The duty cycle is the amount of time that a specific electrical load operates.
Use Space or
up arrow
down arrow
to flip the card.
Question
Sizing the wire from the inverter to the AC loadcenter in a grid-tie PV system is sized the same way as sizing the wire run from a(n) ___________________ to an AC loadcenter in a stand-alone PV system.
Question
In a standard charge controller, all of the system components have the same voltage.
Question
Explain how output power rating is used to determine the number of inverters needed in a grid-tie PV system.
Question
Load ____________________ is the process of changing large electrical loads in a building to another form of power such as natural gas or propane.
Question
Explain the Energy Star label, where it originated, and what it means.
Question
Sizing a(n) ____________________ PV system is simpler than sizing a stand-alone PV system primarily because there are not as many system components to determine.
Question
Where do you start when sizing a PV system?
Question
What is the overall process for determining inverter size for a stand-alone PV system?
Question
The use of an MPPT and/or step down charge controller in a stand-alone PV system requires the array to be sized a little differently than when using a(n) ____________________ charge controller.
Question
For the lowest temperature termination rating, assume that all terminations are rated ___________________°C unless you know for sure that there are 60°C or 90°C terminations in the circuit.
Question
Why should a grid-tie PV system not be sized larger than needed for the building's average annual electrical load?
Question
The ____________________ electric energy usage can be found on a building's electric utility bill, or the building owner can contact the local electric utility.
Question
A(n) ____________________ PV system needs to be sized so that it can supply the total electrical load of the building it serves.
Question
The rule of thumb often used to calculate the surge load is to simply multiply the required watts of a load by ____________________.
Question
A phantom load is a load type that draws a large amount of current, even when the load is "OFF".
Question
If the building's loads change significantly over the course of a year, it is acceptable to use the month with lowest insolation as the design month.
Question
What is the one major difference between a bimodal PV system and a stand-alone PV system?
Question
A common assumption in most stand-alone PV system installations is that the wiring from module to module and from the array modules to the combiner box is the same size as the wire leads that were installed on the PV modules by the manufacturer.
Question
The system loss ___________________ factor takes into account the types of losses that occur when converting the PV array produced DC electricity to AC electricity.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 10: Sizing Pv Systems
1
The duty cycle is the amount of time that a specific electrical load operates.
True
2
Sizing the wire from the inverter to the AC loadcenter in a grid-tie PV system is sized the same way as sizing the wire run from a(n) ___________________ to an AC loadcenter in a stand-alone PV system.
inverter
3
In a standard charge controller, all of the system components have the same voltage.
True
4
Explain how output power rating is used to determine the number of inverters needed in a grid-tie PV system.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
5
Load ____________________ is the process of changing large electrical loads in a building to another form of power such as natural gas or propane.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
6
Explain the Energy Star label, where it originated, and what it means.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
7
Sizing a(n) ____________________ PV system is simpler than sizing a stand-alone PV system primarily because there are not as many system components to determine.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
8
Where do you start when sizing a PV system?
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
9
What is the overall process for determining inverter size for a stand-alone PV system?
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
10
The use of an MPPT and/or step down charge controller in a stand-alone PV system requires the array to be sized a little differently than when using a(n) ____________________ charge controller.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
11
For the lowest temperature termination rating, assume that all terminations are rated ___________________°C unless you know for sure that there are 60°C or 90°C terminations in the circuit.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
12
Why should a grid-tie PV system not be sized larger than needed for the building's average annual electrical load?
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
13
The ____________________ electric energy usage can be found on a building's electric utility bill, or the building owner can contact the local electric utility.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
14
A(n) ____________________ PV system needs to be sized so that it can supply the total electrical load of the building it serves.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
15
The rule of thumb often used to calculate the surge load is to simply multiply the required watts of a load by ____________________.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
16
A phantom load is a load type that draws a large amount of current, even when the load is "OFF".
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
17
If the building's loads change significantly over the course of a year, it is acceptable to use the month with lowest insolation as the design month.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
18
What is the one major difference between a bimodal PV system and a stand-alone PV system?
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
19
A common assumption in most stand-alone PV system installations is that the wiring from module to module and from the array modules to the combiner box is the same size as the wire leads that were installed on the PV modules by the manufacturer.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
20
The system loss ___________________ factor takes into account the types of losses that occur when converting the PV array produced DC electricity to AC electricity.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 20 flashcards in this deck.