Exam 5: Project Chronology
Exam 1: The Construction Industry10 Questions
Exam 2: Project Participants10 Questions
Exam 3: Organizing and Leading the Construction Project9 Questions
Exam 4: Project Delivery Methods10 Questions
Exam 5: Project Chronology10 Questions
Exam 6: Construction Services During Design10 Questions
Exam 7: Bidding and Procurement10 Questions
Exam 8: Construction and Closeout10 Questions
Exam 9: Estimating Project Costs10 Questions
Exam 10: Project Planning and Scheduling10 Questions
Exam 11: Controlling Project Cost, Time, and Quality10 Questions
Exam 12: Job Site Administration10 Questions
Exam 13: Construction Law10 Questions
Exam 14: Construction Safety and Health10 Questions
Exam 15: Key Concepts in Construction Management and Delivery Methods135 Questions
Select questions type
In which of the following are the four stages of design in the correct order?
Free
(Multiple Choice)
4.8/5
(41)
Correct Answer:
B
Matching
Identify in which project phase the following work would occur.
-Store spare parts and collect warranties
Free
(Multiple Choice)
4.9/5
(29)
Correct Answer:
E
Matching
Identify in which project phase the following work would occur.
-Write project specifications
Free
(Multiple Choice)
4.9/5
(41)
Correct Answer:
B
Matching
Identify in which project phase the following work would occur.
-Broad-scale planning
(Multiple Choice)
4.9/5
(32)
Matching
Identify in which project phase the following work would occur.
-Contract for subcontract services
(Multiple Choice)
4.9/5
(45)
Long-lead items are materials or equipment typically ordered and bought by the in advance of the contract award.
(Multiple Choice)
4.9/5
(39)
Matching
Identify in which project phase the following work would occur.
-Coordinate labor and material installation
(Multiple Choice)
4.8/5
(30)
With the cost of money increasing 10 percent per year, a dollar spent on construction today is worth more than a dollar earned two years in the future.
(True/False)
4.7/5
(36)
As a project moves through the design phase, decisions and details considered become more numerous, and of a smaller scale.
(True/False)
4.8/5
(33)
Assuming no contract changes, during which of the following project stages is the actual cost of construction most likely to be determined?
(Multiple Choice)
4.7/5
(46)
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)