Exam 14: Material Requirements Planning and Enterprise Resource Planning
Exam 1: Introduction to Operations Management63 Questions
Exam 2: Competitiveness, Strategic Planning, and Productivity54 Questions
Exam 3: Demand Forecasting172 Questions
Exam 4: A: Product Design74 Questions
Exam 4: B: Product Design56 Questions
Exam 5: A: Strategic Capacity Planning74 Questions
Exam 5: B: Strategic Capacity Planning64 Questions
Exam 6: A: Process Design and Facility Layout157 Questions
Exam 6: B: Process Design and Facility Layout99 Questions
Exam 7: A: Design of Work Systems143 Questions
Exam 7: B: Design of Work Systems68 Questions
Exam 8: A: Location Planning and Analysis74 Questions
Exam 8: B: Location Planning and Analysis16 Questions
Exam 9: Management of Quality98 Questions
Exam 10: A: Statistical Quality Control121 Questions
Exam 10: B: Statistical Quality Control61 Questions
Exam 11: Supply Chain Management86 Questions
Exam 12: Inventory Management168 Questions
Exam 13: Aggregate Operations Planning71 Questions
Exam 14: Material Requirements Planning and Enterprise Resource Planning84 Questions
Exam 15: A: Just-In-Time and Lean Production82 Questions
Exam 15: B: Just-In-Time and Lean Production32 Questions
Exam 16: Job and Staff Scheduling112 Questions
Exam 17: Project Management127 Questions
Exam 18: A: Waiting-Line Analysis76 Questions
Exam 18: B: Waiting-Line Analysis41 Questions
Select questions type
Which of the following most closely describes dependent demand?
Free
(Multiple Choice)
4.7/5
(31)
Correct Answer:
C
The hierarchical diagram that depicts the subassemblies and components that are needed to produce and/or assemble a product is called a(n):
Free
(Multiple Choice)
4.9/5
(40)
Correct Answer:
B
Budget overruns when implementing ERP systems are typically caused by:
I.high equipment costs.
II.high training costs.
III.high capital interest charges.
IV.costs of integrating and testing
Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
D
Independent demand tends to be ___________,while dependent demand tends to be __________.
(Multiple Choice)
4.8/5
(45)
Given the following information,construct a product tree diagram and develop a material requirements plan that will yield 400 units of product P at the start of week 7.
Use the following form:



(Essay)
4.8/5
(41)
One of the primary reports of MRP concerns changes to open orders.
(True/False)
4.9/5
(38)
The gross requirements of a given part or component are determined from:
(Multiple Choice)
4.8/5
(42)
The master production schedule (MPS)states which end items are to be produced.
(True/False)
4.8/5
(25)
What is the part-period method lot size for the order for the first period?
(Multiple Choice)
4.8/5
(35)
MRP usually involves inventory items that have independent demand.
(True/False)
4.9/5
(32)
What is the economic part-period (EPP)for ordering this item?
(Multiple Choice)
4.9/5
(43)
The planned-order releases at one level of an MRP plan determine the gross requirements at the next level down in the bill of material.
(True/False)
4.7/5
(38)
If 40 Ps are needed,and on-hand inventory consists of 15 Ps and 10 each of all other components and subassemblies,how many Cs are needed?
(Multiple Choice)
4.8/5
(31)
ERP involves software that is used to manage and coordinate all the resources,information,and functions of an organization from a shared database.
(True/False)
4.7/5
(33)
The development and application of MRP is primarily associated with two developments: (1)managers recognizing the need to differentiate between independent and dependent demand,and (2)___________.
(Multiple Choice)
4.8/5
(27)
Which one of the following most closely describes the MRP approach that is used for components or subassemblies to compensate for variations in lead time?
(Multiple Choice)
4.9/5
(36)
The following is a list of components required to produce one unit of end item P:
P: 2 A's,3 B's,3 C's
A: 5 M's,2 R's
B:1 D,3 N's.
C: 1 T,4 N's
M: 1 N
Determine the number of N's that will be needed to make 60 P's in each of these cases:
(i)There are currently 10 P's on hand.
(ii)On-hand inventory consists of 15 P's,10A's,20 B's,10 C's,100 N's,300 T's,and 200 M's.
(Essay)
4.8/5
(34)
The MRP requires a list of the individual parts that will be converted to finished goods.
(True/False)
4.8/5
(43)
Showing 1 - 20 of 84