Deck 11: Controlling Project Cost, Time, and Quality
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/10
Play
Full screen (f)
Deck 11: Controlling Project Cost, Time, and Quality
1
As a project is crashed from its normal duration to its optimal duration, ????.
A) The project's indirect cost is reduced
B) The project's direct cost is reduced
C) The duration of the project increases
D) Additional float is created
E) None of the above
A) The project's indirect cost is reduced
B) The project's direct cost is reduced
C) The duration of the project increases
D) Additional float is created
E) None of the above
The project's indirect cost is reduced
2
The ????schedule is used as a primary performance model in the derivation of all control curves.
A) Bar chart
B) CPM
C) Matrix
D) Horse blanket
E) All of the above
A) Bar chart
B) CPM
C) Matrix
D) Horse blanket
E) All of the above
CPM
3
Cost control can be approached as an application of Pareto's law, which states that ???? percent of the project's outcome is determined by ????percent of the included elements .
A)
B)
C)
D)
E)
A)
B)
C)
D)
E)
4
Cost control is a form of cost accounting.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
5
A project control system should isolate and control in detail those elements with the greatest impact on final cost.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
6
How can a project manager compress a schedule?
A) Revise the schedules logic
B) Use overtime
C) Use substitute materials or equipment
D) Increase crew size
E) All of the above
A) Revise the schedules logic
B) Use overtime
C) Use substitute materials or equipment
D) Increase crew size
E) All of the above
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
7
Value engineering is a creative, organized approach whose objective is to minimize cost and/or maximize performance of a facility or system.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
8
Which curve listed would best serve as the basis of a contractor's accounts receivable (A/R)?
A) Cost
B) Production
C) Schedule of values
D) Income
E) Cash requirements
A) Cost
B) Production
C) Schedule of values
D) Income
E) Cash requirements
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
9
The purpose(s) of front-end loading and weighting is (are) to ???
A) Offset project mobilization costs
B) Offset owner retainage
C) Improve contractor cash flow
D) All of the above
A) Offset project mobilization costs
B) Offset owner retainage
C) Improve contractor cash flow
D) All of the above
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
10
As quality expenditures increase, the value to the owner increases, but at a decreasing rate.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck