Exam 17: Building the Block Corner

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Be sure that reinforcement wire is bedded solidly in the mortar joint and lap the wire _____ over the next piece if more than one length of wire is needed.

Free
(Multiple Choice)
4.8/5
(41)
Correct Answer:
Verified

B

Because blocks are heavy, hollow, and somewhat awkward to handle, care must be taken to prevent them from spalling, which is also known as ______ .

Free
(Multiple Choice)
4.8/5
(36)
Correct Answer:
Verified

D

Only one type of joint finish may be used with concrete block.

Free
(True/False)
4.7/5
(34)
Correct Answer:
Verified

False

A concrete block corner is constructed in a very different way than a brick corner.

(True/False)
4.8/5
(34)

When building the corner to the specified height, each course should be _____ before proceeding to the next course.

(Multiple Choice)
4.9/5
(32)

If wire joint reinforcement is called for in the building specifications, install it at the proper height, which is normally every 16" in height or every other course.

(True/False)
4.8/5
(32)

Each course should be aligned before proceeding to the next course.

(True/False)
4.8/5
(40)

In a _____, the joint is even with the face of the concrete block.

(Multiple Choice)
4.8/5
(41)

The corner is the key to a straight, plumb wall as once the line is attached and the wall is built, it will be of the same height as the corner.

(True/False)
4.7/5
(37)

When laying the first course, spread a solid bed of mortar and do not furrow, also known as _____, the mortar bed joint.

(Multiple Choice)
4.7/5
(30)
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)