Deck 17: Building the Block Corner

Full screen (f)
exit full mode
Question
Because blocks are heavy, hollow, and somewhat awkward to handle, care must be taken to prevent them from spalling, which is also known as ______ .

A) sinking
B) falling
C) breaking
D) chipping
Use Space or
up arrow
down arrow
to flip the card.
Question
The corner is the key to a straight, plumb wall as once the line is attached and the wall is built, it will be of the same height as the corner.
Question
When building the corner to the specified height, each course should be _____ before proceeding to the next course.

A) furrowed
B) dampened
C) aligned
D) dried
Question
Only one type of joint finish may be used with concrete block.
Question
A concrete block corner is constructed in a very different way than a brick corner.
Question
When laying the first course, spread a solid bed of mortar and do not furrow, also known as _____, the mortar bed joint.

A) groove
B) level
C) reduce
D) build up
Question
Be sure that reinforcement wire is bedded solidly in the mortar joint and lap the wire _____ over the next piece if more than one length of wire is needed.

A) at least 1'
B) at least 6"
C) no more than 5"
D) no more than 3"
Question
Each course should be aligned before proceeding to the next course.
Question
In a _____, the joint is even with the face of the concrete block.

A) flush joint
B) concave joint
C) V-joint
D) finish joint
Question
If wire joint reinforcement is called for in the building specifications, install it at the proper height, which is normally every 16" in height or every other course.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 17: Building the Block Corner
1
Because blocks are heavy, hollow, and somewhat awkward to handle, care must be taken to prevent them from spalling, which is also known as ______ .

A) sinking
B) falling
C) breaking
D) chipping
D
2
The corner is the key to a straight, plumb wall as once the line is attached and the wall is built, it will be of the same height as the corner.
True
3
When building the corner to the specified height, each course should be _____ before proceeding to the next course.

A) furrowed
B) dampened
C) aligned
D) dried
C
4
Only one type of joint finish may be used with concrete block.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
5
A concrete block corner is constructed in a very different way than a brick corner.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
6
When laying the first course, spread a solid bed of mortar and do not furrow, also known as _____, the mortar bed joint.

A) groove
B) level
C) reduce
D) build up
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
7
Be sure that reinforcement wire is bedded solidly in the mortar joint and lap the wire _____ over the next piece if more than one length of wire is needed.

A) at least 1'
B) at least 6"
C) no more than 5"
D) no more than 3"
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
8
Each course should be aligned before proceeding to the next course.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
9
In a _____, the joint is even with the face of the concrete block.

A) flush joint
B) concave joint
C) V-joint
D) finish joint
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
10
If wire joint reinforcement is called for in the building specifications, install it at the proper height, which is normally every 16" in height or every other course.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 10 flashcards in this deck.