Exam 11: Pricing Concrete Work
Exam 1: Introduction20 Questions
Exam 2: The Estimating Process and Preliminary Procedures20 Questions
Exam 3: Measuring Quantities Generally20 Questions
Exam 4: Measuring Sitework, Excavation and Piling20 Questions
Exam 5: Measuring Concrete Work20 Questions
Exam 6: Measuring Masonry Work20 Questions
Exam 7: Measuring Carpentry and Miscellaneous Items20 Questions
Exam 8: Pricing Generally20 Questions
Exam 9: Pricing Construction Equipment20 Questions
Exam 10: Pricing Excavation and Backfill20 Questions
Exam 11: Pricing Concrete Work20 Questions
Exam 12: Pricing Masonry, Carpentry and Finishes Work20 Questions
Exam 13: Pricing Subcontractors Work20 Questions
Exam 14: Pricing General Expenses20 Questions
Exam 15: Closing the Bid20 Questions
Exam 16: Budget Estimating20 Questions
Exam 17: Elemental Estimating20 Questions
Exam 18: Life-Cycle Costing20 Questions
Select questions type
The factor that, perhaps, has the most influence on the cost of placing concrete is the method used to convey the concrete from the mixing trucks to its final location.
Free
(True/False)
4.9/5
(30)
Correct Answer:
True
The most economical method of placing concrete is to _________.
Free
(Multiple Choice)
4.9/5
(27)
Correct Answer:
C
The cost of supplying concrete to a site includes the cost of cement, sand, aggregate, water, and equipment to mix and transport the concrete.
Free
(True/False)
4.8/5
(35)
Correct Answer:
True
Most contractors tend to use the same screed system on all their jobs so the estimator may be able to obtain cost information from a previous job and use it to price the next job.
(True/False)
4.8/5
(39)
____ for cast-in-place concrete may be constructed of lumber, plywood, aluminum, steel, and combinations of these materials.
(Multiple Choice)
4.8/5
(33)
The use of concrete buggies has increased significantly in recent years.
(True/False)
4.7/5
(37)
An allowance for waste and spillage of concrete is added as a waste factor to concrete takeoff quantities.
(True/False)
4.9/5
(33)
Chutes over ____ feet long can be harmful to the concrete mix by causing segregation of concrete constituents.
(Multiple Choice)
4.9/5
(33)
Buggies require a small number of personnel to operate them in order to maintain reasonable production rates in terms of cubic yards placed per hour.
(True/False)
4.9/5
(39)
The most time-consuming activity involved in setting up a form system is usually the placing and adjusting of ____.
(Multiple Choice)
4.8/5
(33)
The "____" is the area of the form system that will be in contact with the concrete.
(Multiple Choice)
4.8/5
(34)
Where a central tower crane is not in place on a site, using ______ to place concrete is usually the most economical alternative.
(Multiple Choice)
4.7/5
(33)
The cost of materials used in a formwork system would include the rental or purchase cost of all the components involved in its construction, including form ties and other hardware items.
(True/False)
4.9/5
(32)
Form hardware is often computed at a rate of between ____ of the total value of formwork material included in the estimate.
(Multiple Choice)
4.9/5
(36)
____ has randomly distributed fibers incorporated into the concrete mix with the object of improving the tensile strength of the concrete and increasing the concrete's ability to resist cracking and deformation.
(Multiple Choice)
4.8/5
(36)
The need for a multitude of calculations of form materials prices can be entirely avoided by using a(n)"____" for all form materials required on a project.
(Multiple Choice)
4.8/5
(27)
The value of waste factors usually lies between 1% and ____% for concrete placed in formwork.
(Multiple Choice)
4.9/5
(37)
Reinforcing steel for concrete includes ____ and reinforcing bars.
(Multiple Choice)
4.7/5
(43)
____ additives to concrete are used to maintain a low water/cement ratio in a concrete mix for maximum strength.
(Multiple Choice)
4.8/5
(26)
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)