Deck 14: Drainage Insulation and Concrete-Slabs

Full screen (f)
exit full mode
Question
At one time, clay drain tile was the most common type of pipe for drainage.
Use Space or
up arrow
down arrow
to flip the card.
Question
The ____ (vertical part through the floor) and drain basin are usually set at the proper elevation just prior to placing the concrete floor.

A) riser
B) pole
C) climber
D) elevation
Question
____ pipe is used in most new construction.

A) Clay
B) Plastic
C) Concrete
D) Metal
Question
The thickness of polyethylene sheeting is measured in ____.

A) centimeters
B) millimeters
C) inches
D) mils
Question
For vapor barriers, ____-mil polyethylene is generally used.

A) 5
B) 6
C) 8
D) 10
Question
The weight and rigidity of the floor on the foundation wall helps the wall to resist the pressure of the backfill.
Question
One mil equals 1/____ of an inch.

A) 10
B) 100
C) 1 , 000
D) 10 , 000
Question
Ground water is kept away from the foundation by proper grading of the site, careful damp-proofing, and providing a path for groundwater to escape without penetrating the foundation.
Question
<strong>  The central symbol in the accompanying figure signifies a ____.</strong> A) plastic pipe B) footing diameter C) vapor barrier D) floor drain <div style=padding-top: 35px> The central symbol in the accompanying figure signifies a ____.

A) plastic pipe
B) footing diameter
C) vapor barrier
D) floor drain
Question
A ____ vapor barrier is laid over the gravel underfill.

A) polypropylene
B) polyethylene
C) polyester
D) PVC
Question
Footing drains are usually perforated ____ pipe placed around the footings in a bed of crushed stone.

A) concrete
B) plastic
C) aluminum
D) steel
Question
One technique often used to prevent groundwater from seeping through the foundation is coating the foundation wall with ____ foundation coating.

A) asphalt
B) metal foil
C) fabric
D) nylon
Question
In cold climates, it is desirable to leave the foundation and concrete slab uninsulated.
Question
Underground utility systems do not have to be coordinated prior to starting installation.
Question
When floor drains are included or where water must be allowed to run off, the slab is ____ (sloped slightly).

A) compressible
B) planed
C) pitched
D) malleable
Question
When floor drains or forms are set for pitched floors, it is necessary to find the total pitch of the slab.
Question
____ means filled with earth to the finished grade line.

A) Fulfilled
B) Excavated
C) Backfilled
D) Footed
Question
Expansion joints can be made from any ____ material such as neoprene.

A) incompressible
B) compressible
C) brittle
D) ductile
Question
Plastic drain pipe is manufactured in ____-foot lengths of rigid pipe.

A) 10
B) 50
C) 100
D) 250
Question
In areas where there is no natural drainage, the footing drain is run ____.

A) to a dry well
B) by gravity
C) away from a municipal storm drain
D) toward the building
Question
Neoprene or composition sheathing material is an example of __________.

A) plastic foam material
B) compressible material
C) non-insulating material
D) penetrating material
Question
<strong>  Identify the material used to make these pipes.</strong> A) Aluminum B) Steel C) Plastic D) Rubber <div style=padding-top: 35px> Identify the material used to make these pipes.

A) Aluminum
B) Steel
C) Plastic
D) Rubber
Question
A(n) ____ is a mass of dense material that absorbs the energy of the sun during the day and radiates it at night.

A) energy drain
B) sun sink
C) heat collector
D) heat sink
Question
If the note on a concrete apron in front of a garage door indicates a pitch of 1/2 inch per foot and the apron is 4 feet wide, the total pitch is ____ inch(es).

A) 1/2
B) 1
C) 2
D) 4
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/24
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 14: Drainage Insulation and Concrete-Slabs
1
At one time, clay drain tile was the most common type of pipe for drainage.
True
2
The ____ (vertical part through the floor) and drain basin are usually set at the proper elevation just prior to placing the concrete floor.

A) riser
B) pole
C) climber
D) elevation
A
3
____ pipe is used in most new construction.

A) Clay
B) Plastic
C) Concrete
D) Metal
B
4
The thickness of polyethylene sheeting is measured in ____.

A) centimeters
B) millimeters
C) inches
D) mils
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
5
For vapor barriers, ____-mil polyethylene is generally used.

A) 5
B) 6
C) 8
D) 10
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
6
The weight and rigidity of the floor on the foundation wall helps the wall to resist the pressure of the backfill.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
7
One mil equals 1/____ of an inch.

A) 10
B) 100
C) 1 , 000
D) 10 , 000
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
8
Ground water is kept away from the foundation by proper grading of the site, careful damp-proofing, and providing a path for groundwater to escape without penetrating the foundation.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
9
<strong>  The central symbol in the accompanying figure signifies a ____.</strong> A) plastic pipe B) footing diameter C) vapor barrier D) floor drain The central symbol in the accompanying figure signifies a ____.

A) plastic pipe
B) footing diameter
C) vapor barrier
D) floor drain
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
10
A ____ vapor barrier is laid over the gravel underfill.

A) polypropylene
B) polyethylene
C) polyester
D) PVC
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
11
Footing drains are usually perforated ____ pipe placed around the footings in a bed of crushed stone.

A) concrete
B) plastic
C) aluminum
D) steel
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
12
One technique often used to prevent groundwater from seeping through the foundation is coating the foundation wall with ____ foundation coating.

A) asphalt
B) metal foil
C) fabric
D) nylon
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
13
In cold climates, it is desirable to leave the foundation and concrete slab uninsulated.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
14
Underground utility systems do not have to be coordinated prior to starting installation.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
15
When floor drains are included or where water must be allowed to run off, the slab is ____ (sloped slightly).

A) compressible
B) planed
C) pitched
D) malleable
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
16
When floor drains or forms are set for pitched floors, it is necessary to find the total pitch of the slab.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
17
____ means filled with earth to the finished grade line.

A) Fulfilled
B) Excavated
C) Backfilled
D) Footed
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
18
Expansion joints can be made from any ____ material such as neoprene.

A) incompressible
B) compressible
C) brittle
D) ductile
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
19
Plastic drain pipe is manufactured in ____-foot lengths of rigid pipe.

A) 10
B) 50
C) 100
D) 250
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
20
In areas where there is no natural drainage, the footing drain is run ____.

A) to a dry well
B) by gravity
C) away from a municipal storm drain
D) toward the building
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
21
Neoprene or composition sheathing material is an example of __________.

A) plastic foam material
B) compressible material
C) non-insulating material
D) penetrating material
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
22
<strong>  Identify the material used to make these pipes.</strong> A) Aluminum B) Steel C) Plastic D) Rubber Identify the material used to make these pipes.

A) Aluminum
B) Steel
C) Plastic
D) Rubber
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
23
A(n) ____ is a mass of dense material that absorbs the energy of the sun during the day and radiates it at night.

A) energy drain
B) sun sink
C) heat collector
D) heat sink
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
24
If the note on a concrete apron in front of a garage door indicates a pitch of 1/2 inch per foot and the apron is 4 feet wide, the total pitch is ____ inch(es).

A) 1/2
B) 1
C) 2
D) 4
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 24 flashcards in this deck.