Exam 29: Preventive Maintenance developing and Implementing
Exam 1: Safety15 Questions
Exam 2: Tools14 Questions
Exam 3: Fasteners15 Questions
Exam 4: Industrial Print Reading15 Questions
Exam 5: Rigging and Mechanical Installations15 Questions
Exam 6: Mechanical Power Transmission16 Questions
Exam 7: Bearings18 Questions
Exam 8: Coupled Shaft Alignment15 Questions
Exam 9: Lubrication15 Questions
Exam 10: Seals and Packing16 Questions
Exam 11: Pumps and Compressors16 Questions
Exam 12: Fluid Power15 Questions
Exam 13: Piping Systems15 Questions
Exam 14: Electrical Fundamentals12 Questions
Exam 15: Test Equipment15 Questions
Exam 16: Basic Resistive Electrical Circuits14 Questions
Exam 17: Reactive Circuits and Power Factor15 Questions
Exam 18: Wiring Methods15 Questions
Exam 19: Transformers15 Questions
Exam 20: Electrical Machinery15 Questions
Exam 21: Control and Controlled Devices18 Questions
Exam 22: Motor Control Circuits15 Questions
Exam 23: Basic Industrial Electronics16 Questions
Exam 24: Electronic Variable Speed Drives15 Questions
Exam 25: Programmable Logic Controllers15 Questions
Exam 26: Lighting15 Questions
Exam 27: Gas Welding15 Questions
Exam 28: ARC Welding15 Questions
Exam 29: Preventive Maintenance developing and Implementing15 Questions
Exam 30: Mechanical PM15 Questions
Exam 31: Electrical PM14 Questions
Select questions type
A(n) ____________________ should be designated in the presence of those who will be working on the machine at the time of PM.
Free
(Short Answer)
4.7/5
(36)
Correct Answer:
leadperson
On completion of the machine survey, a list needs to be made of the things that should be ____________________ and replaced during the PM shutdown.
Free
(Short Answer)
4.9/5
(28)
Correct Answer:
inspected
While the PM coordinator is surveying the machine, it is a good idea for him or her to ____.
Free
(Multiple Choice)
4.8/5
(30)
Correct Answer:
B
It is important that another person remains at the entry point of the confined space in the event that an individual must be pulled out because of losing consciousness while in the confined space.
(True/False)
4.8/5
(36)
Once the PM has been totally completed, the ____________________ should be retrieved from the plant engineer's office or the safety coordinator's office and brought to the machine.
(Short Answer)
4.8/5
(35)
The ____ of a machine is very important when referring to preventative maintenance.
(Multiple Choice)
4.9/5
(34)
Who should remove a lockout if the person who put the lockout on is not present?
(Multiple Choice)
4.7/5
(26)
Which is a part of the OSHA definition of a confined space?
(Multiple Choice)
4.8/5
(33)
While working on a PM crew, it is easy to hurry and cut corners due to time constraints.
(True/False)
4.7/5
(36)
It is the responsibility of the leadperson to ensure that everyone is wearing the proper PPE at all times
(True/False)
5.0/5
(32)
The first thing that a PM coordinator must do is to talk to all machine operators before the machine is shut down.
(True/False)
4.9/5
(34)
When the PM crew arrives at the machine, what is the first thing that needs to be done?
(Multiple Choice)
4.7/5
(38)
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)