Question
16)To minimize the size of queues in intermittent processes,schedulers need to address ______ major issues

A)three
B)four
C)two
D)five
Use Space or
up arrow
down arrow
to flip the card.
Question
4)Scheduling decisions have ______ time horizons.

A)long-term
B)intermediate-term
C)short-term
D)prolonged term
Question
14)______ is concerned with regulating inputs to a work center in relation to output and available capacity so that the queues and waiting times of jobs can be managed and kept under control.

A)Input control
B)Input-output control
C)Process control
D)Capacity control
Question
18)______ is the assignment of jobs to work or processing centers.

A)Input-output control
B)Sequencing
C)Worker assignment
D)Loading
Question
7)Which of the following is NOT an objective of scheduling?

A)Resources such as equipment and labor are used effectively.
B)Overall costs are reduced.
C)Work-in-process inventories are maximized.
D)Productivity is increased by maximizing flow of goods and services through the system.
Question
2)Detailed production schedule is the ______ set of decisions in the hierarchy of operations decision for ______ organizations.

A)last,manufacturing
B)first,manufacturing
C)last,service
D)first,service
Question
12)Products are made to order,and each order has its own unique material and processing requirements,processing sequence,and processing times in ______ processes.

A)intermittent
B)machine
C)line
D)continuous
Question
5)______ is the process of making specific resources such as labor,equipment,and facilities to produce a product or deliver a service available.

A)Planning
B)Scheduling
C)Forecasting
D)Production
Question
20)______ type(s)of Gantt charts is/are used for scheduling decisions.

A)One
B)Two
C)Three
D)Four
Question
17)Which of the following is NOT one of the major issues to be addressed by schedulers in order to reduce the size of the queues in intermittent processes?

A)input-output control
B)loading
C)worker assignment
D)sequencing
Question
10)______ calculations are used to determine a schedule that allocates the capacity of the line among the several products.

A)Flow time
B)Run time
C)Lead time
D)Runout time
Question
15)The use of dams in rivers to control water flow is a simple example of ______.

A)water control
B)input-output control
C)process control
D)capacity control
Question
3)Monthly or weekly service schedule is the ______ set of decisions in the hierarchy of operations decision for ______ organizations.

A)last,manufacturing
B)first,manufacturing
C)last,service
D)first,service
Question
9)Scheduling for line processes is often referred to as ______.

A)cluster scheduling
B)flow-shop scheduling
C)batch scheduling
D)job-shop scheduling
Question
11)______ is a form of line process scheduling in which many of the scheduling decisions are predetermined when the production systems are designed.

A)Cluster scheduling
B)Job-shop scheduling
C)Flow-shop scheduling
D)Batch scheduling
Question
6)Scheduling decisions are typically ______ in scope.

A)extensive
B)widespread
C)narrow
D)broad
Question
8)______ are high-volume product processes that typically produce standardized products and require identical or similar operations.

A)Line processes
B)Intermittent processes
C)Machine processes
D)Outlier processes
Question
13)Which of the following statements is true about process scheduling?

A)Line process scheduling is considerably more complex than job-shop scheduling.
B)Line process scheduling and job-shop scheduling have the same level of complexity.
C)Job-shop scheduling is considerably more complex than line process scheduling.
D)It is difficult to determine the complexity of line process scheduling.
Question
1)In the hierarchy of decisions made in the field of operations,detailed scheduling is the ______ step before the actual manufacture of the product or delivery of service.

A)fourth
B)first
C)seventh
D)final
Question
19)Which of the following is NOT one of the objectives of loading decisions?

A)minimize idle time
B)minimize setup time
C)maximize processing time
D)minimize setup costs
Question
33)______ are simple decision rules that are used to select jobs for the next operation in order to control the flow of work as jobs progress through a single process,machine,or work center.

A)Scheduling rules
B)Sequencing rules
C)Priority rules
D)Job processing rules
Question
39)Jobs are ranked according to their due dates,and the job that has the earliest due date is processed first and completed in ______.

A)shortest processing time
B)earliest due date
C)longest processing time
D)critical ratio (CR)
Question
27)A scheduling process used to determine the approximate completion time for each job,the capacity required in each time period by beginning with the current date for those jobs that have known processing requirements,and loading the jobs forward in time is called ______.

A)current-date scheduling
B)forward scheduling
C)due-dates scheduling
D)backward scheduling
Question
31)Schedules may have to be revised frequently due to factors such as machine breakdowns,processing delays at work centers,and the like.This is the drawback of ______.

A)fixed loading
B)iterative loading
C)finite loading
D)infinite loading
Question
38)The ______ rule can be applied for scheduling in make-to-stock and make-to-order production systems.

A)shortest processing time
B)earliest due date
C)longest processing time
D)critical ratio (CR)
Question
35)______ is a dynamic sequencing rule that gives priority to those jobs that most urgently need work so that orders can be completed by the due date and shipped on schedule.

A)First come,first served
B)Shortest processing time
C)Critical ratio
D)Earliest due date
Question
29)In reality,most businesses generally use ______.

A)a combination of forward and backward scheduling
B)forward scheduling only
C)backward scheduling only
D)advanced scheduling
Question
26)The assignment method is a special case of a group of problems called ______ problems.

A)integer programming
B)network programming
C)work-flow optimization
D)linear programming
Question
36)The job is behind schedule when ______.

A)CR = 0
B)CR = 1
C)CR > 1
D)CR < 1
Question
28)A scheduling process used to determine in advance the capacity required at each work center for each time period to complete the jobs by the due dates by beginning with the due date for each job and loading the processing requirements for these jobs at each work center by proceeding backward in time is called ______

A)current-date scheduling
B)forward scheduling
C)due-dates scheduling
D)backward scheduling
Question
40)The formula for calculating critical ratio is ______.

A)Work remaining / Time remaining
B)Time remaining / Work remaining
C)Cost remaining / Time remaining
D)Time remaining / Cost remaining
Question
24)______ is a method applied to situations in which various resources must be allocated to activities on a one-to-one basis.

A)Time-series method
B)Assignment method
C)Integer programming
D)Linear analysis
Question
23)______ charts are used to monitor jobs in progress,show which jobs are on schedule,and which are ahead or behind schedule.

A)Gantt load
B)Gantt schedule
C)Gantt sequence
D)Gantt output
Question
34)The job that arrived first at a work center or machine will be processed first and completed.Which of the following priority rules does this statement represent?

A)first come,first served
B)shortest processing time
C)critical ratio
D)earliest due date
Question
32)______ is the process of determining the exact order or priority of job processing.

A)Sequencing
B)Scheduling
C)Prioritizing
D)Job processing
Question
22)______ charts show the loads on various work centers,equipment,or facilities as well as the associated idle times.

A)Gantt load
B)Gantt schedule
C)Gantt sequence
D)Gantt output
Question
25)______ is a technique used to optimize an objective (such as maximizing profits or minimizing costs)under certain constraints,such as availability of resources.

A)Integer programming
B)Assignment method
C)Linear programming
D)Work-flow optimization
Question
37)Critical ratio (CR)= 1 implies ______.

A)the job is completed
B)the job is ahead of schedule
C)the job is on schedule
D)the job is behind schedule
Question
30)______ is the preferred loading approach in the scheduling phase because it takes into account the actual processing times of jobs and the available capacity at each work center.

A)Finite loading
B)Infinite loading
C)Fixed loading
D)Iterative loading
Question
21)______ are visual tools that can be used to make decisions in intermittent processes.

A)Gantt charts
B)Assignment methods
C)Pie charts
D)Milestone charts
Question
41)The job is ahead of schedule when ______.

A)CR = 1
B)CR < 1
C)CR = 0.5
D)CR > 1
Question
42)Which of the following is NOT an assumption required for the use of priority rules?

A)The set of jobs to be processed is known and does not change.
B)Setup times are dependent on job processing sequence.
C)Setup times and processing times are known and do not vary.
D)There are no unexpected interruptions in job processing.
Question
56)The average tardiness for the job listed in the table below under the longest processing time (LPT)rule is ______. <strong>56)The average tardiness for the job listed in the table below under the longest processing time (LPT)rule is ______.  </strong> A)16 days B)14 days C)15 days D)13 days <div style=padding-top: 35px>

A)16 days
B)14 days
C)15 days
D)13 days
Question
48)______ is the time that the completion of an actual job exceeds its due date.

A)Average job tardiness
B)Average flow time
C)Makespan
D)Processing time
Question
55)The average flow time for the jobs listed in the table below under the longest processing time (LPT)rule is ______. <strong>55)The average flow time for the jobs listed in the table below under the longest processing time (LPT)rule is ______.  </strong> A)27.4 days B)24.4 days C)23.4 days D)26.7 days <div style=padding-top: 35px>

A)27.4 days
B)24.4 days
C)23.4 days
D)26.7 days
Question
50)Which of the following is NOT a part of the average job flow time?

A)transportation time
B)actual processing time
C)waiting time
D)customer delivery time
Question
44)______ is the total length of time that a job spends at a work center from the point of arrival to the point where it leaves the work center.

A)Job flow time
B)Job completion time
C)Job tardiness
D)Job processing time
Question
47)______ is the total time needed to complete a group of jobs starting with the first job until the completion of the last job.

A)Average job tardiness
B)Average flow time
C)Makespan
D)Processing time
Question
43)Which of the following is NOT a performance evaluation criterion for priority rules?

A)average job flow time
B)average number of jobs in the system
C)average job tardiness
D)average job setup time
Question
54)Determine the longest processing time (LPT)sequence for the jobs listed in the following table. <strong>54)Determine the longest processing time (LPT)sequence for the jobs listed in the following table.  </strong> A)A-B-C-D-E B)D-B-C-A-E C)D-B-E-C-A D)A-D-C-B-E <div style=padding-top: 35px>

A)A-B-C-D-E
B)D-B-C-A-E
C)D-B-E-C-A
D)A-D-C-B-E
Question
60)______ steps are necessary to implement Johnson's rule.

A)Six
B)Three
C)Four
D)Five
Question
52)The average tardiness for the jobs listed in the following table under the FCFS (first come,first served)rule is ______. <strong>52)The average tardiness for the jobs listed in the following table under the FCFS (first come,first served)rule is ______.  </strong> A)11 days B)9.8 days C)15 days D)8 days <div style=padding-top: 35px>

A)11 days
B)9.8 days
C)15 days
D)8 days
Question
53)The average number of jobs in the work center for the jobs listed in the following table under the FCFS (first come,first served)rule is ______. <strong>53)The average number of jobs in the work center for the jobs listed in the following table under the FCFS (first come,first served)rule is ______.  </strong> A)3.5 B)2.1 C)3.23 D)2.79 <div style=padding-top: 35px>

A)3.5
B)2.1
C)3.23
D)2.79
Question
51)Determine the FCFS (first come,first served)sequence for the jobs listed in the following table.Assume that the jobs have arrived in the order listed in the table. <strong>51)Determine the FCFS (first come,first served)sequence for the jobs listed in the following table.Assume that the jobs have arrived in the order listed in the table.  </strong> A)A-B-C-D-E B)A-C-D-E-B C)B-C-D-E-A D)B-A-C-D-E <div style=padding-top: 35px>

A)A-B-C-D-E
B)A-C-D-E-B
C)B-C-D-E-A
D)B-A-C-D-E
Question
46)The average number of jobs in the system is the surrogate measure for ______.

A)average work-in-process inventory
B)average process inventory
C)average job tardiness
D)average finished goods inventory
Question
49)Total flow time of all the jobs divided by the number of jobs gives the ______.

A)average processing time
B)average job flow time
C)average job tardiness
D)average job setup time
Question
45)The formula for calculating the average number of jobs in the system is ______.

A)Total processing time / Makespan
B)Total setup time / Makespan
C)Total flow time / Makespan
D)Makespan / Total processing time
Question
59)Which of the following is NOT an ideal situation to implement Johnson's rule?

A)There are no work-in-process inventory storage problems.
B)There are no overriding individual job priorities.
C)The same processing sequence is maintained on either processes,machines,or work centers.
D)There are overriding individual job priorities.
Question
58)Which of the following is the objective of Johnson's rule?

A)minimize makespan
B)maximize makespan
C)maximize average flow time
D)minimize critical ratio
Question
57)For sequencing N jobs through two machines,processes,or work centers in the same order,_________ provides the most efficient method.

A)priority rules
B)Johnson's rule
C)batch rule
D)process rule
Question
78)Which of the following is FALSE about service environment,typically not encountered in manufacturing environment?

A)It is not possible to store or inventory services.
B)Services are not difficult to schedule because they are not typically labor intensive.
C)The fluctuating demand for services and the need to customize services for individual customers makes scheduling services more difficult.
D)Service schedules are constrained by legal requirements and union contracts.
Question
75)A scheduling system for service organizations that uses computerized systems to maximize customer satisfaction by smoothing out demand for their services in any given time is a(n)______.

A)reservation system
B)prioritization system
C)appointment system
D)capacity utilization system
Question
73)Which of the following is NOT a performance measure used by theory of constraints to evaluate the effectiveness of improvements?

A)increased throughput
B)reduction in inventory
C)reduction in throughput
D)reduction in operating expense
Question
74)A scheduling system for a service organization that minimizes customer or client waiting time while maximizing the labor and capacity utilization of the service system by designating specific times for clients to arrive is a(n)______.

A)reservation system
B)prioritization system
C)appointment system
D)capacity utilization system
Question
76)The process of coordinating scheduling decisions made by any member of a supply chain with the decisions of other supply chain partners is called ______.

A)supply chain scheduling
B)supply partners scheduling
C)decision scheduling
D)hierarchical scheduling
Question
71)The theory of constraints uses ______ performance measures to evaluate whether the effectiveness of the improvements made has enabled the system to make more money.

A)two
B)three
C)four
D)five
Question
79)For bottleneck operations the process batch size should be ______ and the transfer batch size should be ______.

A)large,small
B)small,large
C)small,small
D)large,large
Question
61)Computerized short-term scheduling is often referred to as ______.

A)finite capacity scheduling (FCS)
B)infinite capacity scheduling (ICS)
C)regular capacity scheduling (RCS)
D)variable capacity scheduling (VCS)
Question
72)______ steps can be used to implement the theory of constraints,beginning with the bottleneck operation.

A)Two
B)Three
C)Four
D)Five
Question
69)______ is the lot-size quantity of a product processed at a work center.

A)Transfer batch
B)Delivery batch
C)Process batch
D)Product batch
Question
66)In DBR (drum-buffer-rope),which of the following is referred to as the drum?

A)scarce resources
B)inventory
C)raw materials
D)work stations
Question
64)Which of the following statements is FALSE about bottleneck operation?

A)The bottleneck resource should never be kept idle.
B)The bottleneck resource should always be fully staffed.
C)The bottleneck resources should be used to support the nonproductive resources.
D)Production should be synchronized based on the requirement of the bottleneck operation.
Question
70)______ is the quantity of units that is transported from one work center to the next.

A)Transfer batch
B)Delivery batch
C)Process batch
D)Product batch
Question
67)In DBR (drum-buffer-rope),which of the following is the mechanism that synchronizes or subordinates all other resources and decisions to the activities of the drum in order to maximize its effectiveness?

A)drum
B)buffer
C)rope
D)schedule
Question
65)______ is a planning and scheduling method that assumes that within any manufacturing system there are a limited number of scarce resources,and they control the overall output of that system.

A)Finite capacity scheduling
B)Advanced planner and optimizer (APO)
C)Manufacturing execution system (MES)
D)Drum-buffer-rope (DBR)
Question
68)The two different ways of assessing batch sizes developed by Eli Goldratt are ______.

A)process batch and product batch
B)process batch and transfer batch
C)transfer batch and product batch
D)transfer batch and delivery batch
Question
77)From a sustainability perspective,one of the key areas of concern for many manufacturing firms is ______.

A)operating expenses
B)throughput
C)energy consumption
D)excess inventory
Question
63)Resource use in a manufacturing process is typically uneven,and in order to achieve a balanced flow of work through the process,the bottleneck resource should be controlled.This is the basic principle of ______.

A)computerized short-term scheduling
B)theory of constraints
C)Johnson's rule
D)priority rule
Question
62)Which of the following is NOT one of the steps that managers take to mitigate scheduling problems?

A)Lot splitting can be used for large orders when there are significant differences in job processing times.
B)Scheduling should be based on the capacity of the operations that are bottlenecks if there are capacity constraints in the facility.
C)The due dates set for order delivery should be realistic and should take existing loads on work centers and available capacities into account.
D)Scheduling should be focused on customer orders and delivery by due dates.
Question
80)Which of the following is NOT an advantage of the DBR (drum-buffer-rope)method?

A)maximizes the output rate
B)reduces lead times
C)maximizes the need for holding inventory
D)minimizes schedule disruptions
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/100
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 23: Detailed Scheduling
1
16)To minimize the size of queues in intermittent processes,schedulers need to address ______ major issues

A)three
B)four
C)two
D)five
A
2
4)Scheduling decisions have ______ time horizons.

A)long-term
B)intermediate-term
C)short-term
D)prolonged term
C
3
14)______ is concerned with regulating inputs to a work center in relation to output and available capacity so that the queues and waiting times of jobs can be managed and kept under control.

A)Input control
B)Input-output control
C)Process control
D)Capacity control
B
4
18)______ is the assignment of jobs to work or processing centers.

A)Input-output control
B)Sequencing
C)Worker assignment
D)Loading
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
5
7)Which of the following is NOT an objective of scheduling?

A)Resources such as equipment and labor are used effectively.
B)Overall costs are reduced.
C)Work-in-process inventories are maximized.
D)Productivity is increased by maximizing flow of goods and services through the system.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
6
2)Detailed production schedule is the ______ set of decisions in the hierarchy of operations decision for ______ organizations.

A)last,manufacturing
B)first,manufacturing
C)last,service
D)first,service
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
7
12)Products are made to order,and each order has its own unique material and processing requirements,processing sequence,and processing times in ______ processes.

A)intermittent
B)machine
C)line
D)continuous
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
8
5)______ is the process of making specific resources such as labor,equipment,and facilities to produce a product or deliver a service available.

A)Planning
B)Scheduling
C)Forecasting
D)Production
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
9
20)______ type(s)of Gantt charts is/are used for scheduling decisions.

A)One
B)Two
C)Three
D)Four
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
10
17)Which of the following is NOT one of the major issues to be addressed by schedulers in order to reduce the size of the queues in intermittent processes?

A)input-output control
B)loading
C)worker assignment
D)sequencing
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
11
10)______ calculations are used to determine a schedule that allocates the capacity of the line among the several products.

A)Flow time
B)Run time
C)Lead time
D)Runout time
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
12
15)The use of dams in rivers to control water flow is a simple example of ______.

A)water control
B)input-output control
C)process control
D)capacity control
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
13
3)Monthly or weekly service schedule is the ______ set of decisions in the hierarchy of operations decision for ______ organizations.

A)last,manufacturing
B)first,manufacturing
C)last,service
D)first,service
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
14
9)Scheduling for line processes is often referred to as ______.

A)cluster scheduling
B)flow-shop scheduling
C)batch scheduling
D)job-shop scheduling
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
15
11)______ is a form of line process scheduling in which many of the scheduling decisions are predetermined when the production systems are designed.

A)Cluster scheduling
B)Job-shop scheduling
C)Flow-shop scheduling
D)Batch scheduling
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
16
6)Scheduling decisions are typically ______ in scope.

A)extensive
B)widespread
C)narrow
D)broad
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
17
8)______ are high-volume product processes that typically produce standardized products and require identical or similar operations.

A)Line processes
B)Intermittent processes
C)Machine processes
D)Outlier processes
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
18
13)Which of the following statements is true about process scheduling?

A)Line process scheduling is considerably more complex than job-shop scheduling.
B)Line process scheduling and job-shop scheduling have the same level of complexity.
C)Job-shop scheduling is considerably more complex than line process scheduling.
D)It is difficult to determine the complexity of line process scheduling.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
19
1)In the hierarchy of decisions made in the field of operations,detailed scheduling is the ______ step before the actual manufacture of the product or delivery of service.

A)fourth
B)first
C)seventh
D)final
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
20
19)Which of the following is NOT one of the objectives of loading decisions?

A)minimize idle time
B)minimize setup time
C)maximize processing time
D)minimize setup costs
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
21
33)______ are simple decision rules that are used to select jobs for the next operation in order to control the flow of work as jobs progress through a single process,machine,or work center.

A)Scheduling rules
B)Sequencing rules
C)Priority rules
D)Job processing rules
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
22
39)Jobs are ranked according to their due dates,and the job that has the earliest due date is processed first and completed in ______.

A)shortest processing time
B)earliest due date
C)longest processing time
D)critical ratio (CR)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
23
27)A scheduling process used to determine the approximate completion time for each job,the capacity required in each time period by beginning with the current date for those jobs that have known processing requirements,and loading the jobs forward in time is called ______.

A)current-date scheduling
B)forward scheduling
C)due-dates scheduling
D)backward scheduling
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
24
31)Schedules may have to be revised frequently due to factors such as machine breakdowns,processing delays at work centers,and the like.This is the drawback of ______.

A)fixed loading
B)iterative loading
C)finite loading
D)infinite loading
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
25
38)The ______ rule can be applied for scheduling in make-to-stock and make-to-order production systems.

A)shortest processing time
B)earliest due date
C)longest processing time
D)critical ratio (CR)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
26
35)______ is a dynamic sequencing rule that gives priority to those jobs that most urgently need work so that orders can be completed by the due date and shipped on schedule.

A)First come,first served
B)Shortest processing time
C)Critical ratio
D)Earliest due date
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
27
29)In reality,most businesses generally use ______.

A)a combination of forward and backward scheduling
B)forward scheduling only
C)backward scheduling only
D)advanced scheduling
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
28
26)The assignment method is a special case of a group of problems called ______ problems.

A)integer programming
B)network programming
C)work-flow optimization
D)linear programming
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
29
36)The job is behind schedule when ______.

A)CR = 0
B)CR = 1
C)CR > 1
D)CR < 1
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
30
28)A scheduling process used to determine in advance the capacity required at each work center for each time period to complete the jobs by the due dates by beginning with the due date for each job and loading the processing requirements for these jobs at each work center by proceeding backward in time is called ______

A)current-date scheduling
B)forward scheduling
C)due-dates scheduling
D)backward scheduling
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
31
40)The formula for calculating critical ratio is ______.

A)Work remaining / Time remaining
B)Time remaining / Work remaining
C)Cost remaining / Time remaining
D)Time remaining / Cost remaining
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
32
24)______ is a method applied to situations in which various resources must be allocated to activities on a one-to-one basis.

A)Time-series method
B)Assignment method
C)Integer programming
D)Linear analysis
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
33
23)______ charts are used to monitor jobs in progress,show which jobs are on schedule,and which are ahead or behind schedule.

A)Gantt load
B)Gantt schedule
C)Gantt sequence
D)Gantt output
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
34
34)The job that arrived first at a work center or machine will be processed first and completed.Which of the following priority rules does this statement represent?

A)first come,first served
B)shortest processing time
C)critical ratio
D)earliest due date
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
35
32)______ is the process of determining the exact order or priority of job processing.

A)Sequencing
B)Scheduling
C)Prioritizing
D)Job processing
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
36
22)______ charts show the loads on various work centers,equipment,or facilities as well as the associated idle times.

A)Gantt load
B)Gantt schedule
C)Gantt sequence
D)Gantt output
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
37
25)______ is a technique used to optimize an objective (such as maximizing profits or minimizing costs)under certain constraints,such as availability of resources.

A)Integer programming
B)Assignment method
C)Linear programming
D)Work-flow optimization
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
38
37)Critical ratio (CR)= 1 implies ______.

A)the job is completed
B)the job is ahead of schedule
C)the job is on schedule
D)the job is behind schedule
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
39
30)______ is the preferred loading approach in the scheduling phase because it takes into account the actual processing times of jobs and the available capacity at each work center.

A)Finite loading
B)Infinite loading
C)Fixed loading
D)Iterative loading
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
40
21)______ are visual tools that can be used to make decisions in intermittent processes.

A)Gantt charts
B)Assignment methods
C)Pie charts
D)Milestone charts
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
41
41)The job is ahead of schedule when ______.

A)CR = 1
B)CR < 1
C)CR = 0.5
D)CR > 1
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
42
42)Which of the following is NOT an assumption required for the use of priority rules?

A)The set of jobs to be processed is known and does not change.
B)Setup times are dependent on job processing sequence.
C)Setup times and processing times are known and do not vary.
D)There are no unexpected interruptions in job processing.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
43
56)The average tardiness for the job listed in the table below under the longest processing time (LPT)rule is ______. <strong>56)The average tardiness for the job listed in the table below under the longest processing time (LPT)rule is ______.  </strong> A)16 days B)14 days C)15 days D)13 days

A)16 days
B)14 days
C)15 days
D)13 days
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
44
48)______ is the time that the completion of an actual job exceeds its due date.

A)Average job tardiness
B)Average flow time
C)Makespan
D)Processing time
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
45
55)The average flow time for the jobs listed in the table below under the longest processing time (LPT)rule is ______. <strong>55)The average flow time for the jobs listed in the table below under the longest processing time (LPT)rule is ______.  </strong> A)27.4 days B)24.4 days C)23.4 days D)26.7 days

A)27.4 days
B)24.4 days
C)23.4 days
D)26.7 days
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
46
50)Which of the following is NOT a part of the average job flow time?

A)transportation time
B)actual processing time
C)waiting time
D)customer delivery time
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
47
44)______ is the total length of time that a job spends at a work center from the point of arrival to the point where it leaves the work center.

A)Job flow time
B)Job completion time
C)Job tardiness
D)Job processing time
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
48
47)______ is the total time needed to complete a group of jobs starting with the first job until the completion of the last job.

A)Average job tardiness
B)Average flow time
C)Makespan
D)Processing time
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
49
43)Which of the following is NOT a performance evaluation criterion for priority rules?

A)average job flow time
B)average number of jobs in the system
C)average job tardiness
D)average job setup time
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
50
54)Determine the longest processing time (LPT)sequence for the jobs listed in the following table. <strong>54)Determine the longest processing time (LPT)sequence for the jobs listed in the following table.  </strong> A)A-B-C-D-E B)D-B-C-A-E C)D-B-E-C-A D)A-D-C-B-E

A)A-B-C-D-E
B)D-B-C-A-E
C)D-B-E-C-A
D)A-D-C-B-E
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
51
60)______ steps are necessary to implement Johnson's rule.

A)Six
B)Three
C)Four
D)Five
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
52
52)The average tardiness for the jobs listed in the following table under the FCFS (first come,first served)rule is ______. <strong>52)The average tardiness for the jobs listed in the following table under the FCFS (first come,first served)rule is ______.  </strong> A)11 days B)9.8 days C)15 days D)8 days

A)11 days
B)9.8 days
C)15 days
D)8 days
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
53
53)The average number of jobs in the work center for the jobs listed in the following table under the FCFS (first come,first served)rule is ______. <strong>53)The average number of jobs in the work center for the jobs listed in the following table under the FCFS (first come,first served)rule is ______.  </strong> A)3.5 B)2.1 C)3.23 D)2.79

A)3.5
B)2.1
C)3.23
D)2.79
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
54
51)Determine the FCFS (first come,first served)sequence for the jobs listed in the following table.Assume that the jobs have arrived in the order listed in the table. <strong>51)Determine the FCFS (first come,first served)sequence for the jobs listed in the following table.Assume that the jobs have arrived in the order listed in the table.  </strong> A)A-B-C-D-E B)A-C-D-E-B C)B-C-D-E-A D)B-A-C-D-E

A)A-B-C-D-E
B)A-C-D-E-B
C)B-C-D-E-A
D)B-A-C-D-E
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
55
46)The average number of jobs in the system is the surrogate measure for ______.

A)average work-in-process inventory
B)average process inventory
C)average job tardiness
D)average finished goods inventory
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
56
49)Total flow time of all the jobs divided by the number of jobs gives the ______.

A)average processing time
B)average job flow time
C)average job tardiness
D)average job setup time
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
57
45)The formula for calculating the average number of jobs in the system is ______.

A)Total processing time / Makespan
B)Total setup time / Makespan
C)Total flow time / Makespan
D)Makespan / Total processing time
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
58
59)Which of the following is NOT an ideal situation to implement Johnson's rule?

A)There are no work-in-process inventory storage problems.
B)There are no overriding individual job priorities.
C)The same processing sequence is maintained on either processes,machines,or work centers.
D)There are overriding individual job priorities.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
59
58)Which of the following is the objective of Johnson's rule?

A)minimize makespan
B)maximize makespan
C)maximize average flow time
D)minimize critical ratio
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
60
57)For sequencing N jobs through two machines,processes,or work centers in the same order,_________ provides the most efficient method.

A)priority rules
B)Johnson's rule
C)batch rule
D)process rule
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
61
78)Which of the following is FALSE about service environment,typically not encountered in manufacturing environment?

A)It is not possible to store or inventory services.
B)Services are not difficult to schedule because they are not typically labor intensive.
C)The fluctuating demand for services and the need to customize services for individual customers makes scheduling services more difficult.
D)Service schedules are constrained by legal requirements and union contracts.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
62
75)A scheduling system for service organizations that uses computerized systems to maximize customer satisfaction by smoothing out demand for their services in any given time is a(n)______.

A)reservation system
B)prioritization system
C)appointment system
D)capacity utilization system
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
63
73)Which of the following is NOT a performance measure used by theory of constraints to evaluate the effectiveness of improvements?

A)increased throughput
B)reduction in inventory
C)reduction in throughput
D)reduction in operating expense
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
64
74)A scheduling system for a service organization that minimizes customer or client waiting time while maximizing the labor and capacity utilization of the service system by designating specific times for clients to arrive is a(n)______.

A)reservation system
B)prioritization system
C)appointment system
D)capacity utilization system
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
65
76)The process of coordinating scheduling decisions made by any member of a supply chain with the decisions of other supply chain partners is called ______.

A)supply chain scheduling
B)supply partners scheduling
C)decision scheduling
D)hierarchical scheduling
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
66
71)The theory of constraints uses ______ performance measures to evaluate whether the effectiveness of the improvements made has enabled the system to make more money.

A)two
B)three
C)four
D)five
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
67
79)For bottleneck operations the process batch size should be ______ and the transfer batch size should be ______.

A)large,small
B)small,large
C)small,small
D)large,large
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
68
61)Computerized short-term scheduling is often referred to as ______.

A)finite capacity scheduling (FCS)
B)infinite capacity scheduling (ICS)
C)regular capacity scheduling (RCS)
D)variable capacity scheduling (VCS)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
69
72)______ steps can be used to implement the theory of constraints,beginning with the bottleneck operation.

A)Two
B)Three
C)Four
D)Five
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
70
69)______ is the lot-size quantity of a product processed at a work center.

A)Transfer batch
B)Delivery batch
C)Process batch
D)Product batch
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
71
66)In DBR (drum-buffer-rope),which of the following is referred to as the drum?

A)scarce resources
B)inventory
C)raw materials
D)work stations
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
72
64)Which of the following statements is FALSE about bottleneck operation?

A)The bottleneck resource should never be kept idle.
B)The bottleneck resource should always be fully staffed.
C)The bottleneck resources should be used to support the nonproductive resources.
D)Production should be synchronized based on the requirement of the bottleneck operation.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
73
70)______ is the quantity of units that is transported from one work center to the next.

A)Transfer batch
B)Delivery batch
C)Process batch
D)Product batch
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
74
67)In DBR (drum-buffer-rope),which of the following is the mechanism that synchronizes or subordinates all other resources and decisions to the activities of the drum in order to maximize its effectiveness?

A)drum
B)buffer
C)rope
D)schedule
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
75
65)______ is a planning and scheduling method that assumes that within any manufacturing system there are a limited number of scarce resources,and they control the overall output of that system.

A)Finite capacity scheduling
B)Advanced planner and optimizer (APO)
C)Manufacturing execution system (MES)
D)Drum-buffer-rope (DBR)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
76
68)The two different ways of assessing batch sizes developed by Eli Goldratt are ______.

A)process batch and product batch
B)process batch and transfer batch
C)transfer batch and product batch
D)transfer batch and delivery batch
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
77
77)From a sustainability perspective,one of the key areas of concern for many manufacturing firms is ______.

A)operating expenses
B)throughput
C)energy consumption
D)excess inventory
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
78
63)Resource use in a manufacturing process is typically uneven,and in order to achieve a balanced flow of work through the process,the bottleneck resource should be controlled.This is the basic principle of ______.

A)computerized short-term scheduling
B)theory of constraints
C)Johnson's rule
D)priority rule
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
79
62)Which of the following is NOT one of the steps that managers take to mitigate scheduling problems?

A)Lot splitting can be used for large orders when there are significant differences in job processing times.
B)Scheduling should be based on the capacity of the operations that are bottlenecks if there are capacity constraints in the facility.
C)The due dates set for order delivery should be realistic and should take existing loads on work centers and available capacities into account.
D)Scheduling should be focused on customer orders and delivery by due dates.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
80
80)Which of the following is NOT an advantage of the DBR (drum-buffer-rope)method?

A)maximizes the output rate
B)reduces lead times
C)maximizes the need for holding inventory
D)minimizes schedule disruptions
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 100 flashcards in this deck.