1
Where a central tower crane is not in place on a site, using ______ to place concrete is usually the most economical alternative.
A)a hand-operated buggie
B)a conveyor
C)a powered buggie
D)pumps
A)a hand-operated buggie
B)a conveyor
C)a powered buggie
D)pumps
D
2
The most economical method of placing concrete is to _________.
A)use hand-operated buggies
B)use conveyors
C)discharge it into position directly from the truck
D)use a crane and bucket setup
A)use hand-operated buggies
B)use conveyors
C)discharge it into position directly from the truck
D)use a crane and bucket setup
C
3
The cost of supplying concrete to a site includes the cost of cement, sand, aggregate, water, and equipment to mix and transport the concrete.
True
4
The most time-consuming activity involved in setting up a form system is usually the placing and adjusting of ____.
A)form ties
B)form walls
C)rebar
D)form marks
A)form ties
B)form walls
C)rebar
D)form marks
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
5
Buggies require a small number of personnel to operate them in order to maintain reasonable production rates in terms of cubic yards placed per hour.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
6
Concrete cannot be placed using the crane and bucket setup.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
7
The "____" is the area of the form system that will be in contact with the concrete.
A)load area
B)contact area
C)support area
D)form area
A)load area
B)contact area
C)support area
D)form area
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
8
Most contractors tend to use the same screed system on all their jobs so the estimator may be able to obtain cost information from a previous job and use it to price the next job.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
9
The need for a multitude of calculations of form materials prices can be entirely avoided by using a(n)"____" for all form materials required on a project.
A)budget price
B)trade price
C)reference price
D)average price
A)budget price
B)trade price
C)reference price
D)average price
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
10
Reinforcing steel for concrete includes ____ and reinforcing bars.
A)welded wire mesh
B)wire
C)stranded wire mesh
D)welded wire coil
A)welded wire mesh
B)wire
C)stranded wire mesh
D)welded wire coil
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
11
Form hardware is often computed at a rate of between ____ of the total value of formwork material included in the estimate.
A)10% and 20%
B)10% and 30%
C)15% and 30%
D)20% and 30%
A)10% and 20%
B)10% and 30%
C)15% and 30%
D)20% and 30%
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
12
The factor that, perhaps, has the most influence on the cost of placing concrete is the method used to convey the concrete from the mixing trucks to its final location.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
13
____ for cast-in-place concrete may be constructed of lumber, plywood, aluminum, steel, and combinations of these materials.
A)Loadwork
B)Form standards
C)Formwork
D)Form loads
A)Loadwork
B)Form standards
C)Formwork
D)Form loads
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
14
____ additives to concrete are used to maintain a low water/cement ratio in a concrete mix for maximum strength.
A)Hardener
B)Elasticizer
C)Accelerator
D)Superplasticizer
A)Hardener
B)Elasticizer
C)Accelerator
D)Superplasticizer
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
15
The cost of materials used in a formwork system would include the rental or purchase cost of all the components involved in its construction, including form ties and other hardware items.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
16
Chutes over ____ feet long can be harmful to the concrete mix by causing segregation of concrete constituents.
A)4
B)6
C)8
D)10
A)4
B)6
C)8
D)10
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
17
An allowance for waste and spillage of concrete is added as a waste factor to concrete takeoff quantities.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
18
The use of concrete buggies has increased significantly in recent years.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
19
____ has randomly distributed fibers incorporated into the concrete mix with the object of improving the tensile strength of the concrete and increasing the concrete's ability to resist cracking and deformation.
A)GRC
B)FRC
C)DRC
D)TRC
A)GRC
B)FRC
C)DRC
D)TRC
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
20
The value of waste factors usually lies between 1% and ____% for concrete placed in formwork.
A)5
B)10
C)12
D)15
A)5
B)10
C)12
D)15
Unlock Deck
Unlock for access to all 20 flashcards in this deck.