Exam 25: Extension 14: Maintenance
Exam 1: Introduction to Operations Management70 Questions
Exam 2: Competitiveness, Strategy, and Productivity73 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design77 Questions
Exam 5: Strategic Capacity Planning for Products and Services103 Questions
Exam 6: Process Selection and Facility Layout151 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 11: Aggregate Planning and Master Scheduling81 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management162 Questions
Exam 14: Jit and Lean Operations88 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming105 Questions
Exam 20: Extension 4: Reliability10 Questions
Exam 21: Extension 5: Decision Theory126 Questions
Exam 22: Extension 7: Learning Curves68 Questions
Exam 23: Extension 8: The Transportation Model20 Questions
Exam 24: Extension 10: Acceptance Sampling65 Questions
Exam 25: Extension 14: Maintenance38 Questions
Select questions type
One basis for scheduling preventive maintenance is passage of time.
Free
(True/False)
4.8/5
(37)
Correct Answer:
True
In the area of maintenance, the Pareto phenomenon is reflected in the fact that:
Free
(Multiple Choice)
4.7/5
(33)
Correct Answer:
D
Breakdown maintenance is best performed on a regularly scheduled basis.
Free
(True/False)
5.0/5
(38)
Correct Answer:
False
The average time before breakdown of a machine is normally distributed and has a mean of 9 weeks and a standard deviation of 1.5 weeks.If breakdown cost averages $1,500 and preventive maintenance costs $500, what is the optimal preventive maintenance interval?
(Multiple Choice)
4.9/5
(37)
The major approaches used in plans to deal with breakdowns include all of the following except:
(Multiple Choice)
4.9/5
(31)
Degree of technology is a factor affecting the decision of how much preventive maintenance is desirable.
(True/False)
4.7/5
(29)
The average time before breakdown of a machine is normally distributed and has a mean of 18 weeks and a standard deviation of 3 weeks.If breakdown cost averages $2,000 and preventive maintenance costs $1,400, what is the optimal preventive maintenance interval?
(Multiple Choice)
4.8/5
(38)
Preventive maintenance is generally scheduled on the basis of:
(Multiple Choice)
4.9/5
(35)
The goal of maintenance is to maintain the productive system in good working order while minimizing or eliminating the cost of preventive maintenance.
(True/False)
4.8/5
(39)
The frequency of breakdown of a piece of equipment per month is shown in the table.The cost of a breakdown is $1,000 and the cost of preventive maintenance is $2,000 per month.Assume that the equipment breakdown can be avoided if preventive maintenance is performed.Should the manager use preventive maintenance, or would it be better to fix the equipment when it breaks down?
(Essay)
4.9/5
(36)
Maintenance activities are often organized into the two groups:
(Multiple Choice)
4.8/5
(39)
Which of the following is the primary consideration with regard to preventative maintenance?
(Multiple Choice)
4.9/5
(32)
Breakdown maintenance includes activities such as equipment inspection and adjustment.
(True/False)
4.7/5
(28)
Factors affecting the decision of how much preventive maintenance is desirable typically include all of the following except:
(Multiple Choice)
4.9/5
(23)
Attempting to determine when preventive maintenance activities should be performed is called:
(Multiple Choice)
4.9/5
(37)
Which of the following would not improve the performance of a breakdown program?
(Multiple Choice)
4.7/5
(46)