Exam 11: Controlling Project Cost, Time, and Quality

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

The purpose(s) of front-end loading and weighting is (are) to ???

Free
(Multiple Choice)
4.8/5
(39)
Correct Answer:
Verified

D

As a project is crashed from its normal duration to its optimal duration, ????.

Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
Verified

A

Which curve listed would best serve as the basis of a contractor's accounts receivable (A/R)?

Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
Verified

D

As quality expenditures increase, the value to the owner increases, but at a decreasing rate.

(True/False)
4.7/5
(23)

How can a project manager compress a schedule?

(Multiple Choice)
4.9/5
(34)

Value engineering is a creative, organized approach whose objective is to minimize cost and/or maximize performance of a facility or system.

(True/False)
4.8/5
(23)

The ????schedule is used as a primary performance model in the derivation of all control curves.

(Multiple Choice)
4.9/5
(42)

A project control system should isolate and control in detail those elements with the greatest impact on final cost.

(True/False)
4.9/5
(37)

Cost control can be approached as an application of Pareto's law, which states that ???? percent of the project's outcome is determined by ????percent of the included elements .

(Multiple Choice)
4.8/5
(29)

Cost control is a form of cost accounting.

(True/False)
4.7/5
(35)