Exam 12: Maintaining and Troubleshooting a Pv System
Exam 1: Introduction to Photovoltaics20 Questions
Exam 2: Photovoltaic System Installation Safety19 Questions
Exam 3: Understanding Electricity Basics20 Questions
Exam 4: Solar Fundamentals20 Questions
Exam 5: Pv Modules20 Questions
Exam 6: Batteries20 Questions
Exam 7: Charge Controllers20 Questions
Exam 8: Inverters20 Questions
Exam 9: Pv System Wiring and the Nec19 Questions
Exam 10: Sizing Pv Systems20 Questions
Exam 11: Installing Pv Systems20 Questions
Exam 12: Maintaining and Troubleshooting a Pv System20 Questions
Select questions type
What is the first task when performing the initial system startup?
Free
(Essay)
4.7/5
(33)
Correct Answer:
When performing the initial system startup, the array voltage should be checked first with a good quality multimeter.
A check needs to be performed of all junction boxes, conduit bodies, and disconnect switches to make sure they are ____________________ and suitable for outside installations.
Free
(Short Answer)
4.7/5
(40)
Correct Answer:
accessible
How often should you inspect the intake air duct and cooling fan of an inverter for accumulation of dirt and debris?
Free
(Essay)
4.9/5
(35)
Correct Answer:
You should inspect the intake air duct and cooling fan each month, or more often as needed.
The electrical inspector will make sure that the building codes adopted by the local government are being followed.
(True/False)
4.8/5
(39)
The organization, office, or individual designated by the local government with legal powers to administer, interpret, and enforce building codes is called the _____________________.
(Essay)
4.7/5
(26)
When troubleshooting a PV array, if no problem is found at the array or inverter you'll need to check the building's electrical ____________________.
(Short Answer)
4.8/5
(38)
Conductor insulation on PV systems should be rated for wet locations.
(True/False)
4.7/5
(41)
When will representatives of the Authority Having Jurisdiction (AHJ) inspect the PV system?
(Essay)
4.9/5
(44)
____________________ is a systematic investigation of possible causes for a system problem resulting in a determination of how best to fix the problem.
(Short Answer)
4.7/5
(43)
____________________ maintenance should involve checking all mechanical and electrical connections, checking all source circuit currents and voltages, checking battery electrolyte if the batteries are not sealed, and checking the programming of charge controllers and/or inverters.
(Short Answer)
4.9/5
(28)
The last item to check when performing the final check is signage.
(True/False)
4.8/5
(33)
Commissioning is the initial start-up and operation of a PV system.
(True/False)
4.8/5
(32)
Stand-alone PV systems will require less maintenance than grid-tie systems.
(True/False)
4.8/5
(32)
When troubleshooting an array, first ____________________ check the entire system for any obvious damage.
(Short Answer)
4.8/5
(41)
What should you record once it has been determined that the PV system is working properly, and why?
(Essay)
4.7/5
(37)
A(n) ____________________ is used to check the specific gravity of the electrolyte in battery cells.
(Short Answer)
5.0/5
(28)
A maintenance ____________________ is a list of maintenance tasks and their suggested time interval.
(Short Answer)
4.7/5
(25)
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)