Deck 25: Extension 14: Maintenance

Full screen (f)
exit full mode
Question
Proactive maintenance is periodic.
Use Space or
up arrow
down arrow
to flip the card.
Question
Degree of technology is a factor affecting the decision of how much preventive maintenance is desirable.
Question
The goal of maintenance is to minimize cost.
Question
Cutting preventive maintenance in half will probably double the number of breakdowns.
Question
The goal of maintenance is to maintain the productive system in good working order while minimizing or eliminating the cost of preventive maintenance.
Question
If one operator performing preventive maintenance requires two hours to complete the job, then two operators working together should complete the preventive maintenance in one hour.
Question
Maintenance activities are often organized into the two groups:

A)breakdown maintenance and preventive maintenance
B)breakdown maintenance and predictive maintenance
C)preventive maintenance and predictive maintenance
D)equipment maintenance and breakdown maintenance
E)equipment maintenance and buildings maintenance
Question
Pareto analysis (using the 80/20 rule) is one method of determining when preventive maintenance activities should be performed.
Question
Breakdown maintenance is _____________; preventative maintenance is _________.

A)reactive; proactive
B)proactive; reactive
C)expensive; inexpensive
D)inexpensive; expensive
E)easy; hard
Question
In the broadest sense, preventive maintenance extends back to the installation stage of equipment and facilities.
Question
Ideally, preventive maintenance will be performed before a breakdown or failure.
Question
Breakdown maintenance is best performed on a regularly scheduled basis.
Question
___________ is most closely associated with breakdown maintenance.

A)equipment adjustments
B)equipment cleaning
C)equipment inspection
D)repair of broken parts
E)replacement of worn parts
Question
The goal of maintenance is to maintain the productive system in good working order while minimizing:

A)total preventive maintenance costs
B)total breakdown maintenance costs
C)total maintenance costs
D)the difference between preventive and breakdown costs
E)the ratio of breakdown to preventive maintenance costs
Question
One basis for scheduling preventive maintenance is passage of time.
Question
Breakdown maintenance includes activities such as equipment inspection and adjustment.
Question
Cost of equipment breakdown doesn't include:

A)loss of output
B)cost of idle workers
C)damage to other equipment
D)replacement costs
E)potential safety hazard
Question
In the area of maintenance, the Pareto phenomenon is reflected in the fact that, regardless of problem classification, all equipment will justify about the same expense.
Question
Factors affecting the decision of how much preventive maintenance is desirable typically include all of the following except:

A)age of equipment
B)type of product
C)degree of technology
D)type of production process
E)how critical to the production process
Question
It is best to replace a failing piece of equipment with one that will have identical capabilities as the equipment being replaced since we are already familiar with that machine.
Question
The frequency of breakdown of a piece of equipment per month is shown in the table.The cost of a breakdown is $1,000 and the cost of preventive maintenance is $2,000 per month.Assume that the equipment breakdown can be avoided if preventive maintenance is performed.Should the manager use preventive maintenance, or would it be better to fix the equipment when it breaks down?
Question
The average time before breakdown of a machine is normally distributed and has a mean of 9 weeks and a standard deviation of 1.5 weeks.If breakdown cost averages $1,500 and preventive maintenance costs $500, what is the optimal preventive maintenance interval?

A)3.8 weeks
B)8.4 weeks
C)9.6 weeks
D)6.9 weeks
E)7.2 weeks
Question
The average time before breakdown of a machine is normally distributed and has a mean of 7 weeks and a standard deviation of 1.5 weeks.If breakdown cost averages $2,500 and preventive maintenance costs $500, what is the optimal preventive maintenance interval?
Question
The optimum amount of preventive maintenance is where:

A)Total breakdown costs are a minimum.
B)Total preventive maintenance costs are a minimum.
C)Each maintenance component cost is a minimum.
D)Total maintenance costs are a maximum.
E)Total maintenance costs are a minimum.
Question
Attempting to determine when preventive maintenance activities should be performed is called:

A)breakdown maintenance
B)forecastive maintenance
C)preventive maintenance
D)predictive maintenance
E)corrective maintenance
Question
Breakdown programs often are prioritized such that some equipment gets a lot of attention and others get very little.This typically reflects the fact that breakdowns are consistent with __________.

A)Pareto phenomena
B)production interruptions
C)supply disturbances
D)cross-trained workers
E)lean operations
Question
In the area of maintenance, the Pareto phenomenon is reflected in the fact that:

A)All equipment justifies about the same expense.
B)A majority of equipment will justify considerable expense.
C)A few pieces of equipment will justify little expense.
D)A few pieces of equipment will justify considerable expense.
E)No piece of equipment will justify major expense; it's better to replace.
Question
Which of the following would not improve the performance of a breakdown program?

A)more trained personnel
B)short lead times for replacement parts
C)standby equipment
D)cross-training repair personnel
E)reducing inventories of spare parts
Question
In the broadest sense, equipment and facilities preventive maintenance extends back to the:

A)design and selection stage
B)procurement stage
C)installation stage
D)pilot-testing stage
E)implementation stage
Question
The average time before breakdown of a machine is normally distributed and has a mean of 18 weeks and a standard deviation of 3 weeks.If breakdown cost averages $2,000 and preventive maintenance costs $1,400, what is the optimal preventive maintenance interval?

A)16.4 weeks
B)14.6 weeks
C)16.9 weeks
D)19.6 weeks
E)21.3 weeks
Question
Ideally, preventive maintenance will be performed:

A)after a planned inspection
B)after the passage of a specified period of time
C)after a predetermined number of operating hours
D)just prior to the start of the workday
E)just prior to a breakdown or failure
Question
"Total productive maintenance" is best described as:

A)avoiding all breakdown maintenance
B)doing a great deal of preventative maintenance to try to avoid breakdown maintenance
C)a JIT approach taking advantage of cross-training
D)extending preventative maintenance back to design
E)none of the above
Question
Which of the following is the primary consideration with regard to preventative maintenance?

A)What technology to use
B)How varied the maintenance will be
C)How often the maintenance will occur
D)Which products it will be provided to
E)Who will do it
Question
Reactive maintenance is _____________ maintenance.

A)Planned
B)After the event
C)Proactive
D)Predictive
E)Preventive
Question
The type of maintenance which is periodic in nature is:

A)breakdown maintenance
B)predictive maintenance
C)preventive maintenance
D)corrective maintenance
E)all of the above
Question
The major approaches used in plans to deal with breakdowns include all of the following except:

A)standby equipment
B)inventories of spare parts
C)operator repair of minor problems
D)readily available repair personnel
E)All of these are major approaches.
Question
Preventive maintenance is generally scheduled on the basis of:

A)planned inspections
B)passage of time
C)number of operating hours
D)all of the above
E)none of the above
Question
The total maintenance curve (preventive maintenance cost plus breakdown and repair cost):

A)slopes up as the number of preventive maintenances increase
B)slopes down as the number of preventive maintenances increase
C)starts low, increases rapidly and then drops back down as the number of preventive maintenances increase
D)starts high, drops gradually but then goes back up as the number of preventive maintenances increase
E)remains relatively flat as the number of preventive maintenances increase
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/38
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 25: Extension 14: Maintenance
1
Proactive maintenance is periodic.
True
2
Degree of technology is a factor affecting the decision of how much preventive maintenance is desirable.
True
3
The goal of maintenance is to minimize cost.
False
4
Cutting preventive maintenance in half will probably double the number of breakdowns.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
5
The goal of maintenance is to maintain the productive system in good working order while minimizing or eliminating the cost of preventive maintenance.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
6
If one operator performing preventive maintenance requires two hours to complete the job, then two operators working together should complete the preventive maintenance in one hour.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
7
Maintenance activities are often organized into the two groups:

A)breakdown maintenance and preventive maintenance
B)breakdown maintenance and predictive maintenance
C)preventive maintenance and predictive maintenance
D)equipment maintenance and breakdown maintenance
E)equipment maintenance and buildings maintenance
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
8
Pareto analysis (using the 80/20 rule) is one method of determining when preventive maintenance activities should be performed.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
9
Breakdown maintenance is _____________; preventative maintenance is _________.

A)reactive; proactive
B)proactive; reactive
C)expensive; inexpensive
D)inexpensive; expensive
E)easy; hard
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
10
In the broadest sense, preventive maintenance extends back to the installation stage of equipment and facilities.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
11
Ideally, preventive maintenance will be performed before a breakdown or failure.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
12
Breakdown maintenance is best performed on a regularly scheduled basis.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
13
___________ is most closely associated with breakdown maintenance.

A)equipment adjustments
B)equipment cleaning
C)equipment inspection
D)repair of broken parts
E)replacement of worn parts
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
14
The goal of maintenance is to maintain the productive system in good working order while minimizing:

A)total preventive maintenance costs
B)total breakdown maintenance costs
C)total maintenance costs
D)the difference between preventive and breakdown costs
E)the ratio of breakdown to preventive maintenance costs
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
15
One basis for scheduling preventive maintenance is passage of time.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
16
Breakdown maintenance includes activities such as equipment inspection and adjustment.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
17
Cost of equipment breakdown doesn't include:

A)loss of output
B)cost of idle workers
C)damage to other equipment
D)replacement costs
E)potential safety hazard
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
18
In the area of maintenance, the Pareto phenomenon is reflected in the fact that, regardless of problem classification, all equipment will justify about the same expense.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
19
Factors affecting the decision of how much preventive maintenance is desirable typically include all of the following except:

A)age of equipment
B)type of product
C)degree of technology
D)type of production process
E)how critical to the production process
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
20
It is best to replace a failing piece of equipment with one that will have identical capabilities as the equipment being replaced since we are already familiar with that machine.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
21
The frequency of breakdown of a piece of equipment per month is shown in the table.The cost of a breakdown is $1,000 and the cost of preventive maintenance is $2,000 per month.Assume that the equipment breakdown can be avoided if preventive maintenance is performed.Should the manager use preventive maintenance, or would it be better to fix the equipment when it breaks down?
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
22
The average time before breakdown of a machine is normally distributed and has a mean of 9 weeks and a standard deviation of 1.5 weeks.If breakdown cost averages $1,500 and preventive maintenance costs $500, what is the optimal preventive maintenance interval?

A)3.8 weeks
B)8.4 weeks
C)9.6 weeks
D)6.9 weeks
E)7.2 weeks
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
23
The average time before breakdown of a machine is normally distributed and has a mean of 7 weeks and a standard deviation of 1.5 weeks.If breakdown cost averages $2,500 and preventive maintenance costs $500, what is the optimal preventive maintenance interval?
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
24
The optimum amount of preventive maintenance is where:

A)Total breakdown costs are a minimum.
B)Total preventive maintenance costs are a minimum.
C)Each maintenance component cost is a minimum.
D)Total maintenance costs are a maximum.
E)Total maintenance costs are a minimum.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
25
Attempting to determine when preventive maintenance activities should be performed is called:

A)breakdown maintenance
B)forecastive maintenance
C)preventive maintenance
D)predictive maintenance
E)corrective maintenance
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
26
Breakdown programs often are prioritized such that some equipment gets a lot of attention and others get very little.This typically reflects the fact that breakdowns are consistent with __________.

A)Pareto phenomena
B)production interruptions
C)supply disturbances
D)cross-trained workers
E)lean operations
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
27
In the area of maintenance, the Pareto phenomenon is reflected in the fact that:

A)All equipment justifies about the same expense.
B)A majority of equipment will justify considerable expense.
C)A few pieces of equipment will justify little expense.
D)A few pieces of equipment will justify considerable expense.
E)No piece of equipment will justify major expense; it's better to replace.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
28
Which of the following would not improve the performance of a breakdown program?

A)more trained personnel
B)short lead times for replacement parts
C)standby equipment
D)cross-training repair personnel
E)reducing inventories of spare parts
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
29
In the broadest sense, equipment and facilities preventive maintenance extends back to the:

A)design and selection stage
B)procurement stage
C)installation stage
D)pilot-testing stage
E)implementation stage
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
30
The average time before breakdown of a machine is normally distributed and has a mean of 18 weeks and a standard deviation of 3 weeks.If breakdown cost averages $2,000 and preventive maintenance costs $1,400, what is the optimal preventive maintenance interval?

A)16.4 weeks
B)14.6 weeks
C)16.9 weeks
D)19.6 weeks
E)21.3 weeks
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
31
Ideally, preventive maintenance will be performed:

A)after a planned inspection
B)after the passage of a specified period of time
C)after a predetermined number of operating hours
D)just prior to the start of the workday
E)just prior to a breakdown or failure
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
32
"Total productive maintenance" is best described as:

A)avoiding all breakdown maintenance
B)doing a great deal of preventative maintenance to try to avoid breakdown maintenance
C)a JIT approach taking advantage of cross-training
D)extending preventative maintenance back to design
E)none of the above
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
33
Which of the following is the primary consideration with regard to preventative maintenance?

A)What technology to use
B)How varied the maintenance will be
C)How often the maintenance will occur
D)Which products it will be provided to
E)Who will do it
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
34
Reactive maintenance is _____________ maintenance.

A)Planned
B)After the event
C)Proactive
D)Predictive
E)Preventive
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
35
The type of maintenance which is periodic in nature is:

A)breakdown maintenance
B)predictive maintenance
C)preventive maintenance
D)corrective maintenance
E)all of the above
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
36
The major approaches used in plans to deal with breakdowns include all of the following except:

A)standby equipment
B)inventories of spare parts
C)operator repair of minor problems
D)readily available repair personnel
E)All of these are major approaches.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
37
Preventive maintenance is generally scheduled on the basis of:

A)planned inspections
B)passage of time
C)number of operating hours
D)all of the above
E)none of the above
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
38
The total maintenance curve (preventive maintenance cost plus breakdown and repair cost):

A)slopes up as the number of preventive maintenances increase
B)slopes down as the number of preventive maintenances increase
C)starts low, increases rapidly and then drops back down as the number of preventive maintenances increase
D)starts high, drops gradually but then goes back up as the number of preventive maintenances increase
E)remains relatively flat as the number of preventive maintenances increase
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 38 flashcards in this deck.