Deck 17: Elemental Estimating

Full screen (f)
exit full mode
Question
Usually there is a trade off between items in the cost plan.
Use Space or
up arrow
down arrow
to flip the card.
Question
The objective of ____ analysis is to provide a consistent reference format for the evaluation, estimation, and tracking of construction costs throughout the life of a project-from feasibility through occupancy and use to eventual demolition.

A)assembly
B)piece
C)labor
D)elemental
Question
To better achieve the cost control required throughout the design phase of a project, the single price estimate needs to be broken down into its constituent parts.
Question
The basic unit of the UniFormat breakdown is the building element that is defined as a major component of most buildings that performs the same function in the building.
Question
The main uses of elemental analysis include all of the following EXCEPT ________.

A)to provide a method for tracking workplace liabilities
B)to provide a method for preparing budget estimates for a project
C)to evaluate function and cost
D)to provide a method of tracking and recording cost of information for future reference
Question
Ratios can help explain why one building is more expensive than another.
Question
Elemental analysis furnishes less useful information than the one budget price that results from a single-rate estimate.
Question
The ____ is obtained by dividing the quantity of the element by the gross floor area of the project.

A)ratio to GFA
B)ratio to GSF
C)ratio to SFA
D)ratio to NFA
Question
Three contingencies are usually applied to an elemental estimate at the conceptual stage. They include all of the following EXCEPT __________.

A)a design contingency
B)an escalation contingency
C)a construction contingency
D)a disaster contingency
Question
An elemental cost analysis of a finished project can be likened to an estimate in reverse.
Question
In order to obtain a realistic assessment of the cost of construction, a ____ estimate should be used.

A)multi-rate
B)single-rate
C)piece-rate
D)volume
Question
When a developer first considers the idea of a project, he may quickly calculate the anticipated cost of the work using a ____ estimate.

A)piece-rate
B)multi-rate
C)single-rate
D)volume
Question
When using an elemental analysis as an estimating tool, the ratio can be used to check for design errors.
Question
The ____ contingency is an amount that is added to the cost estimate which reflects the price increases that are anticipated over the time between the date of the analysis being used and the time when the new project is constructed.

A)overage
B)escalation
C)satisfaction
D)appreciation
Question
Very little information is required about a new project to prepare an estimate using ____ analysis.

A)assembly
B)elemental
C)labor
D)unit
Question
A trade breakdown is not detailed enough for the preliminary type of estimate prepared at the conception stage of a project.
Question
An element represents a component that always performs the same function in a building.
Question
The ____ is the cost of the element divided by its quantity.

A)piece rate
B)single-rate
C)variable rate
D)unit rate
Question
The ____ UniFormat is a function-based elemental breakdown that provides what is needed for an elemental estimating system.

A)CSS/CSC
B)CSI/CSC
C)CSC/SSC
D)CSI/SSC
Question
All that is required to prepare a quick and accurate elemental estimate is the basic size and shape of the building and its use and location, as well as historical cost data of similar buildings constructed at the same general location.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 17: Elemental Estimating
1
Usually there is a trade off between items in the cost plan.
True
2
The objective of ____ analysis is to provide a consistent reference format for the evaluation, estimation, and tracking of construction costs throughout the life of a project-from feasibility through occupancy and use to eventual demolition.

A)assembly
B)piece
C)labor
D)elemental
D
3
To better achieve the cost control required throughout the design phase of a project, the single price estimate needs to be broken down into its constituent parts.
True
4
The basic unit of the UniFormat breakdown is the building element that is defined as a major component of most buildings that performs the same function in the building.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
5
The main uses of elemental analysis include all of the following EXCEPT ________.

A)to provide a method for tracking workplace liabilities
B)to provide a method for preparing budget estimates for a project
C)to evaluate function and cost
D)to provide a method of tracking and recording cost of information for future reference
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
6
Ratios can help explain why one building is more expensive than another.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
7
Elemental analysis furnishes less useful information than the one budget price that results from a single-rate estimate.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
8
The ____ is obtained by dividing the quantity of the element by the gross floor area of the project.

A)ratio to GFA
B)ratio to GSF
C)ratio to SFA
D)ratio to NFA
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
9
Three contingencies are usually applied to an elemental estimate at the conceptual stage. They include all of the following EXCEPT __________.

A)a design contingency
B)an escalation contingency
C)a construction contingency
D)a disaster contingency
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
10
An elemental cost analysis of a finished project can be likened to an estimate in reverse.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
11
In order to obtain a realistic assessment of the cost of construction, a ____ estimate should be used.

A)multi-rate
B)single-rate
C)piece-rate
D)volume
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
12
When a developer first considers the idea of a project, he may quickly calculate the anticipated cost of the work using a ____ estimate.

A)piece-rate
B)multi-rate
C)single-rate
D)volume
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
13
When using an elemental analysis as an estimating tool, the ratio can be used to check for design errors.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
14
The ____ contingency is an amount that is added to the cost estimate which reflects the price increases that are anticipated over the time between the date of the analysis being used and the time when the new project is constructed.

A)overage
B)escalation
C)satisfaction
D)appreciation
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
15
Very little information is required about a new project to prepare an estimate using ____ analysis.

A)assembly
B)elemental
C)labor
D)unit
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
16
A trade breakdown is not detailed enough for the preliminary type of estimate prepared at the conception stage of a project.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
17
An element represents a component that always performs the same function in a building.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
18
The ____ is the cost of the element divided by its quantity.

A)piece rate
B)single-rate
C)variable rate
D)unit rate
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
19
The ____ UniFormat is a function-based elemental breakdown that provides what is needed for an elemental estimating system.

A)CSS/CSC
B)CSI/CSC
C)CSC/SSC
D)CSI/SSC
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
20
All that is required to prepare a quick and accurate elemental estimate is the basic size and shape of the building and its use and location, as well as historical cost data of similar buildings constructed at the same general location.