process operator
D)Sudden power surge
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
44
For variables data,the sample means are assumed to be:

A)exponentially distributed.
B)normally distributed.
C)Poisson distributed.
D)binomially distributed.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
45
In determining whether a process is in statistical control,the _____ is/are generally analyzed first.

A)R-chart
B)upper and lower control limits
C)-chart
D)center line <strong>In determining whether a process is in statistical control,the _____ is/are generally analyzed first.</strong> A)R-chart B)upper and lower control limits C)-chart D)center line
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
46
A machined part has a lower specification limit of 3.5 inches and an upper specification limit of 3.9 inches.The range for the pre-control green zone is:

A)3.6 inches to 3.8 inches.
B)3.8 inches to 3.9 inches.
C)less than 3.5 inches.
D)3.5 inches to 3.9 inches.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
47
If the process mean and variance do not change over time,the process is considered to be:

A)in statistical control.
B)normally distributed.
C)stable.
D)capable.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
48
Short repeated patterns in a control chart,with alternating high peaks and low valleys,are known as:

A)trends.
B)cycles.
C)shifts.
D)runs.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
49
Which of the following pairs of charts are used together?

A) <strong>Which of the following pairs of charts are used together?</strong> A)   -chart and p-chart B)R-chart and p-chart C)R-chart and s-chart D)   -chart and R-chart -chart and p-chart
B)R-chart and p-chart
C)R-chart and s-chart
D) <strong>Which of the following pairs of charts are used together?</strong> A)   -chart and p-chart B)R-chart and p-chart C)R-chart and s-chart D)   -chart and R-chart -chart and R-chart
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
50
Twenty samples of size 6 were collected for a variable measurement.Determine the upper control limit (UCL)and lower control limit (LCL)for an R-chart if the sum of the sample ranges equals 88.0.

A)UCL = 8.8176, LCL = 0.0000
B)UCL = 9.3016, LCL = 0.3344
C)UCL = 13.2000, LCL = 0.0000
D)UCL = 29.3921, LCL = 0.0000
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
51
A _____ is the result of some cause that gradually affects the quality characteristics of the product and causes the points on a control chart to gradually move up or down from the center line.

A)defect
B)process shift
C)cycle
D)trend
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
52
Which of the following is NOT an indication of an out-of-control process?

A)Five consecutive points fall on one side of the center line.
B)Four of five consecutive points fall within the outer two-thirds region between the center line and one of the control limits.
C)Two of three consecutive points fall in the outer one-third region between the center line and one of the control limits.
D)A single point falls above the upper control limit.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
53
The _____ is used to monitor the centering of the process.

A) <strong>The _____ is used to monitor the centering of the process.</strong> A)   -chart B)R-chart C)p-chart D)np-chart -chart
B)R-chart
C)p-chart
D)np-chart
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
54
The s-chart is recommended when:

A)the control chart calculations needs to be performed by hand.
B)tight control of variability in the process is required.
C)the <strong>The s-chart is recommended when:</strong> A)the control chart calculations needs to be performed by hand. B)tight control of variability in the process is required. C)the   -chart is not associated with an R-chart. D)the sample size for each sample needs to be reduced.
-chart is not associated with an R-chart.
D)the sample size for each sample needs to be reduced.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
55
A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50 ± 0.25 cm.The company has established an <strong>A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50 ± 0.25 cm.The company has established an   -chart and an R-chart using samples of size five.The center lines for the   -chart and R-chart are set at 37.35 cm and 1.05 cm,respectively.What is the value of Cpk for this process?</strong> A)0.07 B)0.28 C)0.75 D)0.03 -chart and an R-chart using samples of size five.The center lines for the <strong>A precision parts manufacturer produces bolts for use in military aircraft.The specifications for bolt length are 37.50 ± 0.25 cm.The company has established an   -chart and an R-chart using samples of size five.The center lines for the   -chart and R-chart are set at 37.35 cm and 1.05 cm,respectively.What is the value of Cpk for this process?</strong> A)0.07 B)0.28 C)0.75 D)0.03 -chart and R-chart are set at 37.35 cm and 1.05 cm,respectively.What is the value of Cpk for this process?

A)0.07
B)0.28
C)0.75
D)0.03
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
56
Six samples of size 10 were collected.The data are provided in the following table: The upper control limit (UCL)and lower control limit (LCL)for an s-chart are:
<strong>Six samples of size 10 were collected.The data are provided in the following table: The upper control limit (UCL)and lower control limit (LCL)for an s-chart are:  </strong> A)LCL = 0.2840, UCL = 1.7160. B)LCL = 0.0994, UCL = 0.6006. C)LCL = 4.6256, UCL = 5.3256. D)LCL = 3.6750, UCL = 5.7750.

A)LCL = 0.2840, UCL = 1.7160.
B)LCL = 0.0994, UCL = 0.6006.
C)LCL = 4.6256, UCL = 5.3256.
D)LCL = 3.6750, UCL = 5.7750.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
57
Statistical process control relies on _____.

A)process capability studies
B)dashboards
C)control charts
D)metrology
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
58
Control limits are often confused with _____.

A)pre-control lines
B)center lines
C)specification limits
D)three sigma limits
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
59
A company wishes to monitor the variation in the length of time it takes to process and send a bill to a customer.Seven bills will be randomly selected each day for a 60-day period and the length of time it takes to process and send the bill to a customer will be recorded for each bill.The appropriate control chart is a(n):

A) <strong>A company wishes to monitor the variation in the length of time it takes to process and send a bill to a customer.Seven bills will be randomly selected each day for a 60-day period and the length of time it takes to process and send the bill to a customer will be recorded for each bill.The appropriate control chart is a(n):</strong> A)   -chart. B)R-chart. C)p-chart. D)u-chart. -chart.
B)R-chart.
C)p-chart.
D)u-chart.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
60
Which of the following is NOT one of the basic applications of a control chart?

A)To establish a state of statistical control.
B)To calculate the average-range.
C)To monitor a process to identify special causes of variation.
D)To determine process capability.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
61
If the lower limit for a p-chart computes to a number less than zero,this indicates:

A)that the lower limit should be set at zero.
B)that the process is out of control.
C)that an attribute measure is incorrectly used.
D)that a calculation error has been made.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
62
Discuss the differences between attributes and variables data.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
63
A specification is 50.0 cm ± 10.0 cm.Sketch and label the pre-control zones for this specification.Include the following values on your sketch: nominal,upper and lower specification limits,and end points of the green zone.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
64
A canning company defines a "nonconformance" as an orange juice can whose diameter is beyond the upper specification limit.A manager at the canning company wants to monitor the number of such orange juice cans produced per day.Each day,an employee will randomly select 120 cans over a period of four weeks.The employee then determines and plots the number of nonconformance cans in each sample.The appropriate control chart is a(n):

A)u-chart.
B)R-chart.
C)p-chart.
D)np-chart.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
65
A _____ monitors the fraction of nonconforming units.

A)c-chart
B)u-chart
C)np-chart
D)p-chart
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
66
x-charts are used for:

A)averages of variables data.
B)individual attributes data.
C)individual variables data.
D)averages of attributes data.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
67
25 samples of size 100 were collected and a total of 96 nonconforming items were found.The upper control limit for a p-chart would be:

A)0.083.
B)0.096.
C)0.137.
D)0.254.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
68
The sample size for an x-chart:

A)should be between 25 and 30.
B)is larger than that for an <strong>The sample size for an x-chart:</strong> A)should be between 25 and 30. B)is larger than that for an   -chart. C)is equal to one. D)should be greater than one. -chart.
C)is equal to one.
D)should be greater than one.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
69
Each day,a manufacturing company producing circuit boards will randomly sample 60 circuit boards for a period of 25 days and then determine and plot the number of defects contained in each of these boards.The appropriate control chart is a(n):

A)u-chart.
B)p-chart.
C)np-chart.
D)c-chart.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
70
All else being constant,if the sample size in a p-chart increases from 100 to 120,the upper and lower control limits will:

A)move farther apart.
B)move closer together.
C)not be affected.
D)both shift upward.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
71
A delivery company defines a "defect" as a package delivered later than the promised delivery time.Management wants to monitor the proportion of such defect packages per week and plans to sample 120 packages every week.The appropriate control chart is a(n):

A) <strong>A delivery company defines a defect as a package delivered later than the promised delivery time.Management wants to monitor the proportion of such defect packages per week and plans to sample 120 packages every week.The appropriate control chart is a(n):</strong> A)   -chart. B)R-chart. C)p-chart. D)np-chart. -chart.
B)R-chart.
C)p-chart.
D)np-chart.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
72
Which of the following charts is used to monitor the average number of nonconformances per unit when sample sizes vary?

A) <strong>Which of the following charts is used to monitor the average number of nonconformances per unit when sample sizes vary?</strong> A)   -chart B)u-chart C)p-chart D)c-chart -chart
B)u-chart
C)p-chart
D)c-chart
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
73
Which of the following is a major advantage of np-charts?

A)They can be used for variable sample sizes.
B)They are more accurate than p-charts.
C)They are easier to understand for production personnel.
D)The control limits are based on binomial distribution.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
74
Which of the following is CORRECT regarding an x-chart?

A)Individual data require averaging before being plotted on it.
B)It is less sensitive to many conditions that can be detected by <strong>Which of the following is CORRECT regarding an x-chart?</strong> A)Individual data require averaging before being plotted on it. B)It is less sensitive to many conditions that can be detected by   -chart and R-chart. C)Specification limits cannot be drawn on the chart for direct comparison with the control limits. D)The assumption of normality of observations is less critical than for   -chart and R-charts. -chart and R-chart.
C)Specification limits cannot be drawn on the chart for direct comparison with the control limits.
D)The assumption of normality of observations is less critical than for <strong>Which of the following is CORRECT regarding an x-chart?</strong> A)Individual data require averaging before being plotted on it. B)It is less sensitive to many conditions that can be detected by   -chart and R-chart. C)Specification limits cannot be drawn on the chart for direct comparison with the control limits. D)The assumption of normality of observations is less critical than for   -chart and R-charts. -chart and R-charts.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
75
To form rational subgroups for an <strong>To form rational subgroups for an   -chart,the goal is to choose the samples as _____ as possible.</strong> A)heterogeneous B)homogeneous C)large D)systematic -chart,the goal is to choose the samples as _____ as possible.

A)heterogeneous
B)homogeneous
C)large
D)systematic
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
76
Define pre-control and explain under what conditions pre-control can be used.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
77
Because of high test costs,a sample of single wastewater sludge is tested daily for dissolved oxygen content.The appropriate control chart is:

A) <strong>Because of high test costs,a sample of single wastewater sludge is tested daily for dissolved oxygen content.The appropriate control chart is:</strong> A)   -chart and R-chart. B)u-chart. C)x-chart and moving range chart. D)x-chart and R-chart. -chart and R-chart.
B)u-chart.
C)x-chart and moving range chart.
D)x-chart and R-chart.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
78
c-charts are based on the _____ probability distribution.

A)normal
B)binomial
C)Poisson
D)exponential
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
79
The control chart most appropriate for plotting the daily percentage of students that wait longer than 5 minutes in line at the undergraduate admissions office is a(n):

A)p-chart.
B)np-chart.
C)x-chart.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
80
For statistical process control,a good sampling method should always:

A)use samples of random measurements over a long period of time.
B)minimize sampling cost.
C)maximize sample size.
D)use rational subgroups.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 105 flashcards in this deck.