Exam 14: Drainage Insulation and Concrete-Slabs
Exam 1: The Design-Construction Sequence and the Design Professions30 Questions
Exam 2: Views30 Questions
Exam 3: Scales22 Questions
Exam 4: Alphabet of Lines28 Questions
Exam 5: Use of Symbols28 Questions
Exam 6: Plan Views28 Questions
Exam 7: Elevations25 Questions
Exam 8: Sections and Detail24 Questions
Exam 9: Clearing and Rough Grading the Site30 Questions
Exam 10: Locating the Building25 Questions
Exam 11: Site Utilities29 Questions
Exam 12: Footings27 Questions
Exam 13: Foundation Walls28 Questions
Exam 14: Drainage Insulation and Concrete-Slabs24 Questions
Exam 15: Framing Systems26 Questions
Exam 16: Columns, Piers, and Girders18 Questions
Exam 17: Floor Framing27 Questions
Exam 18: Laying Out Walls and Partitions21 Questions
Exam 19: Framing Openings in Walls23 Questions
Exam 20: Roof Construction Terms28 Questions
Exam 21: Roof Trusses21 Questions
Exam 22: Common Rafters27 Questions
Exam 23: Hip and Valley Framing27 Questions
Exam 24: Cornices30 Questions
Exam 25: Windows and Doors31 Questions
Exam 26: Exterior Wall Coverings27 Questions
Exam 27: Decks22 Questions
Exam 28: Finishing Site Work27 Questions
Exam 29: Fireplaces28 Questions
Exam 30: Stairs28 Questions
Exam 31: Insulation and Room Finishing28 Questions
Exam 32: Cabinets21 Questions
Exam 33: Lake House Specifications26 Questions
Exam 34: Orienting the Drawings26 Questions
Exam 35: Fire Rated and Acoustical Considerations24 Questions
Exam 36: Seismic Considerations32 Questions
Exam 37: Heavy Commercial Construction30 Questions
Exam 38: Coordination of Drawings25 Questions
Exam 39: Structural Drawings30 Questions
Exam 40: HVAC Plumbing Drawings28 Questions
Exam 41: Electrical Drawings30 Questions
Select questions type
A ____ vapor barrier is laid over the gravel underfill.
Free
(Multiple Choice)
4.9/5
(35)
Correct Answer:
B
Ground water is kept away from the foundation by proper grading of the site, careful damp-proofing, and providing a path for groundwater to escape without penetrating the foundation.
Free
(True/False)
4.8/5
(41)
Correct Answer:
True
In cold climates, it is desirable to leave the foundation and concrete slab uninsulated.
Free
(True/False)
4.9/5
(31)
Correct Answer:
False
When floor drains are included or where water must be allowed to run off, the slab is ____ (sloped slightly).
(Multiple Choice)
4.8/5
(33)
In areas where there is no natural drainage, the footing drain is run ____.
(Multiple Choice)
5.0/5
(36)
Plastic drain pipe is manufactured in ____-foot lengths of rigid pipe.
(Multiple Choice)
4.9/5
(34)
One technique often used to prevent groundwater from seeping through the foundation is coating the foundation wall with ____ foundation coating.
(Multiple Choice)
4.8/5
(24)
Neoprene or composition sheathing material is an example of __________.
(Multiple Choice)
4.8/5
(29)
When floor drains or forms are set for pitched floors, it is necessary to find the total pitch of the slab.
(True/False)
4.9/5
(39)
For vapor barriers, ____-mil polyethylene is generally used.
(Multiple Choice)
4.8/5
(40)
The weight and rigidity of the floor on the foundation wall helps the wall to resist the pressure of the backfill.
(True/False)
4.8/5
(36)
A(n) ____ is a mass of dense material that absorbs the energy of the sun during the day and radiates it at night.
(Multiple Choice)
4.8/5
(28)
If the note on a concrete apron in front of a garage door indicates a pitch of 1/2 inch per foot and the apron is 4 feet wide, the total pitch is ____ inch(es).
(Multiple Choice)
4.7/5
(33)
The central symbol in the accompanying figure signifies a ____.

(Multiple Choice)
4.8/5
(40)
At one time, clay drain tile was the most common type of pipe for drainage.
(True/False)
4.9/5
(36)
The thickness of polyethylene sheeting is measured in ____.
(Multiple Choice)
4.8/5
(36)
Showing 1 - 20 of 24
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)