Gross requirements for components are equal to the gross requirements of their immediate parent multiplied by the quantity per parent.
Use Space or
up arrow
down arrow
to flip the card.
Question
The master production schedule (MPS)states which end items are to be produced.
Question
The planned-order releases at one level of an MRP plan determine the gross requirements at the next level down in the bill of material.
Question
A bill of material contains a listing of all the raw materials,parts,and subassemblies needed to produce one unit of an end item.
Question
A phantom bill is a special type of bill of material that is a combination of the bill of materials for a number of subassemblies.
Question
Lumpy demand for components required for finished goods results primarily from the periodic scheduling of batch production of the goods.
Question
An assembly-time chart indicates gross and net requirements.
Question
The term pegging refers to identifying the parent items that have generated a given set of requirements for a part or subassembly.
Question
Dependent demand is derived demand.
Question
For a given component in an MRP plan,under lot-for-lot ordering,planned order sizes are equal to net requirements.
Question
The planning horizon for the master production schedule (MPS)should cover or be longer than the cumulative lead time necessary to produce the end items.
Question
Independent demand tends to be more sporadic or "lumpy" than dependent demand.
Question
The bill of material contains information on lead times.
Question
The three basic inputs of MRP are:
1)the bill of material; 2)inventory on hand,open orders and lead times; and 3)planned order releases.
Question
The master production schedule (MPS)states which product components are to be produced.
Question
MRP requires information on inventory on hand,open orders and lead times and purchase orders for each item in stock.
Question
A master production schedule (MPS)is the principal output developed from MRP systems.
Question
Dependent demand tends to be intermittent,whereas independent demand tends to be more stable.
Question
The MRP requires a list of the individual parts that will be converted to finished goods.
Question
MRP usually involves inventory items that have independent demand.
Question
ERP systems are based on software modules for various functional areas of a business such as purchasing,production planning,and supply chain management.
Question
A regenerative MRP is one that is updated continuously.
Question
Safety time is sometimes used in MRP rather than safety stock.
Question
Typically the total cost of ownership (TCO)of ERP systems is clearly detailed and certain at the time a company makes the investment to acquire a system.
Question
The emergence of ERP systems was primarily because they are less complex to use than MRP systems.
Question
A net-change MRP is one that involves periodically updating all aspects of an MRP system.
Question
MRP II is simply a label for current,more advanced versions of software applications for MRP.
Question
ERP packages are intended to fit established ways of doing business,but some modifications to business processes or the ERP software are typically required.
Question
Load reports compare planned capacity requirements with projected capacity and availability.
Question
The part-period method for lot sizing attempts to balance setup and holding costs.
Question
Load reports of capacity may be misleading as they do not consider queuing delays.
Question
For relatively stable situations,a net-change MRP is better suited than using regenerative MRP.
Question
Lot-for-lot ordering in MRP provides coverage for some predetermined number of periods.
Question
ERP involves software that is used to manage and coordinate all the resources,information,and functions of an organization from a shared database.
Question
Load reports show capacity requirements for departments or work centres.
Question
Fixed-interval ordering in MRP places orders that cover a predetermined number of periods.
Question
MRP II involves an expanded approach to production planning and scheduling than MRP.
Question
The part-period method for lot sizing breaks the time periods into smaller units of time to create daily or hourly production schedules.
Question
One of the primary reports of MRP concerns changes to open orders.
Question
Configuring the ERP software involves reengineering established business processes to align with the ERP's procedural settings.
Question
The development and application of MRP is primarily associated with two developments: (1)managers recognizing the need to differentiate between independent and dependent demand,and (2)___________.

A) increased reliance on computers for record keeping
B) development of the EOQ model
C) the need for inventory control systems
D) the emergence of ERP systems
E) accounting systems
Question
Which is true of a net-change MRP?

A) It is a batch-type system which is updated periodically.
B) It generates exception reports.
C) The basic production plan is modified to reflect changes as they occur.
D) It is used to authorize the execution of planned orders.
E) It indicates the amount and timing of future changes.
Question
The MRP approach that immediately updates only those records directly affected by a change is referred to as a(n):

A) regenerative MRP.
B) batch-type MRP.
C) Plossl-Wright system.
D) net-change MRP.
E) gross-change MRP.
Question
The hierarchical diagram that depicts the subassemblies and components that are needed to produce and/or assemble a product is called a(n):

A) assembly time chart.
B) product structure tree.
C) MRP II.
D) pegging.
E) none of the choices.
Question
Independent demand tends to be ___________,while dependent demand tends to be __________.

A) unstable; smooth
B) unstable; stable
C) stable; lumpy
D) smooth; sawtooth
E) sawtooth; smooth
Question
Periodic updating of an MRP system to account for all changes which have occurred within a given time interval is called:

A) pegging.
B) planned order releases.
C) net-change MRP.
D) regenerative MRP.
E) exception report.
Question
In an MRP master production schedule,the planning horizon is often separated into a series of times periods called:

A) pegging.
B) lead times.
C) stacked lead times.
D) time buckets.
E) None of the choices.
Question
A process designed to handle purchasing and scheduling the production of dependent-demand components is:

A) economic part-period (EPP).
B) lot-for-lot (LFL).
C) economic order quantity (EOQ).
D) material requirements planning (MRP).
E) economic run size (ERS).
Question
Which one of the following is not an input in an MRP system?

A) Planned-order releases
B) Bill of materials
C) Master production schedules
D) Inventory on-hand, open orders and lead times
E) All are inputs
Question
The gross requirements of a given part or component are determined from:

A) net requirements + amount on-hand.
B) gross requirements of the immediate parent(s).
C) planned order releases of the end item.
D) net requirements of the end item.
E) planned order release of the immediate parent(s).
Question
Ignoring the possibility of safety stock requirements,which one of the following most closely describes the calculation of net requirements for an item in MRP?

A) Gross requirements - projected on-hand - scheduled receipts
B) Gross requirements - scheduled receipts
C) Gross requirements - order releases + amount on-hand
D) Gross requirements - planned order releases
E) Gross requirements -projected on-hand + planned order releases
Question
ERP automates the tasks involved in performing a business process,such as order fulfilment and financial reporting.
Question
In MRP processing the difference between a planned-order release and the planned-order receipt is:

A) level of safety stock.
B) scheduled receipts of open orders.
C) timing as per the lead time.
D) a one is a forecast and the other is actual.
E) the level of net requirements.
Question
In MRP,under lot-for-lot ordering,the size of "planned-order receipts" are equal to:

A) "scheduled receipts."
B) "planned-order releases."
C) open orders already scheduled to be delivered.
D) "gross requirements."
E) None of the choices.
Question
In MRP,"scheduled receipts" are:

A) identical to "planned-order receipts."
B) identical to "planned-order releases."
C) open orders already scheduled to be delivered.
D) "net requirements" in a time period.
E) None of the choices.
Question
Which of these products and services would be most likely to have dependent demand?

A) Automobiles
B) Frozen vegetables
C) Flowers
D) Lumber
E) None of the choices
Question
Which of the following most closely describes dependent demand?

A) Demand generated by suppliers.
B) Sales forecasts.
C) Derived demand.
D) Demands placed on suppliers by their customers.
E) Net material requirements.
Question
The input used in MRP that lists the assemblies,subassemblies,parts,and raw materials needed to produce one unit of finished product is the:

A) master production schedule.
B) bill of material.
C) inventory-records.
D) assembly-time chart.
E) net-requirements chart.
Question
Pegging is used primarily for which one of the following purposes?

A) Identifying parent items that have generated a certain set of requirements for an item.
B) Identifying the supplier of a given component.
C) Identifying the supplier of a given component's parent.
D) Periodically update material requirements as conditions change.
E) Obtaining exception reports due to periodic changes in material requirements.
Question
The MRP input stating which end items are to be produced,when they are needed,and what quantities are needed,is the:

A) master production schedule.
B) bill-of-materials.
C) inventory-records.
D) assembly-time chart.
E) net-requirements chart.
Question
If the firm is using lot size for a fixed period of two,what is the order size for the first order?

A) 120
B) 200
C) 280
D) 160
E) 150
Question
What is the economic part-period (EPP)for ordering this item?

A) 2
B) 50
C) 100
D) 150
E) 200
Question
What is the lot size for the second order using the part-period method?

A) 80
B) 150
C) 170
D) 250
E) 230
Question
Which of the following are accurate statements concerning MPS,MRP and capacity requirements planning (CRP)?
I)CRP is equivalent to a master production schedule (MPS).
II)CRP is needed to determine if an MPS is feasible.
III)CRP is an input to MRP.
IV)Planned-order releases from MRP are the inputs for CRP.

A) I and II
B) I, II, and III
C) II and IV
D) II, III, and IV
E) I, II, III, and IV
Question
What is the net requirement for Whatzats to fill this order?

A) 100
B) 140
C) 150
D) 180
E) 200
Question
If 40 Ps are needed,and on-hand inventory consists of 15 Ps and 10 each of all other components and subassemblies,how many Cs are needed?

A) 340
B) 350
C) 380
D) 400
E) 590
Question
When should an order for Wherezats be released?

A) At the start of week 2.
B) At the start of week 3.
C) At the start of week 4.
D) At the start of week 5.
E) At the start of week 6.
Question
A report that compares known and expected future capacity requirements with projected available capacity is a:

A) master production schedule.
B) bill of material report.
C) inventory status report.
D) MRP schedule.
E) load report.
Question
If 17 Ps are needed,and no on-hand inventory exists,how many Cs will be needed?

A) 8
B) 16
C) 136
D) 204
E) 272
Question
How many Wherezats should be ordered?

A) 400
B) 450
C) 500
D) 550
E) 600
Question
Under fixed-interval lot sizing,order sizes for component parts are determined based on which one of the following?

A) Gross requirements for one period.
B) Net requirements for some predetermined number of periods.
C) Economic order quantity for one period.
D) Gross requirements - net requirements for a predetermined number of periods.
E) Net requirements - amount on-hand for a predetermined number of periods.
Question
Using the product-tree shown,determine the following:
(i)the quantity of component K that will be needed to assemble 80 units of P,assuming no on-hand inventory exists.
(ii)the quantity of component K needed to assemble 80 units of P,given on-hand inventory of 30 A's,50 B's and 20 C's.
Using the product-tree shown,determine the following: (i)the quantity of component K that will be needed to assemble 80 units of P,assuming no on-hand inventory exists. (ii)the quantity of component K needed to assemble 80 units of P,given on-hand inventory of 30 A's,50 B's and 20 C's.  <div style=padding-top: 35px>
Question
If 17 Ps are needed,and on-hand inventory consists of 10 As,15 Bs,20 Cs,12 Ms and 5 Ns,how many Cs are needed?

A) 48
B) 144
C) 192
D) 212
E) 272
Question
What is the correct sequence to go from the broadest to the most detailed form of operations planning?

A) MRP » MPS » ERP
B) ERP » MRP » MPS
C) ERP » MPS » MRP
D) MPS » ERP » MRP
E) MPS » MRP » ERP
Question
Budget overruns when implementing ERP systems are typically caused by:
I)high equipment costs.
II)high training costs.
III)high capital interest charges.
IV)costs of integrating and testing

A) I only
B) I and III only
C) I, II, IV only
D) II and IV only
E) I, II, and IV only
Question
Which action can managers take if capacity requirements planning (CRP)indicate one or more work stations are projected to be under loaded or over loaded?

A) Shifting some orders to adjacent periods.
B) Transferring employees from other areas.
C) Scheduling overtime.
D) Revise the MPS and MRP.
E) All of the choices are options.
Question
Which one of the following most closely describes the MRP approach that is used for components or subassemblies to compensate for variations in lead time?

A) Pegging
B) Safety stock
C) Increased order sizes
D) Safety time
E) Low-level coding
Question
Which of the following are primary reports provided by MRP systems?
I)Planned order releases
II)Immediate order releases
III)Demand history reports
IV)Changes to open orders

A) I and II only
B) I, II, III only
C) I, II, IV only
D) II, III, IV only
E) I, II, III, and IV
Question
What is the part-period method lot size for the order for the first period?

A) 120
B) 200
C) 280
D) 350
E) 450
Question
For which period will the second order be submitted using the part period lot sizing method?

A) Period 2
B) Period 3
C) Period 4
D) Period 5
E) Period 6
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/84
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 14: Material Requirements Planning and Enterprise Resource Planning
1
Gross requirements for components are equal to the gross requirements of their immediate parent multiplied by the quantity per parent.
False
2
The master production schedule (MPS)states which end items are to be produced.
True
3
The planned-order releases at one level of an MRP plan determine the gross requirements at the next level down in the bill of material.
True
4
A bill of material contains a listing of all the raw materials,parts,and subassemblies needed to produce one unit of an end item.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
5
A phantom bill is a special type of bill of material that is a combination of the bill of materials for a number of subassemblies.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
6
Lumpy demand for components required for finished goods results primarily from the periodic scheduling of batch production of the goods.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
7
An assembly-time chart indicates gross and net requirements.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
8
The term pegging refers to identifying the parent items that have generated a given set of requirements for a part or subassembly.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
9
Dependent demand is derived demand.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
10
For a given component in an MRP plan,under lot-for-lot ordering,planned order sizes are equal to net requirements.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
11
The planning horizon for the master production schedule (MPS)should cover or be longer than the cumulative lead time necessary to produce the end items.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
12
Independent demand tends to be more sporadic or "lumpy" than dependent demand.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
13
The bill of material contains information on lead times.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
14
The three basic inputs of MRP are:
1)the bill of material; 2)inventory on hand,open orders and lead times; and 3)planned order releases.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
15
The master production schedule (MPS)states which product components are to be produced.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
16
MRP requires information on inventory on hand,open orders and lead times and purchase orders for each item in stock.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
17
A master production schedule (MPS)is the principal output developed from MRP systems.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
18
Dependent demand tends to be intermittent,whereas independent demand tends to be more stable.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
19
The MRP requires a list of the individual parts that will be converted to finished goods.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
20
MRP usually involves inventory items that have independent demand.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
21
ERP systems are based on software modules for various functional areas of a business such as purchasing,production planning,and supply chain management.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
22
A regenerative MRP is one that is updated continuously.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
23
Safety time is sometimes used in MRP rather than safety stock.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
24
Typically the total cost of ownership (TCO)of ERP systems is clearly detailed and certain at the time a company makes the investment to acquire a system.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
25
The emergence of ERP systems was primarily because they are less complex to use than MRP systems.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
26
A net-change MRP is one that involves periodically updating all aspects of an MRP system.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
27
MRP II is simply a label for current,more advanced versions of software applications for MRP.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
28
ERP packages are intended to fit established ways of doing business,but some modifications to business processes or the ERP software are typically required.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
29
Load reports compare planned capacity requirements with projected capacity and availability.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
30
The part-period method for lot sizing attempts to balance setup and holding costs.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
31
Load reports of capacity may be misleading as they do not consider queuing delays.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
32
For relatively stable situations,a net-change MRP is better suited than using regenerative MRP.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
33
Lot-for-lot ordering in MRP provides coverage for some predetermined number of periods.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
34
ERP involves software that is used to manage and coordinate all the resources,information,and functions of an organization from a shared database.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
35
Load reports show capacity requirements for departments or work centres.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
36
Fixed-interval ordering in MRP places orders that cover a predetermined number of periods.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
37
MRP II involves an expanded approach to production planning and scheduling than MRP.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
38
The part-period method for lot sizing breaks the time periods into smaller units of time to create daily or hourly production schedules.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
39
One of the primary reports of MRP concerns changes to open orders.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
40
Configuring the ERP software involves reengineering established business processes to align with the ERP's procedural settings.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
41
The development and application of MRP is primarily associated with two developments: (1)managers recognizing the need to differentiate between independent and dependent demand,and (2)___________.

A) increased reliance on computers for record keeping
B) development of the EOQ model
C) the need for inventory control systems
D) the emergence of ERP systems
E) accounting systems
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
42
Which is true of a net-change MRP?

A) It is a batch-type system which is updated periodically.
B) It generates exception reports.
C) The basic production plan is modified to reflect changes as they occur.
D) It is used to authorize the execution of planned orders.
E) It indicates the amount and timing of future changes.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
43
The MRP approach that immediately updates only those records directly affected by a change is referred to as a(n):

A) regenerative MRP.
B) batch-type MRP.
C) Plossl-Wright system.
D) net-change MRP.
E) gross-change MRP.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
44
The hierarchical diagram that depicts the subassemblies and components that are needed to produce and/or assemble a product is called a(n):

A) assembly time chart.
B) product structure tree.
C) MRP II.
D) pegging.
E) none of the choices.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
45
Independent demand tends to be ___________,while dependent demand tends to be __________.

A) unstable; smooth
B) unstable; stable
C) stable; lumpy
D) smooth; sawtooth
E) sawtooth; smooth
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
46
Periodic updating of an MRP system to account for all changes which have occurred within a given time interval is called:

A) pegging.
B) planned order releases.
C) net-change MRP.
D) regenerative MRP.
E) exception report.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
47
In an MRP master production schedule,the planning horizon is often separated into a series of times periods called:

A) pegging.
B) lead times.
C) stacked lead times.
D) time buckets.
E) None of the choices.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
48
A process designed to handle purchasing and scheduling the production of dependent-demand components is:

A) economic part-period (EPP).
B) lot-for-lot (LFL).
C) economic order quantity (EOQ).
D) material requirements planning (MRP).
E) economic run size (ERS).
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
49
Which one of the following is not an input in an MRP system?

A) Planned-order releases
B) Bill of materials
C) Master production schedules
D) Inventory on-hand, open orders and lead times
E) All are inputs
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
50
The gross requirements of a given part or component are determined from:

A) net requirements + amount on-hand.
B) gross requirements of the immediate parent(s).
C) planned order releases of the end item.
D) net requirements of the end item.
E) planned order release of the immediate parent(s).
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
51
Ignoring the possibility of safety stock requirements,which one of the following most closely describes the calculation of net requirements for an item in MRP?

A) Gross requirements - projected on-hand - scheduled receipts
B) Gross requirements - scheduled receipts
C) Gross requirements - order releases + amount on-hand
D) Gross requirements - planned order releases
E) Gross requirements -projected on-hand + planned order releases
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
52
ERP automates the tasks involved in performing a business process,such as order fulfilment and financial reporting.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
53
In MRP processing the difference between a planned-order release and the planned-order receipt is:

A) level of safety stock.
B) scheduled receipts of open orders.
C) timing as per the lead time.
D) a one is a forecast and the other is actual.
E) the level of net requirements.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
54
In MRP,under lot-for-lot ordering,the size of "planned-order receipts" are equal to:

A) "scheduled receipts."
B) "planned-order releases."
C) open orders already scheduled to be delivered.
D) "gross requirements."
E) None of the choices.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
55
In MRP,"scheduled receipts" are:

A) identical to "planned-order receipts."
B) identical to "planned-order releases."
C) open orders already scheduled to be delivered.
D) "net requirements" in a time period.
E) None of the choices.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
56
Which of these products and services would be most likely to have dependent demand?

A) Automobiles
B) Frozen vegetables
C) Flowers
D) Lumber
E) None of the choices
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
57
Which of the following most closely describes dependent demand?

A) Demand generated by suppliers.
B) Sales forecasts.
C) Derived demand.
D) Demands placed on suppliers by their customers.
E) Net material requirements.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
58
The input used in MRP that lists the assemblies,subassemblies,parts,and raw materials needed to produce one unit of finished product is the:

A) master production schedule.
B) bill of material.
C) inventory-records.
D) assembly-time chart.
E) net-requirements chart.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
59
Pegging is used primarily for which one of the following purposes?

A) Identifying parent items that have generated a certain set of requirements for an item.
B) Identifying the supplier of a given component.
C) Identifying the supplier of a given component's parent.
D) Periodically update material requirements as conditions change.
E) Obtaining exception reports due to periodic changes in material requirements.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
60
The MRP input stating which end items are to be produced,when they are needed,and what quantities are needed,is the:

A) master production schedule.
B) bill-of-materials.
C) inventory-records.
D) assembly-time chart.
E) net-requirements chart.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
61
If the firm is using lot size for a fixed period of two,what is the order size for the first order?

A) 120
B) 200
C) 280
D) 160
E) 150
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
62
What is the economic part-period (EPP)for ordering this item?

A) 2
B) 50
C) 100
D) 150
E) 200
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
63
What is the lot size for the second order using the part-period method?

A) 80
B) 150
C) 170
D) 250
E) 230
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
64
Which of the following are accurate statements concerning MPS,MRP and capacity requirements planning (CRP)?
I)CRP is equivalent to a master production schedule (MPS).
II)CRP is needed to determine if an MPS is feasible.
III)CRP is an input to MRP.
IV)Planned-order releases from MRP are the inputs for CRP.

A) I and II
B) I, II, and III
C) II and IV
D) II, III, and IV
E) I, II, III, and IV
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
65
What is the net requirement for Whatzats to fill this order?

A) 100
B) 140
C) 150
D) 180
E) 200
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
66
If 40 Ps are needed,and on-hand inventory consists of 15 Ps and 10 each of all other components and subassemblies,how many Cs are needed?

A) 340
B) 350
C) 380
D) 400
E) 590
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
67
When should an order for Wherezats be released?

A) At the start of week 2.
B) At the start of week 3.
C) At the start of week 4.
D) At the start of week 5.
E) At the start of week 6.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
68
A report that compares known and expected future capacity requirements with projected available capacity is a:

A) master production schedule.
B) bill of material report.
C) inventory status report.
D) MRP schedule.
E) load report.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
69
If 17 Ps are needed,and no on-hand inventory exists,how many Cs will be needed?

A) 8
B) 16
C) 136
D) 204
E) 272
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
70
How many Wherezats should be ordered?

A) 400
B) 450
C) 500
D) 550
E) 600
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
71
Under fixed-interval lot sizing,order sizes for component parts are determined based on which one of the following?

A) Gross requirements for one period.
B) Net requirements for some predetermined number of periods.
C) Economic order quantity for one period.
D) Gross requirements - net requirements for a predetermined number of periods.
E) Net requirements - amount on-hand for a predetermined number of periods.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
72
Using the product-tree shown,determine the following:
(i)the quantity of component K that will be needed to assemble 80 units of P,assuming no on-hand inventory exists.
(ii)the quantity of component K needed to assemble 80 units of P,given on-hand inventory of 30 A's,50 B's and 20 C's.
Using the product-tree shown,determine the following: (i)the quantity of component K that will be needed to assemble 80 units of P,assuming no on-hand inventory exists. (ii)the quantity of component K needed to assemble 80 units of P,given on-hand inventory of 30 A's,50 B's and 20 C's.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
73
If 17 Ps are needed,and on-hand inventory consists of 10 As,15 Bs,20 Cs,12 Ms and 5 Ns,how many Cs are needed?

A) 48
B) 144
C) 192
D) 212
E) 272
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
74
What is the correct sequence to go from the broadest to the most detailed form of operations planning?

A) MRP » MPS » ERP
B) ERP » MRP » MPS
C) ERP » MPS » MRP
D) MPS » ERP » MRP
E) MPS » MRP » ERP
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
75
Budget overruns when implementing ERP systems are typically caused by:
I)high equipment costs.
II)high training costs.
III)high capital interest charges.
IV)costs of integrating and testing

A) I only
B) I and III only
C) I, II, IV only
D) II and IV only
E) I, II, and IV only
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
76
Which action can managers take if capacity requirements planning (CRP)indicate one or more work stations are projected to be under loaded or over loaded?

A) Shifting some orders to adjacent periods.
B) Transferring employees from other areas.
C) Scheduling overtime.
D) Revise the MPS and MRP.
E) All of the choices are options.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
77
Which one of the following most closely describes the MRP approach that is used for components or subassemblies to compensate for variations in lead time?

A) Pegging
B) Safety stock
C) Increased order sizes
D) Safety time
E) Low-level coding
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
78
Which of the following are primary reports provided by MRP systems?
I)Planned order releases
II)Immediate order releases
III)Demand history reports
IV)Changes to open orders

A) I and II only
B) I, II, III only
C) I, II, IV only
D) II, III, IV only
E) I, II, III, and IV
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
79
What is the part-period method lot size for the order for the first period?

A) 120
B) 200
C) 280
D) 350
E) 450
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
80
For which period will the second order be submitted using the part period lot sizing method?

A) Period 2
B) Period 3
C) Period 4
D) Period 5
E) Period 6
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 84 flashcards in this deck.