Deck 16: An Introduction to Agile Project Management

Full screen (f)
exit full mode
Question
A new holistic approach in new commercial product development efforts where the cross-functional team collaborating to develop a new product is compared to rugby, where the whole team tries to go the distance as a unit is known as

A)Scrum.
B)Specific project management.
C)Traditional project management.
D)Prioritized WBS.
E)Functional teams.
Use Space or
up arrow
down arrow
to flip the card.
Question
_____________ represents a fundamental shift away from the traditional plan-driven project management approach by adopting a more experimental and adaptive approach to managing projects.

A)Agile project management
B)Hybrid project management
C)Uncertain project management
D)Focused project management
E)Interactive project management
Question
Traditional approaches to project management concentrate firmly on

A)Thorough planning up front.
B)New technology.
C)Flexibility.
D)Change.
E)Iterative development.
Question
In many cases, _________ only begin to understand what they actually desire when they are provided with someone's impression of what they want.

A)Project managers
B)Customers
C)Sponsors
D)Team leaders
E)None of these choices are correct.
Question
While agile project management does not consist of one set method, most methods are based on similar principles.Which of the following agile project management principles would be described when teams reflect, learn, and adapt to change, and when project work updates the plan?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
Question
Scrum uses a series of coordinated meetings to manage the development process.Which of the following is held at the start of each sprint? During this meeting the product owner and development team negotiate which product backlog items the team will attempt during the next sprint.

A)Sprint planning meeting
B)Release planning meeting
C)Sprint review meeting
D)Daily Scrum meeting
E)Sprint retrospective meeting
Question
Iterations are short time frames (time boxes)that typically last from ___________.

A)1-4 days
B)1-2 weeks
C)1-4 weeks
D)4-7 weeks
E)7-12 weeks
Question
When considering traditional versus agile project management, all of the following are part of the traditional project management model EXCEPT

A)Fixed scope.
B)Deliverables.
C)Continuous design.
D)Low uncertainty.
E)Conventional project teams.
Question
Iterative development processes provide the following important advantages EXCEPT

A)Continuous integration of the evolving product.
B)Frequent demonstration of progress to increase the likelihood that the end product will satisfy customer needs.
C)Early detection of defects and problems.
D)Ease of comparing actual information against planned.
E)Constant verification and validation of the evolving product.
Question
While agile project management does not consist of one set method, most methods are based on similar principles.Which of the following agile project management principles would be described when employing business-driven prioritizations of requirements and features to satisfy customer needs?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
Question
While agile project management does not consist of one set method, most methods are based on similar principles.Which of the following agile project management principles would be described when team members decide among themselves who should do what and what should be done?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
Question
Project ________ varies according to the extent the project scope is known and stable and the technology to be used is known and proven.

A)Stability
B)Balance
C)Unity
D)Uncertainty
E)Degree
Question
While agile project management does not consist of one set method, most methods are based on similar principles.Which of the following agile project management principles would be described when testing assumptions early and building working prototypes to solicit customer feedback and refine product requirements?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
Question
When considering the agile project management process, at the end of each iteration

A)Team members are released to work on other projects.
B)The Scrum master assigns daily tasks to team members.
C)Product owner determines whether or not the project is complete.
D)The Scrum master can terminate the project.
E)Stakeholders and customers review progress and reevaluate priorities.
Question
While agile project management does not consist of one set method, most methods are based on similar principles.Which of the following agile project management principles would be described when creating a flow of value to customers by chunking project delivery into small, functioning increments?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
Question
Using traditional approaches to project management, once the project scope has been firmly established, every detail of the project is defined through the ________.

A)Deliverables
B)Job tickets
C)WBS
D)Estimates
E)Risks
Question
When determining project uncertainty, _________ can be a source of unpredictability.

A)Technology
B)Clients
C)Vendors
D)Sponsors
E)WBS
Question
When considering traditional versus agile project management, all of the following are part of the agile project management model EXCEPT

A)Flexibility.
B)High uncertainty.
C)Embrace change.
D)Design up front.
E)Self-organized project teams.
Question
Specific features are created using Scrum methodology according to four distinct phases.Which of the following places these phases in the correct order?

A)Design, Build, Analysis, Test
B)Monitor, Design, Build, Test
C)Analysis, Design, Build, Test
D)Design, Build, Monitor, Test
E)Analysis, Design, Build, Monitor
Question
Scrum relies on three key roles.A person who facilitates the Scrum process and resolves impediments at the team and organizational level is called a

A)Scrum master.
B)Project champion.
C)Scrum leader.
D)Product owner.
E)Production coordinator.
Question
For some agile projects, ___________ are established, which is the maximum budget that should not be exceeded in the development of a given product or service.

A)Project accounts
B)Contingencies
C)Agile accounts
D)Ceilings
E)Scrum logs
Question
_______________ is the Agile principle describes the process that teams goes through to solve problems to deliver on features expressed by the stakeholder(s).

A)Continuous Improvement
B)Experimentation and Adaption
C)Self-Organization
D)Focus on Customer Value
Question
In order to hedge against unpredictability within a project, Agile Project Management uses

A)A different risk management process.
B)Phase gates.
C)An adaptive and experimental approach.
D)Strict budget constraints.
Question
Scrum uses a series of coordinated meetings to manage the development process.During which of the following are goals and the general plan for the project established?

A)Sprint planning meeting
B)Release planning meeting
C)Sprint review meeting
D)Daily scrum meeting
E)Sprint retrospective meeting
Question
___________ project management concentrates firmly on thorough planning up front.
Question
Within a team applying Agile methods, face-to-face communication replaces

A)Budget planning
B)Risk management
C)Time-consuming documentation
D)Focus on Customer Value
Question
Agile methods can be used on larger scale projects in which several teams are working on different features at the same time.In practice this condition is called

A)Incremental delivery.
B)Staging.
C)Feature collaboration.
D)Scrum.
E)Scaling.
Question
Specific features are created using Scrum methodology according to four distinct phases.Which of the following is NOT one of these phases?

A)Analysis
B)Monitor
C)Build
D)Test
E)Design
Question
_______________ is the Agile principle where the project team uses business-driven prioritization of requirements and features.

A)Focus on Customer Value
B)Iterative and Incremental Delivery
C)Self-Organization
D)Experimentation and Adaption
Question
_______________ is the Agile principle that describes project team members deciding amongst themselves what should be done and who is best suited for it on the team.

A)Focus on Customer Value
B)Iterative and Incremental Delivery
C)Self-Organization
D)Experimentation and Adaption
Question
Scrum uses a series of coordinated meetings to manage the development process.During which of the following is it discussed what was done since the last meeting, what will be done before the next meeting, and if anything is limiting performance?

A)Sprint planning meeting
B)Release planning meeting
C)Sprint review meeting
D)Daily Scrum meeting
E)Sprint retrospective meeting
Question
Traditional project management practices require

A)New technology
B)A high degree of predictability
C)Variability in requirements
D)Strong project management
Question
___________ represents the amount of work the team commits to complete during the next sprint.

A)Sprint backlog
B)Product backlog
C)Project backlog
D)Schedule backlog
E)Task backlog
Question
A ________ is defined as a piece of a product that delivers some useful functionality to a customer.

A)Scrum
B)Value
C)Spirit
D)Feature
E)Priority
Question
Which of the following is NOT true of a development team using Scrum methodology?

A)The team is self-organizing.
B)They have the authority to change features and priorities at the end of each sprint.
C)The team is typically made up of 5 to 9 people.
D)They are responsible for achieving the commitments they make at the sprint planning and review meetings.
E)There are no designated roles or titles.
Question
The _________ is the customer's prioritized list of key features desired when the project is completed.

A)Project master
B)Spirit backlog
C)Creative backlog
D)Product backlog
E)Project list
Question
___________ project management requires a fairly high degree of predictability to be effective.
Question
_______________ is the Agile principle that prescribes the project team learning, reflecting and adapting to change within the Project

A)Continuous Improvement
B)Experimentation and Adaption
C)Self-Organization
D)Focus on Customer Value
Question
Scrum relies on three key roles.A person who acts on behalf of customers to represent their interests and who is responsible for ensuring that the development team focuses their efforts on developing a project that will fulfill the business objective of the project is called a

A)Customer service representative.
B)Project champion.
C)Customer liaison.
D)Product owner.
E)Production coordinator.
Question
_______________ is the Agile principle in which the team creates a flow of value to the stakeholder(s)or customer(s)by delivering smaller, functional increments of the project.

A)Focus on Customer Value
B)Experimentation and Adaption
C)Self-Organization
D)Iterative and Incremental Delivery
Question
The customer's prioritized list of key features desired when the project is completed is the ____________ backlog.
Question
Short time frames (time boxes)that typically last from one to four weeks are called __________.
Question
Scrum uses a series of coordinated _________ to manage the development process.
Question
Using Scrum methodology, specific features are created according to four distinct phases during each sprint.The third phase is to ________ the feature so that it is functional.
Question
The development team is a key role when considering the Scrum process.The team is _____________ in the sense that they decide among themselves who should do what and what should be done.
Question
A(n)_________ is a person who acts on behalf of customers/end users to represent their interests.
Question
The ____________ facilitates the Scrum process and resolves impediments at the team and organizational level.
Question
When teams reflect, learn, and adapt to change, when their work updates the plan, they are following the agile project management principle of _________________.
Question
In response to the financial concerns associated with agile project management, many organizations establish ____________, which is the maximum budget that should not be exceeded in the development of a given product or service.
Question
Using Scrum methodology, specific features are created according to four distinct phases during each sprint.The first phase is _________ and review of functional requirements that will be needed to complete the feature.
Question
Using Scrum methodology, a(n)____________ is typically made up of five to nine people with cross-functional skill sets.
Question
Project ___________ varies according to the extent the project scope is known and stable and the technology to be used is known and proven.
Question
A(n)_________ is defined as a piece of a product that delivers some useful functionality to a customer.
Question
A new holistic approach in new commercial product development efforts where the cross-functional team collaborating to develop a new product is compared to rugby, where the whole team tries to go the distance as a unit, is known as _________.
Question
Using Scrum methodology, specific features are created according to four distinct phases during each sprint.The second phase is the development of a __________ that meets the requirements of the feature.
Question
Using Scrum methodology, specific features are created according to four distinct phases during each sprint.The last phase includes the __________ and documentation of the feature.
Question
The _______ backlog is developed and controlled by the team.It represents the amount of work the team commits to complete during the next sprint.
Question
__________ projects evolve rather than are executed.
Question
_________ project management involves high customer interaction.
Question
In place of a product WBS, Scrum uses product __________ as deliverables.
Question
In agile project management, projects evolve rather than are executed.
Question
Specific features are created using Scrum methodology according to four distinct phases: analysis, design, monitor, and test.
Question
Agile project management is ideal for exploratory projects in which requirements need to be discovered and new technology tested.
Question
Fixed scope is part of the agile project management model.
Question
Each new iteration replaces the work of the previous iterations and adds new capabilities to the evolving to produce a next expanded version of the product.
Question
Traditional project management requires a fairly high degree of predictability to be effective.
Question
The Scrum master is not the leader of the team but acts as a buffer between the team and outside interferences.
Question
Project difficulty varies according to the extent the project scope is known and stable and the technology to be used is known and proven.
Question
In Scrum methodology, it is important to make sure roles and titles are clear when developing a team.
Question
Agile methods appear to work best on __________ projects that require only five to nine dedicated team members to complete the work.
Question
Agile methods can be used on larger scale projects in which several teams are working on different features at the same time.This is called __________.
Question
The meeting meant to reflect on how well the previous sprint went and identify specific actions that can improve future sprints is called a sprint ____________ meeting.
Question
When the project scope and/or technology are not fully known, things become much less predictable.
Question
Traditional approaches to project management concentrate firmly on thorough planning up front.
Question
When faced with a project having multiple stakeholders and a unknown scope, _________ project management methods should be employed
Question
The more the project scope is unknown, the ___________ of the project will be greater
Question
Owners have the option to change features and priorities at the end of each sprint if desired.However, no changes should be made once a sprint has started.
Question
The purpose of release planning is to establish the goals and a general WBS for the project.
Question
Scrum does not use any of the conventional project management tools like Gantt charts or network diagrams.
Question
Freezing the design as late as possible is a common characteristic of the agile project management model.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/98
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 16: An Introduction to Agile Project Management
1
A new holistic approach in new commercial product development efforts where the cross-functional team collaborating to develop a new product is compared to rugby, where the whole team tries to go the distance as a unit is known as

A)Scrum.
B)Specific project management.
C)Traditional project management.
D)Prioritized WBS.
E)Functional teams.
A
Explanation: Scrum can be traced back to the work of Hirotaka Takeuchi and Ikujiro Nonaka, who in 1986 described a new holistic approach in new commercial product development efforts.They compare this approach of a cross-functional team collaborating to develop a new product to rugby.
2
_____________ represents a fundamental shift away from the traditional plan-driven project management approach by adopting a more experimental and adaptive approach to managing projects.

A)Agile project management
B)Hybrid project management
C)Uncertain project management
D)Focused project management
E)Interactive project management
A
Explanation: Agile project management represents a fundamental shift away from the traditional plan-driven project management approach by adopting a more experimental and adaptive approach to managing projects.The final project design is not known in great detail and is continuously developed through a series of incremental iterations over time.
3
Traditional approaches to project management concentrate firmly on

A)Thorough planning up front.
B)New technology.
C)Flexibility.
D)Change.
E)Iterative development.
A
Explanation: Traditional approaches to project management concentrate firmly on thorough planning up front.The rationale is that if you plan, execute your plan, and take corrective action on deviations from plan, you have a high probability of success.
4
In many cases, _________ only begin to understand what they actually desire when they are provided with someone's impression of what they want.

A)Project managers
B)Customers
C)Sponsors
D)Team leaders
E)None of these choices are correct.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
5
While agile project management does not consist of one set method, most methods are based on similar principles.Which of the following agile project management principles would be described when teams reflect, learn, and adapt to change, and when project work updates the plan?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
6
Scrum uses a series of coordinated meetings to manage the development process.Which of the following is held at the start of each sprint? During this meeting the product owner and development team negotiate which product backlog items the team will attempt during the next sprint.

A)Sprint planning meeting
B)Release planning meeting
C)Sprint review meeting
D)Daily Scrum meeting
E)Sprint retrospective meeting
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
7
Iterations are short time frames (time boxes)that typically last from ___________.

A)1-4 days
B)1-2 weeks
C)1-4 weeks
D)4-7 weeks
E)7-12 weeks
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
8
When considering traditional versus agile project management, all of the following are part of the traditional project management model EXCEPT

A)Fixed scope.
B)Deliverables.
C)Continuous design.
D)Low uncertainty.
E)Conventional project teams.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
9
Iterative development processes provide the following important advantages EXCEPT

A)Continuous integration of the evolving product.
B)Frequent demonstration of progress to increase the likelihood that the end product will satisfy customer needs.
C)Early detection of defects and problems.
D)Ease of comparing actual information against planned.
E)Constant verification and validation of the evolving product.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
10
While agile project management does not consist of one set method, most methods are based on similar principles.Which of the following agile project management principles would be described when employing business-driven prioritizations of requirements and features to satisfy customer needs?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
11
While agile project management does not consist of one set method, most methods are based on similar principles.Which of the following agile project management principles would be described when team members decide among themselves who should do what and what should be done?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
12
Project ________ varies according to the extent the project scope is known and stable and the technology to be used is known and proven.

A)Stability
B)Balance
C)Unity
D)Uncertainty
E)Degree
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
13
While agile project management does not consist of one set method, most methods are based on similar principles.Which of the following agile project management principles would be described when testing assumptions early and building working prototypes to solicit customer feedback and refine product requirements?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
14
When considering the agile project management process, at the end of each iteration

A)Team members are released to work on other projects.
B)The Scrum master assigns daily tasks to team members.
C)Product owner determines whether or not the project is complete.
D)The Scrum master can terminate the project.
E)Stakeholders and customers review progress and reevaluate priorities.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
15
While agile project management does not consist of one set method, most methods are based on similar principles.Which of the following agile project management principles would be described when creating a flow of value to customers by chunking project delivery into small, functioning increments?

A)Focus on customer value
B)Iterative and incremental delivery
C)Experimentation and adaptation
D)Self-organization
E)Continuous improvement
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
16
Using traditional approaches to project management, once the project scope has been firmly established, every detail of the project is defined through the ________.

A)Deliverables
B)Job tickets
C)WBS
D)Estimates
E)Risks
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
17
When determining project uncertainty, _________ can be a source of unpredictability.

A)Technology
B)Clients
C)Vendors
D)Sponsors
E)WBS
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
18
When considering traditional versus agile project management, all of the following are part of the agile project management model EXCEPT

A)Flexibility.
B)High uncertainty.
C)Embrace change.
D)Design up front.
E)Self-organized project teams.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
19
Specific features are created using Scrum methodology according to four distinct phases.Which of the following places these phases in the correct order?

A)Design, Build, Analysis, Test
B)Monitor, Design, Build, Test
C)Analysis, Design, Build, Test
D)Design, Build, Monitor, Test
E)Analysis, Design, Build, Monitor
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
20
Scrum relies on three key roles.A person who facilitates the Scrum process and resolves impediments at the team and organizational level is called a

A)Scrum master.
B)Project champion.
C)Scrum leader.
D)Product owner.
E)Production coordinator.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
21
For some agile projects, ___________ are established, which is the maximum budget that should not be exceeded in the development of a given product or service.

A)Project accounts
B)Contingencies
C)Agile accounts
D)Ceilings
E)Scrum logs
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
22
_______________ is the Agile principle describes the process that teams goes through to solve problems to deliver on features expressed by the stakeholder(s).

A)Continuous Improvement
B)Experimentation and Adaption
C)Self-Organization
D)Focus on Customer Value
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
23
In order to hedge against unpredictability within a project, Agile Project Management uses

A)A different risk management process.
B)Phase gates.
C)An adaptive and experimental approach.
D)Strict budget constraints.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
24
Scrum uses a series of coordinated meetings to manage the development process.During which of the following are goals and the general plan for the project established?

A)Sprint planning meeting
B)Release planning meeting
C)Sprint review meeting
D)Daily scrum meeting
E)Sprint retrospective meeting
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
25
___________ project management concentrates firmly on thorough planning up front.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
26
Within a team applying Agile methods, face-to-face communication replaces

A)Budget planning
B)Risk management
C)Time-consuming documentation
D)Focus on Customer Value
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
27
Agile methods can be used on larger scale projects in which several teams are working on different features at the same time.In practice this condition is called

A)Incremental delivery.
B)Staging.
C)Feature collaboration.
D)Scrum.
E)Scaling.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
28
Specific features are created using Scrum methodology according to four distinct phases.Which of the following is NOT one of these phases?

A)Analysis
B)Monitor
C)Build
D)Test
E)Design
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
29
_______________ is the Agile principle where the project team uses business-driven prioritization of requirements and features.

A)Focus on Customer Value
B)Iterative and Incremental Delivery
C)Self-Organization
D)Experimentation and Adaption
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
30
_______________ is the Agile principle that describes project team members deciding amongst themselves what should be done and who is best suited for it on the team.

A)Focus on Customer Value
B)Iterative and Incremental Delivery
C)Self-Organization
D)Experimentation and Adaption
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
31
Scrum uses a series of coordinated meetings to manage the development process.During which of the following is it discussed what was done since the last meeting, what will be done before the next meeting, and if anything is limiting performance?

A)Sprint planning meeting
B)Release planning meeting
C)Sprint review meeting
D)Daily Scrum meeting
E)Sprint retrospective meeting
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
32
Traditional project management practices require

A)New technology
B)A high degree of predictability
C)Variability in requirements
D)Strong project management
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
33
___________ represents the amount of work the team commits to complete during the next sprint.

A)Sprint backlog
B)Product backlog
C)Project backlog
D)Schedule backlog
E)Task backlog
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
34
A ________ is defined as a piece of a product that delivers some useful functionality to a customer.

A)Scrum
B)Value
C)Spirit
D)Feature
E)Priority
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
35
Which of the following is NOT true of a development team using Scrum methodology?

A)The team is self-organizing.
B)They have the authority to change features and priorities at the end of each sprint.
C)The team is typically made up of 5 to 9 people.
D)They are responsible for achieving the commitments they make at the sprint planning and review meetings.
E)There are no designated roles or titles.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
36
The _________ is the customer's prioritized list of key features desired when the project is completed.

A)Project master
B)Spirit backlog
C)Creative backlog
D)Product backlog
E)Project list
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
37
___________ project management requires a fairly high degree of predictability to be effective.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
38
_______________ is the Agile principle that prescribes the project team learning, reflecting and adapting to change within the Project

A)Continuous Improvement
B)Experimentation and Adaption
C)Self-Organization
D)Focus on Customer Value
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
39
Scrum relies on three key roles.A person who acts on behalf of customers to represent their interests and who is responsible for ensuring that the development team focuses their efforts on developing a project that will fulfill the business objective of the project is called a

A)Customer service representative.
B)Project champion.
C)Customer liaison.
D)Product owner.
E)Production coordinator.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
40
_______________ is the Agile principle in which the team creates a flow of value to the stakeholder(s)or customer(s)by delivering smaller, functional increments of the project.

A)Focus on Customer Value
B)Experimentation and Adaption
C)Self-Organization
D)Iterative and Incremental Delivery
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
41
The customer's prioritized list of key features desired when the project is completed is the ____________ backlog.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
42
Short time frames (time boxes)that typically last from one to four weeks are called __________.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
43
Scrum uses a series of coordinated _________ to manage the development process.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
44
Using Scrum methodology, specific features are created according to four distinct phases during each sprint.The third phase is to ________ the feature so that it is functional.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
45
The development team is a key role when considering the Scrum process.The team is _____________ in the sense that they decide among themselves who should do what and what should be done.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
46
A(n)_________ is a person who acts on behalf of customers/end users to represent their interests.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
47
The ____________ facilitates the Scrum process and resolves impediments at the team and organizational level.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
48
When teams reflect, learn, and adapt to change, when their work updates the plan, they are following the agile project management principle of _________________.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
49
In response to the financial concerns associated with agile project management, many organizations establish ____________, which is the maximum budget that should not be exceeded in the development of a given product or service.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
50
Using Scrum methodology, specific features are created according to four distinct phases during each sprint.The first phase is _________ and review of functional requirements that will be needed to complete the feature.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
51
Using Scrum methodology, a(n)____________ is typically made up of five to nine people with cross-functional skill sets.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
52
Project ___________ varies according to the extent the project scope is known and stable and the technology to be used is known and proven.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
53
A(n)_________ is defined as a piece of a product that delivers some useful functionality to a customer.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
54
A new holistic approach in new commercial product development efforts where the cross-functional team collaborating to develop a new product is compared to rugby, where the whole team tries to go the distance as a unit, is known as _________.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
55
Using Scrum methodology, specific features are created according to four distinct phases during each sprint.The second phase is the development of a __________ that meets the requirements of the feature.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
56
Using Scrum methodology, specific features are created according to four distinct phases during each sprint.The last phase includes the __________ and documentation of the feature.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
57
The _______ backlog is developed and controlled by the team.It represents the amount of work the team commits to complete during the next sprint.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
58
__________ projects evolve rather than are executed.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
59
_________ project management involves high customer interaction.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
60
In place of a product WBS, Scrum uses product __________ as deliverables.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
61
In agile project management, projects evolve rather than are executed.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
62
Specific features are created using Scrum methodology according to four distinct phases: analysis, design, monitor, and test.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
63
Agile project management is ideal for exploratory projects in which requirements need to be discovered and new technology tested.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
64
Fixed scope is part of the agile project management model.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
65
Each new iteration replaces the work of the previous iterations and adds new capabilities to the evolving to produce a next expanded version of the product.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
66
Traditional project management requires a fairly high degree of predictability to be effective.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
67
The Scrum master is not the leader of the team but acts as a buffer between the team and outside interferences.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
68
Project difficulty varies according to the extent the project scope is known and stable and the technology to be used is known and proven.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
69
In Scrum methodology, it is important to make sure roles and titles are clear when developing a team.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
70
Agile methods appear to work best on __________ projects that require only five to nine dedicated team members to complete the work.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
71
Agile methods can be used on larger scale projects in which several teams are working on different features at the same time.This is called __________.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
72
The meeting meant to reflect on how well the previous sprint went and identify specific actions that can improve future sprints is called a sprint ____________ meeting.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
73
When the project scope and/or technology are not fully known, things become much less predictable.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
74
Traditional approaches to project management concentrate firmly on thorough planning up front.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
75
When faced with a project having multiple stakeholders and a unknown scope, _________ project management methods should be employed
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
76
The more the project scope is unknown, the ___________ of the project will be greater
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
77
Owners have the option to change features and priorities at the end of each sprint if desired.However, no changes should be made once a sprint has started.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
78
The purpose of release planning is to establish the goals and a general WBS for the project.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
79
Scrum does not use any of the conventional project management tools like Gantt charts or network diagrams.
Unlock Deck
Unlock for access to all 98 flashcards in this deck.
Unlock Deck
k this deck
80
Freezing the design as late as possible is a common characteristic of the agile project management model.