Exam 8: Measuring and Controlling Quality
Exam 1: Introduction to Quality80 Questions
Exam 2: Foundations of Quality Management80 Questions
Exam 3: Customer Focus80 Questions
Exam 4: Workforce Focus80 Questions
Exam 5: Process Focus79 Questions
Exam 6: Statistical Methods in Quality Management94 Questions
Exam 7: Design for Quality and Product Excellence80 Questions
Exam 8: Measuring and Controlling Quality105 Questions
Exam 9: Process Improvement and Six Sigma80 Questions
Exam 10: The Baldrige Framework for Performance Excellence80 Questions
Exam 11: Strategy and Performance Excellence78 Questions
Exam 12: Measurement and Knowledge Management for Performance Excellence80 Questions
Exam 13: Leadership for Performance Excellence80 Questions
Exam 14: Building and Sustaining Quality and Performance Excellence77 Questions
Select questions type
A _____ monitors the fraction of nonconforming units.
Free
(Multiple Choice)
4.8/5
(37)
Correct Answer:
D
In an attempt to solve the problem of tacked syringes,statistical consultants recommended _____ for the purpose of improving the tacking operation.
Free
(Multiple Choice)
4.8/5
(28)
Correct Answer:
D
Discuss the problem associated with the tacked syringes at the final production step.
Free
(Essay)
4.7/5
(39)
Correct Answer:
A containment cap that is "tacked" at a shorter than desired length leads to pressure on the cartridge stopper and,hence,partial or complete activation of the syringe.Such syringes must then be scrapped.If the cap is "tacked" at a longer than desired length,the tacking is incomplete or inadequate,which can lead to cap loss and potentially a cartridge loss in shipment and handling.Such syringes can be reworked manually to attach the cap at a lower position.However,this process requires a 100 percent inspection of the tacked syringes and results in increased cost for the items.This final production step seemed to be producing more and more scrap and reworked syringes over successive weeks.
For variable data,the two important quality measures are the proportion nonconforming and nonconformances per unit.
(True/False)
4.9/5
(39)
Which of the following is a likely cause of the control chart pattern known as a "trend"?
(Multiple Choice)
4.9/5
(39)
Rolled throughput yield is the proportion of conforming units that results from a series of process steps.
(True/False)
4.8/5
(35)
Which of the following is NOT one of the basic applications of a control chart?
(Multiple Choice)
4.9/5
(39)
Pre-control should only be used when process capability is no greater than 88 percent of the tolerance.
(True/False)
4.9/5
(35)
A preliminary analysis involving data entry at the distributor revealed that packing slips contained errors; to remedy this problem a _____ was constructed for each day to track the number of defects found.
(Multiple Choice)
4.8/5
(35)
What were the upper and lower specification limits desired for the syringe assembly process?
(Short Answer)
4.9/5
(31)
If most of the points on a control chart fluctuate randomly between the control limits with no recognizable pattern,then the process is in statistical control.
(True/False)
4.9/5
(35)
Control limits for the s-chart are given by: LCLs = B3s and UCLs = B4s,where B3 and B4 are constants.
(True/False)
4.9/5
(29)
When constructing a u-chart,the standard deviation of each sample varies because the size of the sampling unit varies.
(True/False)
4.9/5
(42)
Coils of synthetic rope are monitored for defects.Each coil contains 1,200 feet of rope.26 coils were selected and the number of defects found in each coil is presented below.Identify an appropriate control chart and determine the chart's control limits.


(Essay)
4.9/5
(30)
Operators at the final stage of the syringe assembly process chose 35 consecutive observations for a capability study and arrived at an estimated minimum process capability index of:
(Multiple Choice)
4.9/5
(32)
A _____ is the result of some cause that gradually affects the quality characteristics of the product and causes the points on a control chart to gradually move up or down from the center line.
(Multiple Choice)
4.9/5
(36)
Collecting _____ data is usually easier than collecting _____ data because the assessment can usually be done more quickly by a simple inspection or count.
(Multiple Choice)
4.9/5
(29)
A nonconforming unit of work is one that has no defects or errors.
(True/False)
4.7/5
(34)
Showing 1 - 20 of 105
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)