Deck 29: Preventive Maintenance developing and Implementing
1
While working on a PM crew, it is easy to hurry and cut corners due to time constraints.
True
2
Only one lockout/tagout is required per machine during PM.
False
3
When should the PM duties for a given machine be planned?
A) Just before the PM starts
B) Right after the machine is shut down for the PM
C) Before the machine is ever shut down
D) Whenever the plant manager gives approval
A) Just before the PM starts
B) Right after the machine is shut down for the PM
C) Before the machine is ever shut down
D) Whenever the plant manager gives approval
C
4
Who should remove a lockout if the person who put the lockout on is not present?
A) The plant engineer
C) The leadperson
B) The safety officer
D) No one
A) The plant engineer
C) The leadperson
B) The safety officer
D) No one
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
5
When the PM crew arrives at the machine, what is the first thing that needs to be done?
A) Close the lockbox
C) Set up the toolboxes.
B) Clean the surrounding area.
D) Lock out all energy sources.
A) Close the lockbox
C) Set up the toolboxes.
B) Clean the surrounding area.
D) Lock out all energy sources.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
6
Which is a part of the OSHA definition of a confined space?
A) is too small to enter
B) may cause claustrophobia
C) has limited or restricted means for entry or exit
D) has nothing to do with preventative maintenance
A) is too small to enter
B) may cause claustrophobia
C) has limited or restricted means for entry or exit
D) has nothing to do with preventative maintenance
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
7
It is important that another person remains at the entry point of the confined space in the event that an individual must be pulled out because of losing consciousness while in the confined space.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
8
It is the responsibility of the leadperson to ensure that everyone is wearing the proper PPE at all times
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
9
Where can the history of a machine be reviewed?
A) downtime sheet
C) maintenance log
B) operator roster
D) turnstile
A) downtime sheet
C) maintenance log
B) operator roster
D) turnstile
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
10
A(n) ____________________ should be designated in the presence of those who will be working on the machine at the time of PM.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
11
Once the PM has been totally completed, the ____________________ should be retrieved from the plant engineer's office or the safety coordinator's office and brought to the machine.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
12
The ____ of a machine is very important when referring to preventative maintenance.
A) history
C) age
B) type
D) operators
A) history
C) age
B) type
D) operators
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
13
On completion of the machine survey, a list needs to be made of the things that should be ____________________ and replaced during the PM shutdown.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
14
The first thing that a PM coordinator must do is to talk to all machine operators before the machine is shut down.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
15
While the PM coordinator is surveying the machine, it is a good idea for him or her to ____.
A) rope off the machine
B) talk to the operator(s)
C) inspect only the crucial parts of the machine
D) inform the plant engineer
A) rope off the machine
B) talk to the operator(s)
C) inspect only the crucial parts of the machine
D) inform the plant engineer