Deck 8: Project Quality Management
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/100
Play
Full screen (f)
Deck 8: Project Quality Management
1
Quality is a lower priority than project scope,time,and cost.
False
2
Understanding which variables affect outcome is a very important part of quality planning.
True
3
It is important to clarify what functions and features the system must perform,and what functions and features are optional.
True
4
Quality planning implies the ability to anticipate situations and prepare actions that bring about the desired outcome.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
5
Control charts are one tool used in the analyze phase of the DMAIC process.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
6
The quality planning process involves taking responsibility for quality throughout the project's life cycle.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
7
Continuous quality improvement is not a goal of quality assurance.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
8
In a Pareto chart,the variables described by the histogram are ordered chronologically.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
9
Project managers are ultimately responsible for quality management on their projects.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
10
Most information technology products can reach 100 percent reliability.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
11
Only in-house auditors can perform quality audits.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
12
Most people simply accept poor quality from many information technology products.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
13
To obtain valid statistics,it is important to study every member of a population.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
14
Using Six Sigma principles is an organization-wide commitment.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
15
Design of experiments cannot be applied to project management issues such as cost and schedule trade-offs.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
16
All of the Six Sigma principles are brand new.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
17
The majority of people in the United States use the Internet.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
18
Organizational policies related to quality,the particular project's scope statement and product descriptions,and related standards and regulations are all important input to the quality assurance process.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
19
If products are accepted,they are considered to be validated deliverables.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
20
When an information system does not function correctly,it is generally a slight inconvenience.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
21
ISO 9000 provides minimum requirements needed for an organization to meet its quality certification standards.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
22
Integration testing replaces the other forms of testing with a single comprehensive test.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
23
____ includes identifying which quality standards are relevant to the project and how to satisfy those standards.
A)Performing quality assurance
B)Performing quality control
C)Checking quality
D)Planning quality
A)Performing quality assurance
B)Performing quality control
C)Checking quality
D)Planning quality
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
24
The main outputs of ____ are a quality management plan,quality metrics,quality checklists,a process improvement plan,and project document updates.
A)quality control
B)quality planning
C)quality assurance
D)quality certification
A)quality control
B)quality planning
C)quality assurance
D)quality certification
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
25
The ____ ultimately decides if quality is acceptable.
A)project team
B)CEO
C)project manager
D)customer
A)project team
B)CEO
C)project manager
D)customer
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
26
The term sigma means median.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
27
It took only ____ years for 50 million people to use the Internet compared to 25 years for 50 million people to use telephones.
A)three
B)five
C)seven
D)nine
A)three
B)five
C)seven
D)nine
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
28
____ involves monitoring specific project results to ensure that they comply with the relevant quality standards while identifying ways to improve overall quality.
A)Performing quality assurance
B)Performing quality control
C)Checking quality
D)Planning quality
A)Performing quality assurance
B)Performing quality control
C)Checking quality
D)Planning quality
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
29
____ is the degree to which a system performs its intended function.
A)Reliability
B)Performance
C)Maintainability
D)Functionality
A)Reliability
B)Performance
C)Maintainability
D)Functionality
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
30
The ____ process is often associated with the technical tools and techniques of quality management,such as Pareto charts,quality control charts,and statistical sampling.
A)quality planning
B)quality certification
C)quality assurance
D)quality control
A)quality planning
B)quality certification
C)quality assurance
D)quality control
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
31
DeMarco and Lister found direct correlationsbetween productivity and programming language,years of experience,and salary.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
32
Expectations can vary based on an organization's culture or geographic region.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
33
____ involves periodically evaluating overall project performance to ensure that the project will satisfy the relevant quality standards.
A)Performing quality assurance
B)Performing quality control
C)Checking quality
D)Planning quality
A)Performing quality assurance
B)Performing quality control
C)Checking quality
D)Planning quality
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
34
Modern quality management requires customer satisfaction,prefers prevention to inspection,and recognizes management responsibility for quality.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
35
Minimizing defects does not matter if an organization is making a product that no one wants to buy.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
36
Testing needs to be done during almost every phase of the systems development life cycle.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
37
In TQC,product quality is less important than production rates,and workers are not allowed to stop production whenever a quality problem occurs.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
38
____ means the project's processes and products meet written specifications.
A)Conformance to requirements
B)Fitness for use
C)Quality conformance
D)Documentation matching
A)Conformance to requirements
B)Fitness for use
C)Quality conformance
D)Documentation matching
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
39
Project quality management involves ____ main processes.
A)two
B)three
C)four
D)five
A)two
B)three
C)four
D)five
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
40
Many quality experts believe the main cause of quality problems is the lack of leadership.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
41
____ is action taken to bring rejected items into compliance with product requirements or specifications or other stakeholder expectations.
A)A process adjustment
B)Rework
C)An acceptance decision
D)Auditing
A)A process adjustment
B)Rework
C)An acceptance decision
D)Auditing
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
42
____determine(s)if the products or services produced as part of the project will be accepted or rejected.
A)Process adjustments
B)Rework
C)Acceptance decisions
D)Auditing
A)Process adjustments
B)Rework
C)Acceptance decisions
D)Auditing
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
43
____ involves choosing part of a population of interest for inspection.
A)Statistical sampling
B)Pareto analysis
C)Six Sigma
D)Quality control charting
A)Statistical sampling
B)Pareto analysis
C)Six Sigma
D)Quality control charting
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
44
Six Sigma's target for perfection is the achievement of no more than ____ defects,errors,or mistakes per million opportunities.
A)1.34
B)3.4
C)34
D)340
A)1.34
B)3.4
C)34
D)340
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
45
In any normal distribution,____ percent of the population is within three standard deviations of the mean.
A)95.5
B)99.0
C)99.7
D)99.9
A)95.5
B)99.0
C)99.7
D)99.9
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
46
____ is a comprehensive and flexible systemfor achieving,sustaining and maximizing business success.
A)Statistical sampling
B)Pareto analysis
C)Six Sigma
D)Quality control charting
A)Statistical sampling
B)Pareto analysis
C)Six Sigma
D)Quality control charting
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
47
____ addresses the ease of performing maintenance on a product.
A)Reliability
B)Performance
C)Maintainability
D)Functionality
A)Reliability
B)Performance
C)Maintainability
D)Functionality
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
48
____ correct(s)or prevent(s)further quality problems based on quality control measurements.
A)Process adjustments
B)Rework
C)Acceptance decisions
D)Auditing
A)Process adjustments
B)Rework
C)Acceptance decisions
D)Auditing
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
49
An important tool used in the ____ phase of the DMAIC process is the fishbone or Ishikawa diagram.
A)define
B)measure
C)analyze
D)improve
A)define
B)measure
C)analyze
D)improve
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
50
____ addresses how well a product or service performs the customer's intended use.
A)Reliability
B)Performance
C)Maintainability
D)Functionality
A)Reliability
B)Performance
C)Maintainability
D)Functionality
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
51
Important tools used in the ____ phase of the DMAIC process include a project charter,a description of customer requirements,process maps,and Voice of the Customer (VOC)data.
A)define
B)measure
C)analyze
D)improve
A)define
B)measure
C)analyze
D)improve
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
52
A certainty factor of 1.960 is used for ____ percent desired certainty.
A)75
B)95
C)96
D)99
A)75
B)95
C)96
D)99
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
53
____ generates ideas for quality improvements by comparing specific project practices or product characteristics to those of other projects or products within or outside the performing organization.
A)Design of experiments
B)Quality auditing
C)Testing
D)Benchmarking
A)Design of experiments
B)Quality auditing
C)Testing
D)Benchmarking
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
54
____ help(s)you identify the vital few contributors that account for most quality problems in a system.
A)Statistical sampling
B)Pareto charts
C)Six Sigma
D)Quality control charts
A)Statistical sampling
B)Pareto charts
C)Six Sigma
D)Quality control charts
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
55
A ____ is a bell-shaped curve that is symmetrical regarding the average value of the population (the data being analyzed).
A)skewed distribution
B)normal distribution
C)polynomial distribution
D)symmetrical distribution
A)skewed distribution
B)normal distribution
C)polynomial distribution
D)symmetrical distribution
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
56
____ are the system's special characteristics that appeal to users.
A)Features
B)System outputs
C)Properties
D)Functions
A)Features
B)System outputs
C)Properties
D)Functions
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
57
____ is the ability of a product or service to perform as expected under normal conditions.
A)Reliability
B)Performance
C)Maintainability
D)Functionality
A)Reliability
B)Performance
C)Maintainability
D)Functionality
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
58
A ____ is a graphic display of data that illustrates the results of a process over time.
A)statistical sampling chart
B)Pareto chart
C)Six Sigma chart
D)control chart
A)statistical sampling chart
B)Pareto chart
C)Six Sigma chart
D)control chart
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
59
A(n)____ is any instance where the product or service fails to meet customer requirements.
A)defect
B)failure
C)error
D)recall
A)defect
B)failure
C)error
D)recall
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
60
The ____ states that if seven data points in a row are all below the mean,above the mean,or are all increasing or decreasing,then the process needs to be examined for non-random problems.
A)ten run rule
B)six 9s of quality rule
C)seven run rule
D)Six Sigma rule
A)ten run rule
B)six 9s of quality rule
C)seven run rule
D)Six Sigma rule
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
61
____ wrote Quality Is Free in 1979 and is best known for suggesting that organizations strive for zero defects.
A)Juran
B)Ishikawa
C)Crosby
D)Deming
A)Juran
B)Ishikawa
C)Crosby
D)Deming
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
62
A(n)____________________ is a structured review of specific quality management activities that help identify lessons learned that could improve performance on current or future projects.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
63
____________________ are the screens and reports the system generates.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
64
____ helps integrate traditionally separate organizational functions,set process improvement goals and priorities,provide guidance for quality processes,and provide a point of reference for appraising current processes.
A)SQFD
B)CMM
C)SQMMI
D)CMMI
A)SQFD
B)CMM
C)SQMMI
D)CMMI
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
65
____ is the cost of evaluating processes and their outputs to ensure that a project is error-free or within an acceptable error range.
A)Prevention cost
B)Appraisal cost
C)Internal failure cost
D)External failure cost
A)Prevention cost
B)Appraisal cost
C)Internal failure cost
D)External failure cost
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
66
Examples of common ____________________ include failure rates of products produced,availability of goods and services,and customer satisfaction ratings.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
67
The purpose of ______________________________ is to ensure that the project will satisfy the needs for which it was undertaken.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
68
Juran's final step to quality improvement is ____.
A)organize to reach the goals (establish a quality council,identify problems,select projects,appoint teams,designate facilitators)
B)keep score
C)report progress
D)maintain momentum by making annual improvement part of the regular systems and processes of the company
A)organize to reach the goals (establish a quality council,identify problems,select projects,appoint teams,designate facilitators)
B)keep score
C)report progress
D)maintain momentum by making annual improvement part of the regular systems and processes of the company
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
69
Top management and ____________________ can have the greatest impact on the quality of projects by doing a good job of quality assurance.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
70
Performing ____________________ involves monitoring specific project results to ensure that they comply with the relevant quality standards while identifying ways to improve overall quality.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
71
Performing ____________________ involves periodically evaluating overall project performance to ensure that the project will satisfy the relevant quality standards.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
72
____ is an independent test performed by end users prior to accepting the delivered system.
A)Integration testing
B)Unit testing
C)User acceptance testing
D)System testing
A)Integration testing
B)Unit testing
C)User acceptance testing
D)System testing
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
73
____,a quality system standard developed by the ISO,is a three-part,continuous cycle of planning,controlling,and documenting quality in an organization.
A)IEEE 15504
B)ISO 9000
C)IEEE 9000
D)ISO 15504
A)IEEE 15504
B)ISO 9000
C)IEEE 9000
D)ISO 15504
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
74
____________________ means a product can be used as it was intended.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
75
The International Organization for Standardization (ISO)defines ____________________ as "the totality of characteristics of an entity that bear on its ability to satisfy stated or implied needs."
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
76
_________________________ is a quality planning technique that helps identify which variables have the most influence on the overall outcome of a process.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
77
____ is a cost that relates to all errors not detected and not corrected before delivery to the customer.
A)Prevention cost
B)Appraisal cost
C)Internal failure cost
D)External failure cost
A)Prevention cost
B)Appraisal cost
C)Internal failure cost
D)External failure cost
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
78
A(n)____ is done to test each individual component (often a program)to ensure that it is as defect-free as possible.
A)integration test
B)unit test
C)user acceptance test
D)system test
A)integration test
B)unit test
C)user acceptance test
D)system test
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
79
One of ____ 14 Points for Management states that an organization should cease dependence on inspection to achieve quality.
A)Deming's
B)Juran's
C)Crosby's
D)Ishikawa's
A)Deming's
B)Juran's
C)Crosby's
D)Ishikawa's
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
80
One of ____ ten steps states that an organization should build awareness of the need and opportunity for improvement.
A)Deming's
B)Crosby's
C)Juran's
D)Ishikawa's
A)Deming's
B)Crosby's
C)Juran's
D)Ishikawa's
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck