Exam 23: Detailed Scheduling

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The theory of constraints uses ______ performance measures to evaluate whether the effectiveness of the improvements made has enabled the system to make more money.

Free
(Multiple Choice)
4.9/5
(30)
Correct Answer:
Verified

B

Which of the following is NOT one of the major issues to be addressed by schedulers in order to reduce the size of the queues in intermittent processes?

Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
Verified

C

Which of the following is the objective of Johnson's rule?

Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
Verified

A

Determine the earliest due date (EDD)sequence for the jobs listed in the following table. Job Processing time §in days\} Due date \{in days from to day's date\} A 5 9 B 11 18 C 3 6 D 12 19 E 10 17

(Multiple Choice)
4.7/5
(42)

Monthly or weekly service schedule is the ______ set of decisions in the hierarchy of operations decision for ______ organizations.

(Multiple Choice)
4.9/5
(30)

To minimize the size of queues in intermittent processes,schedulers need to address ______ major issues

(Multiple Choice)
4.7/5
(39)

______ is the assignment of jobs to work or processing centers.

(Multiple Choice)
4.9/5
(38)

Which of the following is NOT a performance measure used by theory of constraints to evaluate the effectiveness of improvements?

(Multiple Choice)
4.8/5
(35)

In reality,most businesses generally use ______.

(Multiple Choice)
4.9/5
(46)

______ is the total time needed to complete a group of jobs starting with the first job until the completion of the last job.

(Multiple Choice)
4.9/5
(34)

Which of the following is NOT one of the objectives of loading decisions?

(Multiple Choice)
4.9/5
(46)

A scheduling process used to determine the approximate completion time for each job,the capacity required in each time period by beginning with the current date for those jobs that have known processing requirements,and loading the jobs forward in time is called ______.

(Multiple Choice)
4.8/5
(40)

The average number of jobs in the system is the surrogate measure for ______.

(Multiple Choice)
4.9/5
(34)

Which of the following is NOT one of the steps that managers take to mitigate scheduling problems?

(Multiple Choice)
4.9/5
(37)

In the hierarchy of decisions made in the field of operations,detailed scheduling is the ______ step before the actual manufacture of the product or delivery of service.

(Multiple Choice)
4.8/5
(33)

The process of coordinating scheduling decisions made by any member of a supply chain with the decisions of other supply chain partners is called ______.

(Multiple Choice)
4.7/5
(36)

Which of the following statements is true about the assignment method?

(Multiple Choice)
4.7/5
(28)

______ steps can be used to implement the theory of constraints,beginning with the bottleneck operation.

(Multiple Choice)
4.8/5
(32)

The use of dams in rivers to control water flow is a simple example of ______.

(Multiple Choice)
4.7/5
(35)

The job is behind schedule when ______.

(Multiple Choice)
4.8/5
(35)
Showing 1 - 20 of 100
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)