Deck 7: Monitoring and Controlling Projects

Full screen (f)
exit full mode
Question
You cannot control the scope of a project unless you have first clearly defined the scope and set a scope verification process in place.
Use Space or
up arrow
down arrow
to flip the card.
Question
It is not possible for project managers to observe and discuss the work of virtual workers.
Question
The key outputs resulting from scope verification and scope control are deliverables that are accepted by the customer.
Question
Experienced managers and buyers rely solely on color indicators to monitor project progress.
Question
In a Pareto chart,the variables represented are ordered by frequency of occurrence.
Question
Earned value calculations for all project activities are required to estimate the earned value for the entire project.
Question
Flowcharts show activities,decision points,and the order of how information is processed.
Question
Key outputs of project monitoring and controlling include every knowledge area as defined by the PMBOK Guide.
Question
Projects should have a change-control system that defines procedures for changing the cost baseline.
Question
In the columns to the left of the tracking Gantt chart,you can display baseline and actual start and finish dates.
Question
In project time management,time is the variable with the least amount of flexibility.
Question
If you do not have a good baseline or actual scope,time,and cost information,you cannot use earned value management.
Question
Earned value (EV)is an estimate of the value of physical work that is yet to be completed.
Question
A red diamond on the tracking Gantt chart represents a slipped milestone.
Question
You may only use earned value management at a summary level.
Question
Reviewing morale and work behavior is one good way to measure schedule performance.
Question
You can use control charts to perform trend analysis to forecast future outcomes based on historical results.
Question
In the middle and latter stages of a project,procedure-related issues become the predominant source of conflict.
Question
Different cultures and even entire countries have different attitudes about schedules.
Question
You cannot graph earned value information to track project performance.
Question
Project risk management stops with the initial risk analysis.
Question
Earned value management involves calculating ____ values for each activity or summary activity from a project's WBS.

A) three
B) four
C) five
D) six
Question
The main monitoring and controlling tasks performed as part of project ____ management are scope verification and scope control.

A) integration
B) scope
C) cost
D) time
Question
The main monitoring and controlling task performed as part of project time management is ____ control.

A) document
B) employee
C) schedule
D) scope
Question
The main monitoring and controlling tasks performed as part of project ____ management include monitoring and controlling project work and performing integrated change control.

A) integration
B) scope
C) time
D) cost
Question
In the context of earned value management,____ are calculated by subtracting the actual cost or planned value from EV,and indexes are calculated by dividing EV by the actual cost or planned value.

A) fluctuations
B) valuations
C) variances
D) deviations
Question
The project scope statement,WBS dictionary,project scope management plan,and ____ are the main inputs for scope verification.

A) summaries
B) reviews
C) deliverables
D) assessments
Question
In earned value management,a baseline includes ____ (WBS tasks),time (start and finish estimates for each task),and cost information (cost estimates for each task).

A) range
B) scope
C) schedule
D) dispatch
Question
A progress report describes what the project team anticipates will be accomplished in the future.
Question
Evaluation of any change to a project should include an impact analysis.
Question
Few projects are completed without any conflict.
Question
The approved time estimate for a project can be divided by the ____ performance index to calculate when the project will be completed.

A) cost
B) schedule
C) price
D) itinerary
Question
In the context of earned value management,the ____ cost is the total direct and indirect costs incurred in accomplishing work on an activity during a given period.

A) real
B) estimated
C) actual
D) projected
Question
Most senior managers do not want to review pertinent information at status review meetings and discuss problems,issues,and forecasts.
Question
By adding all of the ____ for all project activities,you can determine how the project as a whole is performing and forecast both when it will be completed and how much it will cost at completion.

A) earned values
B) actual costs
C) planned values
D) cost variances
Question
A contractual relationship is a legal relationship and,as such,is subject to state and federal contract laws.
Question
In the context of earned value management,the ____ value is that portion of the approved total cost estimate planned to be spent on an activity during a given period.

A) present
B) future
C) anticipated
D) planned
Question
The main tool for performing scope verification is ____.

A) random sampling
B) statistical estimation
C) inquiry
D) inspection
Question
Updating the risk register is an optional part of project monitoring and control.
Question
Performance reporting keeps stakeholders informed about how resources are being used to achieve project objectives.
Question
Which of the following actions will most likely improve team productivity?

A) Ensure that social events are mandatory and include a business-related goal.
B) Expand the size of work teams to over seven members.
C) Reduce the amount of attention paid to virtual team members.
D) Acknowledge individual and group accomplishments.
Question
Based on the implementation of quality-control measurements,____ adjustments often result in updates to the quality baseline,organizational process assets,and the project management plan.

A) contract
B) quality
C) process
D) project
Question
A(n)____ log is a tool used to document and monitor the resolution of project issues.

A) event
B) issue
C) problem
D) running
Question
The main monitoring and controlling task performed as part of project cost management is ____ control.

A) time
B) schedule
C) scope
D) cost
Question
In a ____,each bar represents an attribute or a characteristic of a problem or situation,and the height of the bar represents its frequency.

A) run chart
B) control chart
C) histogram
D) scatter diagram
Question
A(n)____ event is a specific,uncertain event that may occur to the detriment or enhancement of the project.

A) chance
B) risk
C) unplanned
D) hidden
Question
Which of the following actions will most likely improve team productivity?

A) Set the highest performance level from the start.
B) Establish regular, effective meetings.
C) Chastise team members for being lazy and careless.
D) Assign fault to the person who caused a problem.
Question
Given the earned value and ____,you can see how well the project team is meeting schedule goals and forecast when the project will be completed based on past schedule performance.

A) actual cost
B) cost variance
C) planned value
D) schedule variance
Question
In the context of a scatter diagram.,the closer data points are to a ____,the more closely the two variables are related.

A) circle
B) diagonal line
C) diamond
D) pentagon
Question
The main human resource management task performed as part of monitoring and controlling a project is managing the project ____,which,of course,is no small task.

A) sponsors
B) clients
C) team
D) supplies
Question
A(n)____ chart displays the history and pattern of variation of a process over time.

A) control
B) scatter
C) organizational
D) run
Question
Two key outputs of performance reporting are performance reports and ____.

A) forecasts
B) cost-benefit analyses
C) retrospectives
D) performance reviews
Question
Project teams sometimes use ____-unplanned responses to risk events-when they do not have contingency plans in place.

A) work charts
B) work flows
C) work processes
D) workarounds
Question
The goal of ____ control is to know the status of the schedule,influence the factors that cause schedule changes,determine whether the schedule has changed,and manage changes when they occur.

A) time
B) schedule
C) cost
D) scope
Question
The main procurement management task performed to monitor and control projects is administering the ____.

A) vision
B) contract
C) charter
D) project platform
Question
In the context of monitoring and controlling tasks for project quality management,____ decisions determine if the products or services produced as part of the project will be accepted or rejected.

A) acceptance
B) rejection
C) rework
D) redesign
Question
Risk reassessment,risk audits,variance and trend analysis,technical performance measurements,reserve analysis,and status meetings or periodic risk reviews are all tools and techniques for performing ____ monitoring and control.

A) scope
B) risk
C) cost
D) quality
Question
The dimension of the Myers-Briggs team-building tool that deals with peoples' attitudes toward structure and deadlines is ____.

A) Judgment/Perception (J/P)
B) Extrovert/Introvert (E/I)
C) Sensation/Intuition (S/N)
D) Thinking/Feeling (T/F)
Question
Pareto analysis is sometimes referred to as the ____ rule,meaning that 80 percent of problems are often due to 20 percent of the causes.

A) 80/20
B) 20/20
C) 20/80
D) 80/80
Question
____ reports describe where the project stands at a specific point in time.

A) News
B) Ad hoc
C) Status
D) Critical
Question
The ____________________,or the approved total budget for the project,can be divided by the cost performance index to calculate the estimate at completion (EAC),which is a forecast of how much the project will cost upon completion.
Question
A(n)____________________ milestone refers to a milestone activity that was actually completed later than originally planned.
Question
____________________ is action taken to bring rejected items into compliance with product requirements or specifications or other stakeholder expectations.
Question
A(n)____________________ is a starting point,a measurement,or an observation that is documented so that it can be used for future comparison.
Question
The cost ____________________,performance reports,change requests,and project funding requirements are inputs to the cost-control process.
Question
A key output of schedule control is ____________________ measurements.
Question
A(n)____________________ Gantt chart compares planned and actual project schedule information.
Question
A(n)____________________ is a bar graph of a distribution of variables.
Question
Contract updates are often made by having both parties-the buyer and the seller-sign a(n)____ to the contract.

A) addendum
B) revision
C) alteration
D) appendix
Question
____ change orders are oral or written acts or omissions by someone with actual or apparent authority that can be construed to have the same effect as a written change order.

A) Virtual
B) Non-binding
C) Apparent
D) Constructive
Question
In the context of earned value management,the ____________________ is the percentage of actual work completed divided by the percentage of work planned to have been completed at any given time.
Question
Contract ____ includes the contract itself along with requested unapproved contract changes and approved change requests.

A) authorization
B) review
C) documentation
D) negotiation
Question
A(n)____________________ diagram helps show if there is a relationship between two variables.
Question
____________________ change control involves identifying,evaluating,and managing changes throughout the project's life cycle.
Question
Even when the project scope is fairly well defined,many projects suffer from scope ____________________-the tendency for project scope to grow bigger and bigger.
Question
____________________ is a project performance measurement technique that integrates scope,time,and cost data.
Question
Cause-and-effect diagrams help you find the ____________________ cause of quality problems.
Question
Project management software offers color ____________________ as well as numerous reports to show schedule performance information.
Question
Scope ____________________ involves formal acceptance of the completed project scope by the project customer or designated stakeholders.
Question
The main project quality management task for monitoring and controlling is ____________________ control.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/90
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 7: Monitoring and Controlling Projects
1
You cannot control the scope of a project unless you have first clearly defined the scope and set a scope verification process in place.
True
2
It is not possible for project managers to observe and discuss the work of virtual workers.
False
3
The key outputs resulting from scope verification and scope control are deliverables that are accepted by the customer.
True
4
Experienced managers and buyers rely solely on color indicators to monitor project progress.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
5
In a Pareto chart,the variables represented are ordered by frequency of occurrence.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
6
Earned value calculations for all project activities are required to estimate the earned value for the entire project.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
7
Flowcharts show activities,decision points,and the order of how information is processed.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
8
Key outputs of project monitoring and controlling include every knowledge area as defined by the PMBOK Guide.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
9
Projects should have a change-control system that defines procedures for changing the cost baseline.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
10
In the columns to the left of the tracking Gantt chart,you can display baseline and actual start and finish dates.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
11
In project time management,time is the variable with the least amount of flexibility.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
12
If you do not have a good baseline or actual scope,time,and cost information,you cannot use earned value management.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
13
Earned value (EV)is an estimate of the value of physical work that is yet to be completed.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
14
A red diamond on the tracking Gantt chart represents a slipped milestone.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
15
You may only use earned value management at a summary level.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
16
Reviewing morale and work behavior is one good way to measure schedule performance.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
17
You can use control charts to perform trend analysis to forecast future outcomes based on historical results.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
18
In the middle and latter stages of a project,procedure-related issues become the predominant source of conflict.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
19
Different cultures and even entire countries have different attitudes about schedules.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
20
You cannot graph earned value information to track project performance.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
21
Project risk management stops with the initial risk analysis.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
22
Earned value management involves calculating ____ values for each activity or summary activity from a project's WBS.

A) three
B) four
C) five
D) six
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
23
The main monitoring and controlling tasks performed as part of project ____ management are scope verification and scope control.

A) integration
B) scope
C) cost
D) time
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
24
The main monitoring and controlling task performed as part of project time management is ____ control.

A) document
B) employee
C) schedule
D) scope
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
25
The main monitoring and controlling tasks performed as part of project ____ management include monitoring and controlling project work and performing integrated change control.

A) integration
B) scope
C) time
D) cost
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
26
In the context of earned value management,____ are calculated by subtracting the actual cost or planned value from EV,and indexes are calculated by dividing EV by the actual cost or planned value.

A) fluctuations
B) valuations
C) variances
D) deviations
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
27
The project scope statement,WBS dictionary,project scope management plan,and ____ are the main inputs for scope verification.

A) summaries
B) reviews
C) deliverables
D) assessments
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
28
In earned value management,a baseline includes ____ (WBS tasks),time (start and finish estimates for each task),and cost information (cost estimates for each task).

A) range
B) scope
C) schedule
D) dispatch
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
29
A progress report describes what the project team anticipates will be accomplished in the future.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
30
Evaluation of any change to a project should include an impact analysis.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
31
Few projects are completed without any conflict.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
32
The approved time estimate for a project can be divided by the ____ performance index to calculate when the project will be completed.

A) cost
B) schedule
C) price
D) itinerary
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
33
In the context of earned value management,the ____ cost is the total direct and indirect costs incurred in accomplishing work on an activity during a given period.

A) real
B) estimated
C) actual
D) projected
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
34
Most senior managers do not want to review pertinent information at status review meetings and discuss problems,issues,and forecasts.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
35
By adding all of the ____ for all project activities,you can determine how the project as a whole is performing and forecast both when it will be completed and how much it will cost at completion.

A) earned values
B) actual costs
C) planned values
D) cost variances
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
36
A contractual relationship is a legal relationship and,as such,is subject to state and federal contract laws.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
37
In the context of earned value management,the ____ value is that portion of the approved total cost estimate planned to be spent on an activity during a given period.

A) present
B) future
C) anticipated
D) planned
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
38
The main tool for performing scope verification is ____.

A) random sampling
B) statistical estimation
C) inquiry
D) inspection
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
39
Updating the risk register is an optional part of project monitoring and control.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
40
Performance reporting keeps stakeholders informed about how resources are being used to achieve project objectives.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
41
Which of the following actions will most likely improve team productivity?

A) Ensure that social events are mandatory and include a business-related goal.
B) Expand the size of work teams to over seven members.
C) Reduce the amount of attention paid to virtual team members.
D) Acknowledge individual and group accomplishments.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
42
Based on the implementation of quality-control measurements,____ adjustments often result in updates to the quality baseline,organizational process assets,and the project management plan.

A) contract
B) quality
C) process
D) project
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
43
A(n)____ log is a tool used to document and monitor the resolution of project issues.

A) event
B) issue
C) problem
D) running
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
44
The main monitoring and controlling task performed as part of project cost management is ____ control.

A) time
B) schedule
C) scope
D) cost
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
45
In a ____,each bar represents an attribute or a characteristic of a problem or situation,and the height of the bar represents its frequency.

A) run chart
B) control chart
C) histogram
D) scatter diagram
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
46
A(n)____ event is a specific,uncertain event that may occur to the detriment or enhancement of the project.

A) chance
B) risk
C) unplanned
D) hidden
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
47
Which of the following actions will most likely improve team productivity?

A) Set the highest performance level from the start.
B) Establish regular, effective meetings.
C) Chastise team members for being lazy and careless.
D) Assign fault to the person who caused a problem.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
48
Given the earned value and ____,you can see how well the project team is meeting schedule goals and forecast when the project will be completed based on past schedule performance.

A) actual cost
B) cost variance
C) planned value
D) schedule variance
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
49
In the context of a scatter diagram.,the closer data points are to a ____,the more closely the two variables are related.

A) circle
B) diagonal line
C) diamond
D) pentagon
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
50
The main human resource management task performed as part of monitoring and controlling a project is managing the project ____,which,of course,is no small task.

A) sponsors
B) clients
C) team
D) supplies
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
51
A(n)____ chart displays the history and pattern of variation of a process over time.

A) control
B) scatter
C) organizational
D) run
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
52
Two key outputs of performance reporting are performance reports and ____.

A) forecasts
B) cost-benefit analyses
C) retrospectives
D) performance reviews
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
53
Project teams sometimes use ____-unplanned responses to risk events-when they do not have contingency plans in place.

A) work charts
B) work flows
C) work processes
D) workarounds
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
54
The goal of ____ control is to know the status of the schedule,influence the factors that cause schedule changes,determine whether the schedule has changed,and manage changes when they occur.

A) time
B) schedule
C) cost
D) scope
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
55
The main procurement management task performed to monitor and control projects is administering the ____.

A) vision
B) contract
C) charter
D) project platform
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
56
In the context of monitoring and controlling tasks for project quality management,____ decisions determine if the products or services produced as part of the project will be accepted or rejected.

A) acceptance
B) rejection
C) rework
D) redesign
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
57
Risk reassessment,risk audits,variance and trend analysis,technical performance measurements,reserve analysis,and status meetings or periodic risk reviews are all tools and techniques for performing ____ monitoring and control.

A) scope
B) risk
C) cost
D) quality
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
58
The dimension of the Myers-Briggs team-building tool that deals with peoples' attitudes toward structure and deadlines is ____.

A) Judgment/Perception (J/P)
B) Extrovert/Introvert (E/I)
C) Sensation/Intuition (S/N)
D) Thinking/Feeling (T/F)
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
59
Pareto analysis is sometimes referred to as the ____ rule,meaning that 80 percent of problems are often due to 20 percent of the causes.

A) 80/20
B) 20/20
C) 20/80
D) 80/80
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
60
____ reports describe where the project stands at a specific point in time.

A) News
B) Ad hoc
C) Status
D) Critical
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
61
The ____________________,or the approved total budget for the project,can be divided by the cost performance index to calculate the estimate at completion (EAC),which is a forecast of how much the project will cost upon completion.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
62
A(n)____________________ milestone refers to a milestone activity that was actually completed later than originally planned.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
63
____________________ is action taken to bring rejected items into compliance with product requirements or specifications or other stakeholder expectations.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
64
A(n)____________________ is a starting point,a measurement,or an observation that is documented so that it can be used for future comparison.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
65
The cost ____________________,performance reports,change requests,and project funding requirements are inputs to the cost-control process.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
66
A key output of schedule control is ____________________ measurements.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
67
A(n)____________________ Gantt chart compares planned and actual project schedule information.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
68
A(n)____________________ is a bar graph of a distribution of variables.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
69
Contract updates are often made by having both parties-the buyer and the seller-sign a(n)____ to the contract.

A) addendum
B) revision
C) alteration
D) appendix
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
70
____ change orders are oral or written acts or omissions by someone with actual or apparent authority that can be construed to have the same effect as a written change order.

A) Virtual
B) Non-binding
C) Apparent
D) Constructive
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
71
In the context of earned value management,the ____________________ is the percentage of actual work completed divided by the percentage of work planned to have been completed at any given time.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
72
Contract ____ includes the contract itself along with requested unapproved contract changes and approved change requests.

A) authorization
B) review
C) documentation
D) negotiation
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
73
A(n)____________________ diagram helps show if there is a relationship between two variables.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
74
____________________ change control involves identifying,evaluating,and managing changes throughout the project's life cycle.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
75
Even when the project scope is fairly well defined,many projects suffer from scope ____________________-the tendency for project scope to grow bigger and bigger.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
76
____________________ is a project performance measurement technique that integrates scope,time,and cost data.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
77
Cause-and-effect diagrams help you find the ____________________ cause of quality problems.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
78
Project management software offers color ____________________ as well as numerous reports to show schedule performance information.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
79
Scope ____________________ involves formal acceptance of the completed project scope by the project customer or designated stakeholders.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
80
The main project quality management task for monitoring and controlling is ____________________ control.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 90 flashcards in this deck.