Deck 15: Closing the Bid
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/20
Play
Full screen (f)
Deck 15: Closing the Bid
1
A bid may sometimes be called a(n)"____" or a "proposal."
A)offer
B)delivery
C)tender
D)contract
A)offer
B)delivery
C)tender
D)contract
C
2
Most contractors use a ____ sheet to gather together all of the constituent prices of the estimate.
A)quote
B)bid summary
C)job summary
D)tender summary
A)quote
B)bid summary
C)job summary
D)tender summary
B
3
A construction contract bid is compiled in three stages: the advance stage, the review stage, and the ____ stage.
A)finish
B)clarification
C)completion
D)closing
A)finish
B)clarification
C)completion
D)closing
D
4
In the bid markup, profit is generally assessed as a compensation for the risk taken by the contractor.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
5
The first step in the cost control process is assembling cost data for use in estimating future jobs.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
6
The recap format for the takeoff items of a unit- price bid is the same as the format used with a lump-sum bid.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
7
The last stage in the preparation of a unit-price bid is to ____.
A)propose the design
B)revise the bid
C)submit the bid
D)complete the bid form
A)propose the design
B)revise the bid
C)submit the bid
D)complete the bid form
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
8
Contractors seldom see an advantage in allowing a higher proportion of overheads and fee against the work being completed early in the project.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
9
Add-ons for small tools and payroll additives are calculated as a percentage of the total labor amount of the bid.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
10
____ are quoted for proposed changes in the specifications.
A)Alternative prices
B)Alternative uses
C)Floating prices
D)Dynamic prices
A)Alternative prices
B)Alternative uses
C)Floating prices
D)Dynamic prices
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
11
A construction bid contract is compiled in three stages which include all of the following EXCEPT the _____ stage.
A)preview
B)advance
C)review
D)closing
A)preview
B)advance
C)review
D)closing
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
12
The information on a ____ is generally requested to provide a basis for evaluating monthly progress payments on the project.
A)balance sheet
B)cost breakdown
C)system breakdown
D)cash analysis
A)balance sheet
B)cost breakdown
C)system breakdown
D)cash analysis
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
13
____ is defined as the amount of money remaining after all project expenses and company expenses have been paid.
A)Labor
B)Expense
C)Profit
D)Overage
A)Labor
B)Expense
C)Profit
D)Overage
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
14
The estimate-cost control process is linear in nature.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
15
A stipulated sum of money to be expended by a contractor on a specific work item on a project is usually referred to as a ____.
A)cash reserve
B)cash allowance
C)cash buffer
D)cash holding
A)cash reserve
B)cash allowance
C)cash buffer
D)cash holding
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
16
At the very start of the estimating process, the estimator can set up the summary sheet by checking off the trades that will be completed by "own forces" and those that will be subcontracted.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
17
Most contractors use a standard format of summary to capture all the main components of an estimate.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
18
Whereas lump-sum bids involve calculating a single final price and assembling a list of subtrades, with a unit-price bid, the contractor is also required to complete a "_______", that is, an itemized breakdown of the work of the project.
A)Bid Drawing
B)Estimate File
C)Pre-bid
D)Schedule of Prices
A)Bid Drawing
B)Estimate File
C)Pre-bid
D)Schedule of Prices
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
19
The bid markup has one main component: profit.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
20
The ____ function in a construction company will record all the expenses incurred in the operation of the entire company.
A)cost-accounting
B)cash-accounting
C)direct-accounting
D)arrears-accounting
A)cost-accounting
B)cash-accounting
C)direct-accounting
D)arrears-accounting
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck