Exam 29: Preventive Maintenance developing and Implementing

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A(n) ____________________ should be designated in the presence of those who will be working on the machine at the time of PM.

Free
(Short Answer)
4.7/5
(36)
Correct Answer:
Verified

leadperson

On completion of the machine survey, a list needs to be made of the things that should be ____________________ and replaced during the PM shutdown.

Free
(Short Answer)
4.9/5
(28)
Correct Answer:
Verified

inspected

While the PM coordinator is surveying the machine, it is a good idea for him or her to ____.

Free
(Multiple Choice)
4.8/5
(30)
Correct Answer:
Verified

B

When should the PM duties for a given machine be planned?

(Multiple Choice)
4.8/5
(35)

It is important that another person remains at the entry point of the confined space in the event that an individual must be pulled out because of losing consciousness while in the confined space.

(True/False)
4.8/5
(36)

Only one lockout/tagout is required per machine during PM.

(True/False)
4.8/5
(39)

Once the PM has been totally completed, the ____________________ should be retrieved from the plant engineer's office or the safety coordinator's office and brought to the machine.

(Short Answer)
4.8/5
(35)

The ____ of a machine is very important when referring to preventative maintenance.

(Multiple Choice)
4.9/5
(34)

Who should remove a lockout if the person who put the lockout on is not present?

(Multiple Choice)
4.7/5
(26)

Which is a part of the OSHA definition of a confined space?

(Multiple Choice)
4.8/5
(33)

While working on a PM crew, it is easy to hurry and cut corners due to time constraints.

(True/False)
4.7/5
(36)

Where can the history of a machine be reviewed?

(Multiple Choice)
4.7/5
(47)

It is the responsibility of the leadperson to ensure that everyone is wearing the proper PPE at all times

(True/False)
5.0/5
(32)

The first thing that a PM coordinator must do is to talk to all machine operators before the machine is shut down.

(True/False)
4.9/5
(34)

When the PM crew arrives at the machine, what is the first thing that needs to be done?

(Multiple Choice)
4.7/5
(38)
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)