A maintenance ____________________ is a list of maintenance tasks and their suggested time interval.
program
2
What is the first task when performing the initial system startup?
When performing the initial system startup, the array voltage should be checked first with a good quality multimeter.
3
What can be used to clean PV modules?
Water and mild detergent can be used to clean PV modules.
4
What should you record once it has been determined that the PV system is working properly, and why?
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
5
A check needs to be performed of all junction boxes, conduit bodies, and disconnect switches to make sure they are ____________________ and suitable for outside installations.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
6
____________________ is a systematic investigation of possible causes for a system problem resulting in a determination of how best to fix the problem.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
7
What are the three most common PV system failures?
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
8
Stand-alone PV systems will require less maintenance than grid-tie systems.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
9
The electrical inspector will make sure that the building codes adopted by the local government are being followed.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
10
____________________ maintenance should involve checking all mechanical and electrical connections, checking all source circuit currents and voltages, checking battery electrolyte if the batteries are not sealed, and checking the programming of charge controllers and/or inverters.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
11
The organization, office, or individual designated by the local government with legal powers to administer, interpret, and enforce building codes is called the _____________________.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
12
How often should you inspect the intake air duct and cooling fan of an inverter for accumulation of dirt and debris?
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
13
When troubleshooting a PV array, if no problem is found at the array or inverter you'll need to check the building's electrical ____________________.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
14
The last item to check when performing the final check is signage.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
15
Commissioning is the initial start-up and operation of a PV system.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
16
How does the final systems check begin?
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
17
When will representatives of the Authority Having Jurisdiction (AHJ) inspect the PV system?
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
18
When troubleshooting an array, first ____________________ check the entire system for any obvious damage.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
19
A(n) ____________________ is used to check the specific gravity of the electrolyte in battery cells.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
20
Conductor insulation on PV systems should be rated for wet locations.