Deck 5: Project Chronology

Full screen (f)
exit full mode
Question
Matching
Identify in which project phase the following work would occur.

-Contract for subcontract services

A) Initiation and feasibility analysis
B) Project design
C) Procurement
D) Construction
E) Turnover and startup
Use Space or
up arrow
down arrow
to flip the card.
Question
Matching
Identify in which project phase the following work would occur.

-Broad-scale planning

A) Initiation and feasibility analysis
B) Project design
C) Procurement
D) Construction
E) Turnover and startup
Question
Matching
Identify in which project phase the following work would occur.

-Store spare parts and collect warranties

A) Initiation and feasibility analysis
B) Project design
C) Procurement
D) Construction
E) Turnover and startup
Question
Matching
Identify in which project phase the following work would occur.

-Coordinate labor and material installation

A) Initiation and feasibility analysis
B) Project design
C) Procurement
D) Construction
E) Turnover and startup
Question
Matching
Identify in which project phase the following work would occur.

-Write project specifications

A) Initiation and feasibility analysis
B) Project design
C) Procurement
D) Construction
E) Turnover and startup
Question
As a project moves through the design phase, decisions and details considered become more numerous, and of a smaller scale.
Question
Long-lead items are materials or equipment typically ordered and bought by the in advance of the contract award.

A) Owner
B) Designer
C) Construction manager
D) Trade contractor
E) Public
Question
With the cost of money increasing 10 percent per year, a dollar spent on construction today is worth more than a dollar earned two years in the future.
Question
In which of the following are the four stages of design in the correct order?

A) Schematic design; programming; design development; contract documents
B) Programming; schematic design; design development; contract documents
C) Design development; schematic design; contract documents; programming
D) Schematic design; design development; contract documents; programming
E) Programming; design development; schematic design; contract documents
Question
Assuming no contract changes, during which of the following project stages is the actual cost of construction most likely to be determined?

A) Feasibility analysis
B) Design
C) Procurement
D) Construction
E) None of the above
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 5: Project Chronology
1
Matching
Identify in which project phase the following work would occur.

-Contract for subcontract services

A) Initiation and feasibility analysis
B) Project design
C) Procurement
D) Construction
E) Turnover and startup
Procurement
2
Matching
Identify in which project phase the following work would occur.

-Broad-scale planning

A) Initiation and feasibility analysis
B) Project design
C) Procurement
D) Construction
E) Turnover and startup
Initiation and feasibility analysis
3
Matching
Identify in which project phase the following work would occur.

-Store spare parts and collect warranties

A) Initiation and feasibility analysis
B) Project design
C) Procurement
D) Construction
E) Turnover and startup
Turnover and startup
4
Matching
Identify in which project phase the following work would occur.

-Coordinate labor and material installation

A) Initiation and feasibility analysis
B) Project design
C) Procurement
D) Construction
E) Turnover and startup
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
5
Matching
Identify in which project phase the following work would occur.

-Write project specifications

A) Initiation and feasibility analysis
B) Project design
C) Procurement
D) Construction
E) Turnover and startup
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
6
As a project moves through the design phase, decisions and details considered become more numerous, and of a smaller scale.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
7
Long-lead items are materials or equipment typically ordered and bought by the in advance of the contract award.

A) Owner
B) Designer
C) Construction manager
D) Trade contractor
E) Public
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
8
With the cost of money increasing 10 percent per year, a dollar spent on construction today is worth more than a dollar earned two years in the future.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
9
In which of the following are the four stages of design in the correct order?

A) Schematic design; programming; design development; contract documents
B) Programming; schematic design; design development; contract documents
C) Design development; schematic design; contract documents; programming
D) Schematic design; design development; contract documents; programming
E) Programming; design development; schematic design; contract documents
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
10
Assuming no contract changes, during which of the following project stages is the actual cost of construction most likely to be determined?

A) Feasibility analysis
B) Design
C) Procurement
D) Construction
E) None of the above