Deck 4: Managing Conflict and the Art of Negotiation

Full screen (f)
exit full mode
Question
After identifying the stakeholders,a _________should be created to maintain key information about them including contact information,their requirements and expectations,what stage in the project they have the most interest in,and so on.

A)stakeholder register
B)stakeholder plan
C)project plan
D)request for proposal
Use Space or
up arrow
down arrow
to flip the card.
Question
The need to manage interfaces and to correct incompatibilities is likely to create technical conflicts during the __________ phase of the project lifecycle.

A)project formation
B)project buildup
C)main program
D)project phase out
Question
During project build-up,the project should move from a general concept to __________.

A)implementation of plans
B)a highly detailed set of plans
C)a project charter
D)a project contract
Question
During project build-up,if the project is independent and standalone,the project manager seeks a commitment of __________ from the functional departments.

A)work
B)materials
C)people
D)budgets
Question
__________ is the process which begins when one party perceives that the other has frustrated,or is about to frustrate,some concern of his.

A)Conflict
B)Happiness
C)Contentment
D)Utility
Question
__________ problems are comparatively rare during project phase-out because most have been solved or bypassed earlier.

A)Resource
B)Schedule
C)Authority
D)Technical
Question
During the main program phases of the project lifecycle,the conflict intensity is the greatest with respect to __________.

A)cost
B)schedules
C)scope
D)quality
Question
There are probably more opportunities for __________ in handling conflicts and negotiations than in any other aspect of project management.

A)errors in judgment
B)ethical missteps
C)project team strife
D)project manager burnout
Question
Personality conflicts during project phase-out are often caused by __________.

A)the absence of deadlines
B)the influx of newer technology
C)pressure to complete the project and anxiety about leaving the project
D)distribution of expenses charged to the project
Question
Before the goals of the shareholders can be aligned with the purpose of the project,the ____________ must be identified.

A)risks
B)costs
C)stakeholders
D)quality
Question
The most common method of identifying stakeholders is _____.

A)expert judgment of the project manager and project team
B)surveying all users
C)sending out invitations
D)using corporate guidelines
Question
A party to a conflict will usually be satisfied when the level of frustration has been __________.

A)increased by the domination of the other party
B)lowered to the point where no action against the other party is contemplated
C)lowered because the party realizes the hopelessness of continuing the conflict
D)eliminated because the party has surrendered to the other party
Question
A useful tool for accessing the level of commitment needed from stakeholders is the ____________.

A)Commitment Assessment Matrix
B)Power-Interest Grid
C)Stakeholder Survey
D)Administrative Matrix
Question
Which of the following are not strategies people use to deal with conflict identified by Thomas and Kilmann?

A)Competing
B)Avoiding
C)Collaborating
D)Forcing
Question
Toward the end of the project lifecycle,conflict intensity is the greatest with respect to __________.

A)cost
B)schedules
C)scope
D)quality
Question
Identify the category of conflict that is not included in the categories used by Thamhain and Wilemon in their study of project conflict.

A)Differences about goal / expectations
B)Uncertainty about authority
C)Interpersonal problems
D)Discipline / problem-orientation differences
Question
During the early program phases of the project lifecycle,Thamhain says that conflict intensity is the greatest with respect to __________.

A)cost
B)human resource management
C)time
D)priorities
Question
During project formation,the organizational structure selected will have a major impact on the ways in which conflicts are handled.Lack of clarity about the relative power / influence / authority of the PM and the functional managers is a major component of all conflicts involving __________.

A)contractual obligations
B)property rights
C)budgeting
D)resource allocation and scheduling
Question
During project build-up,if the project is functionally tied down,the project manager seeks a commitment of __________ from the functional departments.

A)work
B)materials
C)people
D)budgets
Question
Most of the conflicts that involve the organization and outsiders have to do with __________.

A)interpersonal differences
B)cultural differences and status differences
C)technical differences
D)property rights and contractual obligations
Question
One requirement for the conflict / resolution methods described is that they must allow the conflict to be settled without __________ to the project's objectives.

A)an increase
B)resolution
C)significance
D)irreparable harm
Question
Partnering is an attempt to __________ the risk associated with subcontracting.

A)mitigate
B)increase
C)absorb
D)allow
Question
Which of the following is not one of the four points of principled negotiation?

A)Insist on using objective criteria
B)Focus on interest not positions
C)Invent options for mutual gain before trying to reach an agreement
D)Separate people from the problem
Question
The boundaries between departments or functions represent __________.

A)interfaces
B)challenges
C)Pareto locations
D)risk mitigation
Question
What is the key to finding a negotiator's interests and concerns when he or she states a position? You should ask __________ the interest or concern is important.

A)why
B)when
C)where
D)if
Question
When dealing with conflict between parties,it is recommended that one __________ in order to avoid the conflict becoming interpersonal.

A)avoid the situation
B)define the substantive problem
C)leisurely discuss the issue
D)focus on interests
Question
__________ is a method of transforming contractual relationships into a cohesive,cooperative project team with a single set of goals and established procedures for resolving disputes in a timely and effective manner.

A)Project mentoring
B)Project delving
C)Project partnering
D)Pareto analysis
Question
According to the authors; which of the entities below is not a party to the chartering process?

A)The project manager
B)The customer
C)Senior management
D)Functional managers
Question
Negotiating to a(n)__________ solution is the key to conflict resolution in project management.

A)win-lose
B)win-win
C)avoidance
D)confrontation
Question
According to the authors,the favored technique for resolving conflict is __________.

A)negotiation
B)mitigation
C)avoidance
D)collaboration
Question
Which of the following is not included in the authors' four part agreement for partnering?

A)Continuous senior management support
B)A method for resolution of problems and disagreements
C)Joint evaluation of the project's progress
D)A set of team building exercises
Question
Which one of the following choices was not identified by the authors as one of the reasons why organizations enter into partnership arrangements with each other?

A)Avoidance of litigation
B)Diversification of technical risk
C)Reducing internal conflict
D)Avoidance of capital investment
Question
The total level of conflict in the project lifecycle is highest during the __________ stage.

A)closing
B)main program
C)project build-up
D)project formation
Question
The general objective of a __________ solution to conflict is to find a solution such that no party can be made better off without making another party worse off by the same amount or more.

A)mitigation
B)Pareto-optimal
C)win-win
D)compromising
Question
Conflicts within the organization typically differ from conflicts with outsiders in one important way.As far as the organization is concerned,these conflicts are __________.

A)conflicts between opponents
B)conflicts between allies
C)conflicts between microcultures
D)conflicts between subcultures
Question
If a resource conflict arises between two high-priority projects,precedence is typically given to the project with the __________.

A)earliest due date
B)fastest completion time
C)biggest revenue stream
D)lowest cost to complete
Question
According to the authors,the nature of negotiation as it applies to project management is the realization that few of the conflicts arising in projects have to do with __________.

A)whether or not the task will be done
B)the precise design of the deliverable
C)how the design will be achieved
D)who will do the work,when,and at what cost.
Question
A(n)__________ is simply a written agreement between the PM,senior management,and the functional managers who are committing resources and / or people to the project.

A)project charter
B)project summary
C)scope plan
D)partner agreement
Question
There are several words that are synonyms for negotiate.Which of the following is not quoted by the authors?

A)Arbitrate
B)Bicker
C)Conciliate
D)Haggle
Question
The authors mention three situations where the highest level of negotiating skill is required by the project manager.Which of the following is not one of them?

A)getting personnel from the functional manager
B)using subcontractors
C)changing project deliverables in midstream
D)using input from multiple functional units in developing the project mission
Question
Principled negotiation is defined by four points.Match each point with its description.

A)Separate the people from the problem
B)Focus on interests,not positions
C)Before trying to reach agreement,invent options for mutual gain
D)Insist on using objective criteria
1)Effort should be devoted to finding a wide variety of possible solutions-or elements thereof-that advance the mutual interests of the conflicting parties.
2)To minimize the likelihood that the conflict will become strictly interpersonal,the substantive problem should be carefully defined.Then everyone can work on it rather than each other.
3)Attention should be given to finding standards that can be used to determine the quality of an outcome.
4)Knowledge of the other party's interests allows a negotiator to suggest solutions that satisfy the other party's interests without agreeing with the other's position.
Question
List and describe the three basic causes for change in projects.
Question
Identify three basic causes for change in projects.
Question
Identify the three fundamental categories of conflict that occur during a project's lifecycle.
Question
The __________ approach to negotiation states immediate wants on the assumption that the environment is static.

A)principled
B)positional
C)stakeholder
D)pareto
Question
The __________ approach to negotiation aims to achieve a win-win result.

A)principled
B)positional
C)stakeholder
D)pareto
Question
Thomas and Kilmann identified five strategies people use to deal with conflict.List and briefly describe these.
Question
Describe the multistep process for building partnered projects.
Question
__________ refers to communications across lines of equivalent authority.

A)Lateral relations
B)Interfacing
C)Peering
D)Logical relations
Question
Describe the type of relations that generally exist between the organization carrying out the project and a subcontractor working on the project.
Question
Using the Power-Interest Grid,match up these two dimensions of stakeholders with the appropriate relationship with the project manager.

A)Low power,low interest
B)High power,low interest
C)High interest,low power
D)High interest,high power
1)Monitor
2)Keep informed
3)Closely manage
4)Keep satisfied
Question
List and describe the five strategies people use to deal with conflict.
Question
Describe the four points of principled negotiation described by Fisher.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/53
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 4: Managing Conflict and the Art of Negotiation
1
After identifying the stakeholders,a _________should be created to maintain key information about them including contact information,their requirements and expectations,what stage in the project they have the most interest in,and so on.

A)stakeholder register
B)stakeholder plan
C)project plan
D)request for proposal
A
2
The need to manage interfaces and to correct incompatibilities is likely to create technical conflicts during the __________ phase of the project lifecycle.

A)project formation
B)project buildup
C)main program
D)project phase out
C
3
During project build-up,the project should move from a general concept to __________.

A)implementation of plans
B)a highly detailed set of plans
C)a project charter
D)a project contract
B
4
During project build-up,if the project is independent and standalone,the project manager seeks a commitment of __________ from the functional departments.

A)work
B)materials
C)people
D)budgets
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
5
__________ is the process which begins when one party perceives that the other has frustrated,or is about to frustrate,some concern of his.

A)Conflict
B)Happiness
C)Contentment
D)Utility
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
6
__________ problems are comparatively rare during project phase-out because most have been solved or bypassed earlier.

A)Resource
B)Schedule
C)Authority
D)Technical
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
7
During the main program phases of the project lifecycle,the conflict intensity is the greatest with respect to __________.

A)cost
B)schedules
C)scope
D)quality
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
8
There are probably more opportunities for __________ in handling conflicts and negotiations than in any other aspect of project management.

A)errors in judgment
B)ethical missteps
C)project team strife
D)project manager burnout
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
9
Personality conflicts during project phase-out are often caused by __________.

A)the absence of deadlines
B)the influx of newer technology
C)pressure to complete the project and anxiety about leaving the project
D)distribution of expenses charged to the project
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
10
Before the goals of the shareholders can be aligned with the purpose of the project,the ____________ must be identified.

A)risks
B)costs
C)stakeholders
D)quality
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
11
The most common method of identifying stakeholders is _____.

A)expert judgment of the project manager and project team
B)surveying all users
C)sending out invitations
D)using corporate guidelines
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
12
A party to a conflict will usually be satisfied when the level of frustration has been __________.

A)increased by the domination of the other party
B)lowered to the point where no action against the other party is contemplated
C)lowered because the party realizes the hopelessness of continuing the conflict
D)eliminated because the party has surrendered to the other party
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
13
A useful tool for accessing the level of commitment needed from stakeholders is the ____________.

A)Commitment Assessment Matrix
B)Power-Interest Grid
C)Stakeholder Survey
D)Administrative Matrix
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
14
Which of the following are not strategies people use to deal with conflict identified by Thomas and Kilmann?

A)Competing
B)Avoiding
C)Collaborating
D)Forcing
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
15
Toward the end of the project lifecycle,conflict intensity is the greatest with respect to __________.

A)cost
B)schedules
C)scope
D)quality
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
16
Identify the category of conflict that is not included in the categories used by Thamhain and Wilemon in their study of project conflict.

A)Differences about goal / expectations
B)Uncertainty about authority
C)Interpersonal problems
D)Discipline / problem-orientation differences
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
17
During the early program phases of the project lifecycle,Thamhain says that conflict intensity is the greatest with respect to __________.

A)cost
B)human resource management
C)time
D)priorities
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
18
During project formation,the organizational structure selected will have a major impact on the ways in which conflicts are handled.Lack of clarity about the relative power / influence / authority of the PM and the functional managers is a major component of all conflicts involving __________.

A)contractual obligations
B)property rights
C)budgeting
D)resource allocation and scheduling
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
19
During project build-up,if the project is functionally tied down,the project manager seeks a commitment of __________ from the functional departments.

A)work
B)materials
C)people
D)budgets
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
20
Most of the conflicts that involve the organization and outsiders have to do with __________.

A)interpersonal differences
B)cultural differences and status differences
C)technical differences
D)property rights and contractual obligations
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
21
One requirement for the conflict / resolution methods described is that they must allow the conflict to be settled without __________ to the project's objectives.

A)an increase
B)resolution
C)significance
D)irreparable harm
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
22
Partnering is an attempt to __________ the risk associated with subcontracting.

A)mitigate
B)increase
C)absorb
D)allow
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
23
Which of the following is not one of the four points of principled negotiation?

A)Insist on using objective criteria
B)Focus on interest not positions
C)Invent options for mutual gain before trying to reach an agreement
D)Separate people from the problem
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
24
The boundaries between departments or functions represent __________.

A)interfaces
B)challenges
C)Pareto locations
D)risk mitigation
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
25
What is the key to finding a negotiator's interests and concerns when he or she states a position? You should ask __________ the interest or concern is important.

A)why
B)when
C)where
D)if
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
26
When dealing with conflict between parties,it is recommended that one __________ in order to avoid the conflict becoming interpersonal.

A)avoid the situation
B)define the substantive problem
C)leisurely discuss the issue
D)focus on interests
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
27
__________ is a method of transforming contractual relationships into a cohesive,cooperative project team with a single set of goals and established procedures for resolving disputes in a timely and effective manner.

A)Project mentoring
B)Project delving
C)Project partnering
D)Pareto analysis
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
28
According to the authors; which of the entities below is not a party to the chartering process?

A)The project manager
B)The customer
C)Senior management
D)Functional managers
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
29
Negotiating to a(n)__________ solution is the key to conflict resolution in project management.

A)win-lose
B)win-win
C)avoidance
D)confrontation
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
30
According to the authors,the favored technique for resolving conflict is __________.

A)negotiation
B)mitigation
C)avoidance
D)collaboration
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following is not included in the authors' four part agreement for partnering?

A)Continuous senior management support
B)A method for resolution of problems and disagreements
C)Joint evaluation of the project's progress
D)A set of team building exercises
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
32
Which one of the following choices was not identified by the authors as one of the reasons why organizations enter into partnership arrangements with each other?

A)Avoidance of litigation
B)Diversification of technical risk
C)Reducing internal conflict
D)Avoidance of capital investment
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
33
The total level of conflict in the project lifecycle is highest during the __________ stage.

A)closing
B)main program
C)project build-up
D)project formation
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
34
The general objective of a __________ solution to conflict is to find a solution such that no party can be made better off without making another party worse off by the same amount or more.

A)mitigation
B)Pareto-optimal
C)win-win
D)compromising
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
35
Conflicts within the organization typically differ from conflicts with outsiders in one important way.As far as the organization is concerned,these conflicts are __________.

A)conflicts between opponents
B)conflicts between allies
C)conflicts between microcultures
D)conflicts between subcultures
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
36
If a resource conflict arises between two high-priority projects,precedence is typically given to the project with the __________.

A)earliest due date
B)fastest completion time
C)biggest revenue stream
D)lowest cost to complete
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
37
According to the authors,the nature of negotiation as it applies to project management is the realization that few of the conflicts arising in projects have to do with __________.

A)whether or not the task will be done
B)the precise design of the deliverable
C)how the design will be achieved
D)who will do the work,when,and at what cost.
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
38
A(n)__________ is simply a written agreement between the PM,senior management,and the functional managers who are committing resources and / or people to the project.

A)project charter
B)project summary
C)scope plan
D)partner agreement
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
39
There are several words that are synonyms for negotiate.Which of the following is not quoted by the authors?

A)Arbitrate
B)Bicker
C)Conciliate
D)Haggle
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
40
The authors mention three situations where the highest level of negotiating skill is required by the project manager.Which of the following is not one of them?

A)getting personnel from the functional manager
B)using subcontractors
C)changing project deliverables in midstream
D)using input from multiple functional units in developing the project mission
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
41
Principled negotiation is defined by four points.Match each point with its description.

A)Separate the people from the problem
B)Focus on interests,not positions
C)Before trying to reach agreement,invent options for mutual gain
D)Insist on using objective criteria
1)Effort should be devoted to finding a wide variety of possible solutions-or elements thereof-that advance the mutual interests of the conflicting parties.
2)To minimize the likelihood that the conflict will become strictly interpersonal,the substantive problem should be carefully defined.Then everyone can work on it rather than each other.
3)Attention should be given to finding standards that can be used to determine the quality of an outcome.
4)Knowledge of the other party's interests allows a negotiator to suggest solutions that satisfy the other party's interests without agreeing with the other's position.
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
42
List and describe the three basic causes for change in projects.
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
43
Identify three basic causes for change in projects.
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
44
Identify the three fundamental categories of conflict that occur during a project's lifecycle.
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
45
The __________ approach to negotiation states immediate wants on the assumption that the environment is static.

A)principled
B)positional
C)stakeholder
D)pareto
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
46
The __________ approach to negotiation aims to achieve a win-win result.

A)principled
B)positional
C)stakeholder
D)pareto
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
47
Thomas and Kilmann identified five strategies people use to deal with conflict.List and briefly describe these.
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
48
Describe the multistep process for building partnered projects.
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
49
__________ refers to communications across lines of equivalent authority.

A)Lateral relations
B)Interfacing
C)Peering
D)Logical relations
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
50
Describe the type of relations that generally exist between the organization carrying out the project and a subcontractor working on the project.
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
51
Using the Power-Interest Grid,match up these two dimensions of stakeholders with the appropriate relationship with the project manager.

A)Low power,low interest
B)High power,low interest
C)High interest,low power
D)High interest,high power
1)Monitor
2)Keep informed
3)Closely manage
4)Keep satisfied
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
52
List and describe the five strategies people use to deal with conflict.
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
53
Describe the four points of principled negotiation described by Fisher.
Unlock Deck
Unlock for access to all 53 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 53 flashcards in this deck.