Exam 23: Detailed Scheduling
Exam 1: Introduction to Managing Global Operations and Supply Chains97 Questions
Exam 2: Operations and Supply Chain Strategies99 Questions
Exam 3: Project Management100 Questions
Exam 4: Supplement: Project Management100 Questions
Exam 5: Product and Service Innovations100 Questions
Exam 6: Supplement: Reliability98 Questions
Exam 7: Managing for Quality100 Questions
Exam 8: Quality Improvement and Control Tools100 Questions
Exam 9: Capacity Planning100 Questions
Exam 10: Supply Chain Design and Location Planning100 Questions
Exam 11: Process Design and Layout Planning100 Questions
Exam 12: Supplement: Tools for Analyzing, Designing, and Selecting Processes and Layouts99 Questions
Exam 13: Supplier Management100 Questions
Exam 14: Logistics Management100 Questions
Exam 15: Demand Management and Customer Service100 Questions
Exam 16: Demand Forecasting Methods100 Questions
Exam 17: Lean Operations and Supply Chains99 Questions
Exam 18: Inventory Management100 Questions
Exam 19: Inventory Control Models100 Questions
Exam 20: Sales and Operations Planning99 Questions
Exam 21: Master Scheduling and Material Requirements Planning100 Questions
Exam 22: Supplement: Capacity Requirements Planning, MRP II, ERP, and DRP100 Questions
Exam 23: Detailed Scheduling100 Questions
Exam 24: Linear Programming100 Questions
Exam 25: The Transportation Models100 Questions
Exam 26: Waiting Line Models100 Questions
Exam 27: Simulation100 Questions
Exam 28: Learning Curves99 Questions
Exam 29: Decision-Making Tools100 Questions
Select questions type
The theory of constraints uses ______ performance measures to evaluate whether the effectiveness of the improvements made has enabled the system to make more money.
Free
(Multiple Choice)
4.9/5
(30)
Correct Answer:
B
Which of the following is NOT one of the major issues to be addressed by schedulers in order to reduce the size of the queues in intermittent processes?
Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
C
Which of the following is the objective of Johnson's rule?
Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
A
Determine the earliest due date (EDD)sequence for the jobs listed in the following table. Job Processing time §in days\} Due date \{in days from to day's date\} A 5 9 B 11 18 C 3 6 D 12 19 E 10 17
(Multiple Choice)
4.7/5
(42)
Monthly or weekly service schedule is the ______ set of decisions in the hierarchy of operations decision for ______ organizations.
(Multiple Choice)
4.9/5
(30)
To minimize the size of queues in intermittent processes,schedulers need to address ______ major issues
(Multiple Choice)
4.7/5
(39)
______ is the assignment of jobs to work or processing centers.
(Multiple Choice)
4.9/5
(38)
Which of the following is NOT a performance measure used by theory of constraints to evaluate the effectiveness of improvements?
(Multiple Choice)
4.8/5
(35)
______ is the total time needed to complete a group of jobs starting with the first job until the completion of the last job.
(Multiple Choice)
4.9/5
(34)
Which of the following is NOT one of the objectives of loading decisions?
(Multiple Choice)
4.9/5
(46)
A scheduling process used to determine the approximate completion time for each job,the capacity required in each time period by beginning with the current date for those jobs that have known processing requirements,and loading the jobs forward in time is called ______.
(Multiple Choice)
4.8/5
(40)
The average number of jobs in the system is the surrogate measure for ______.
(Multiple Choice)
4.9/5
(34)
Which of the following is NOT one of the steps that managers take to mitigate scheduling problems?
(Multiple Choice)
4.9/5
(37)
In the hierarchy of decisions made in the field of operations,detailed scheduling is the ______ step before the actual manufacture of the product or delivery of service.
(Multiple Choice)
4.8/5
(33)
The process of coordinating scheduling decisions made by any member of a supply chain with the decisions of other supply chain partners is called ______.
(Multiple Choice)
4.7/5
(36)
Which of the following statements is true about the assignment method?
(Multiple Choice)
4.7/5
(28)
______ steps can be used to implement the theory of constraints,beginning with the bottleneck operation.
(Multiple Choice)
4.8/5
(32)
The use of dams in rivers to control water flow is a simple example of ______.
(Multiple Choice)
4.7/5
(35)